X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636053014032

Well Details

Well ID: 0636053014032
Loading map...
Location: 03/14-30-063-05W6/2
Location Alias: 03/14-30-63-05 W6M
Location Alias 2: 03/14-30-063-05 W6/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 05
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEX HZ KAKWA 14-30-63-5
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0462964
License Date: 2013-12-23
License Status: Amended
Spud Date: 2013-12-31
Final Drill Date: 2014-03-01
Well Total Depth: 4562.00 m
Surface Hole Latitude: 54.473208
Surface Hole Longitude: -118.743891

For data sources see[1][2]

Well History

Date Event
2013-12-23 Obtained License
2014-01-02 Surface Casing Operation Performed
2014-01-04 Direction Drilling Operation Performed - Deviate
2014-01-10 Intermediate Casing Operation Performed
2014-01-27 Direction Drilling Operation Performed - Horizontal
2014-02-07 Direction Drilling Operation Performed - Horizontal
2014-02-09 Well Log Performed
2014-03-01 Finished Drilling
2014-03-01 Well Log Performed
2014-03-01 Well Mode changed to Drilled and Cased
2014-03-03 Production Casing Operation Performed
2014-03-04 Rig Released
2014-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-30 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-14 Well Fluid changed to Gas
2014-04-14 Well Mode changed to Testing
2014-04-29 Well Began Production
2014-04-29 Well Fluid changed to Gas
2014-04-29 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-01-04 557.80 Deviate (5 - 79 degrees)
2014-01-27 2981.30 Horizontal
2014-02-07 3431.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-15 Multi-Stage Fracture 4530.00 4530.50 0
2014-03-23 Multi-Stage Fracture 3925.00 3925.50 0
2014-03-24 Multi-Stage Fracture 3870.00 3870.50 0
2014-03-24 Multi-Stage Fracture 3815.00 3815.50 0
2014-03-30 Multi-Stage Fracture 3760.00 3760.50 0
2014-03-30 Multi-Stage Fracture 3705.00 3705.50 0
2014-03-31 Multi-Stage Fracture 3650.00 3650.50 0
2014-03-31 Multi-Stage Fracture 3595.00 3595.50 0
2014-04-01 Multi-Stage Fracture 3540.00 3540.50 0
2014-04-01 Multi-Stage Fracture 3481.00 3481.50 0
2014-03-16 Multi-Stage Fracture 4475.00 4475.50 0
2014-03-19 Multi-Stage Fracture 4412.00 4412.50 0
2014-03-19 Multi-Stage Fracture 4365.00 4365.50 0
2014-03-22 Multi-Stage Fracture 4200.00 4200.50 0
2014-03-22 Multi-Stage Fracture 4145.00 4145.50 0
2014-03-23 Multi-Stage Fracture 4087.00 4087.50 0
2014-03-23 Multi-Stage Fracture 4028.00 4028.50 0
2014-03-23 Multi-Stage Fracture 3980.00 3980.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-15 2014-04-01 3,333 1,658 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 38.0973 N/A
CARBOECONOPROP 30/50 IS PROPPANT Baker Hughes Mullite 1302-93-8 100 10.3192 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 10.3192 N/A
Silicon Dioxide. amorphous as glass 7631-86-9 100 10.3192 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 14.4953 N/A
Breaker FLC Baker Hughes Breaker Ethylene glycol 107-21-1 100 0.0001 N/A
Hemicellulase enzyme concentrate 9025-56-3 100 0.0001 N/A
Sucrose 57-50-1 100 0.0001 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0011 N/A
BF-7L Baker Hughes Buffer Non-hazardous Not Available 100 0.044 N/A
Potassium carbonate 584-08-7 100 0.044 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0949 N/A
FP-13L Baker Hughes Defoamer Tributyl phosphate 126-73-8 100 0.0013 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 36.5993 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.201 N/A
Oxyalkylated alcohol 9014 100 0.201 N/A
Petroleum distillates 64742-47-8 100 0.201 N/A
Polyacrylate 9014 100 0.201 N/A
FAW-26 Baker Hughes Surfactant 1-Butoxy-2-propanol 5131-66-8 100 0.1459 N/A
Diethanolamine 111-42-2 100 0.1459 N/A
Ethanol 64-17-5 100 0.1459 N/A
Methanol 67-56-1 100 0.1459 N/A
Polyoxyalkylene sulfate 68891-29-2 100 0.1459 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-13 2014-04-01 Central Water Distribution Facility 2531

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1531 0.0 0.0 0.0
2015 316 0.0 0.0 0.0
2016 27 0.0 0.0 0.0
2017 1497 0.0 0.0 0.0
2018 2072 0.0 0.0 0.0
2019 3418 0.0 0.0 0.0
2020 1348 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-04 No Incident Encountered 0.00 0.00
2014-04-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References