X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636061101000

Well Details

Well ID: 0636061101000
Loading map...
Location: 00/01-11-063-06W6/0
Location Alias: 00/01-11-63-06 W6M
Location Alias 2: 00/01-11-063-06 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 06
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEX HZ KAKWA 1-11-63-6
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0466880
License Date: 2014-05-28
License Status: Amended
Spud Date: 2014-09-23
Final Drill Date: 2014-11-04
Well Total Depth: 5539.00 m
Surface Hole Latitude: 54.434486
Surface Hole Longitude: -118.812962

For data sources see[1][2]

Well History

Date Event
2014-05-28 Obtained License
2014-09-26 Surface Casing Operation Performed
2014-10-08 Intermediate Casing Operation Performed
2014-10-14 Direction Drilling Operation Performed - Deviate
2014-10-15 Kick Occurred
2014-10-20 Direction Drilling Operation Performed - Horizontal
2014-11-04 Finished Drilling
2014-11-04 Well Mode changed to Drilled and Cased
2014-11-07 Production Casing Operation Performed
2014-11-08 Rig Released
2014-11-22 Well Log Performed
2015-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-06-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-23 Well Fluid changed to Gas
2015-06-23 Well Mode changed to Testing
2015-08-12 Well Began Production
2015-08-12 Well Fluid changed to Gas
2015-08-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-23 Precision Drilling Corporation 427 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-14 3337.00 Deviate (5 - 79 degrees)
2014-10-20 3626.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-04 Multi-Stage Fracture 5505.80 5505.90 0
2015-06-05 Multi-Stage Fracture 5243.00 5243.10 0
2015-06-05 Multi-Stage Fracture 5213.80 5213.90 0
2015-06-05 Multi-Stage Fracture 5184.50 5184.60 0
2015-06-05 Multi-Stage Fracture 5155.30 5155.40 0
2015-06-05 Multi-Stage Fracture 5126.00 5126.10 0
2015-06-05 Multi-Stage Fracture 5096.80 5096.90 0
2015-06-06 Multi-Stage Fracture 5076.50 5076.60 0
2015-06-06 Multi-Stage Fracture 5038.30 5038.40 0
2015-06-06 Hydra Jet Perforation 4998.50 4998.60 0
2015-06-06 Multi-Stage Fracture 4998.50 4998.60 0
2015-06-05 Multi-Stage Fracture 5477.10 5477.20 0
2015-06-06 Multi-Stage Fracture 4979.80 4979.90 0
2015-06-06 Multi-Stage Fracture 4950.50 4950.60 0
2015-06-06 Multi-Stage Fracture 4921.30 4921.40 0
2015-06-06 Multi-Stage Fracture 4892.00 4892.10 0
2015-06-06 Multi-Stage Fracture 4862.70 4862.80 0
2015-06-06 Multi-Stage Fracture 4833.50 4833.60 0
2015-06-06 Multi-Stage Fracture 4804.30 4804.40 0
2015-06-06 Multi-Stage Fracture 4775.00 4775.10 0
2015-06-06 Multi-Stage Fracture 4745.70 4745.80 0
2015-06-06 Multi-Stage Fracture 4716.50 4716.60 0
2015-06-05 Multi-Stage Fracture 5447.80 5447.90 0
2015-06-06 Multi-Stage Fracture 4687.20 4687.30 0
2015-06-06 Multi-Stage Fracture 4658.00 4658.10 0
2015-06-06 Multi-Stage Fracture 4628.70 4628.80 0
2015-06-06 Multi-Stage Fracture 4599.50 4599.60 0
2015-06-07 Hydra Jet Perforation 4563.50 4563.60 0
2015-06-07 Hydra Jet Perforation 4563.60 4563.70 0
2015-06-07 Multi-Stage Fracture 4541.00 4541.10 0
2015-06-07 Multi-Stage Fracture 4511.70 4511.80 0
2015-06-07 Multi-Stage Fracture 4480.70 4480.80 0
2015-06-07 Multi-Stage Fracture 4449.70 4449.80 0
2015-06-05 Multi-Stage Fracture 5418.60 5418.70 0
2015-06-07 Multi-Stage Fracture 4418.70 4418.80 0
2015-06-07 Multi-Stage Fracture 4389.50 4389.60 0
2015-06-07 Multi-Stage Fracture 4360.20 4360.30 0
2015-06-07 Multi-Stage Fracture 4301.70 4301.80 0
2015-06-07 Multi-Stage Fracture 4272.40 4272.50 0
2015-06-07 Multi-Stage Fracture 4243.20 4243.30 0
2015-06-08 Multi-Stage Fracture 4213.90 4214.00 0
2015-06-08 Multi-Stage Fracture 4184.60 4184.70 0
2015-06-08 Multi-Stage Fracture 4155.40 4155.50 0
2015-06-08 Multi-Stage Fracture 4126.10 4126.20 0
2015-06-05 Multi-Stage Fracture 5389.30 5389.40 0
2015-06-08 Multi-Stage Fracture 4096.90 4097.00 0
2015-06-08 Multi-Stage Fracture 4067.60 4067.70 0
2015-06-08 Multi-Stage Fracture 4038.30 4038.40 0
2015-06-08 Multi-Stage Fracture 4010.60 4010.70 0
2015-06-08 Multi-Stage Fracture 3981.40 3981.50 0
2015-06-08 Multi-Stage Fracture 3950.60 3950.70 0
2015-06-08 Multi-Stage Fracture 3921.30 3921.40 0
2015-06-08 Multi-Stage Fracture 3892.00 3892.10 0
2015-06-08 Multi-Stage Fracture 3862.80 3862.90 0
2015-06-08 Multi-Stage Fracture 3833.50 3833.60 0
2015-06-05 Multi-Stage Fracture 5360.10 5360.20 0
2015-06-08 Multi-Stage Fracture 3804.30 3804.40 0
2015-06-08 Multi-Stage Fracture 3775.00 3775.10 0
2015-06-08 Multi-Stage Fracture 3745.70 3745.80 0
2015-06-09 Multi-Stage Fracture 3716.50 3716.60 0
2015-06-09 Multi-Stage Fracture 3687.20 3687.30 0
2015-06-09 Multi-Stage Fracture 3658.00 3658.10 0
2015-06-09 Multi-Stage Fracture 3641.40 3641.50 0
2015-06-09 Multi-Stage Fracture 3628.80 3628.90 0
2015-06-09 Multi-Stage Fracture 3608.20 3608.30 0
2015-06-09 Multi-Stage Fracture 3591.60 3591.70 0
2015-06-05 Multi-Stage Fracture 5330.80 5330.90 0
2015-06-05 Multi-Stage Fracture 5301.60 5301.70 0
2015-06-05 Multi-Stage Fracture 5272.30 5272.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-04 2015-06-09 3,549 14,367 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Not Available 100 0.4329 N/A
Water Not Available 100 85.5945 N/A
CARBOHYDROPROP 40/80 PROPPANT Baker Hughes Mullite 1302-93-8 100 3.9226 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 3.9226 N/A
Silicon Dioxide. amorphous as glass 7631-86-9 100 3.9226 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 9.8141 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0388 N/A
Methanol 67-56-1 100 0.0388 N/A
Water 7732-18-5 100 0.0388 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0029 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1938 N/A
Oxyalkylated alcohol 9014 100 0.1938 N/A
Petroleum distillates 64742-47-8 100 0.1938 N/A
Polyacrylate 9014 100 0.1938 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-25 2015-05-30 Recycled Fracturing Water (treated at well site) 14367

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3298 0.0 0.0 0.0
2016 3292 0.0 0.0 0.0
2017 7497 0.0 0.0 0.0
2018 4509 0.0 0.0 0.0
2019 5810 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-15 Kick 3406.00 3406.00
2015-06-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References