X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644263408000

Well Details

Well ID: 0644263408000
Loading map...
Location: 00/08-34-064-26W4/0
Location Alias: 00/08-34-64-26 W4M
Location Alias 2: 00/08-34-064-26 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 26
Section: 34
County/Municipality: Westlock County
Well Name: SEQUOIA BOLLOQUE 8-34-64-26
Operator Name: Sequoia Resources Corp.
License Number: 0144171
License Date: 1990-05-17
License Status: Abandoned
Spud Date: 1990-05-28
Final Drill Date: 1990-06-10
Well Total Depth: 1150.00 m
Surface Hole Latitude: 54.578054
Surface Hole Longitude: -113.837691

For data sources see[1][2]

Well History

Date Event
1990-05-17 Obtained License
1990-05-29 Surface Casing Operation Performed
1990-06-02 Lost Circulation Occurred
1990-06-03 Well Log Performed
1990-06-04 Drill Stem Test Performed
1990-06-05 Drill Stem Test Performed
1990-06-07 Intermediate Casing Operation Performed
1990-06-08 Perforation Treatment Performed - Jet Perforation
1990-06-08 Perforation Treatment Performed - Remedial Casing
1990-06-09 Lost Circulation Occurred
1990-06-10 Finished Drilling
1990-06-10 Well Log Performed
1990-06-11 Plug Back Performed
1990-06-11 Rig Released
1990-07-26 Well Log Performed
1990-07-27 Well Log Performed
1990-07-28 Perforation Treatment Performed - Jet Perforation
1990-08-02 Perforation Treatment Performed - Cement Squeeze
1990-08-02 Well Log Performed
1990-08-03 Well Log Performed
1990-08-04 Perforation Treatment Performed - Jet Perforation
1990-08-07 Well Log Performed
1990-08-08 Perforation Treatment Performed - Jet Perforation
1990-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-17 Perforation Treatment Performed - Cement Squeeze
1990-09-17 Plug Back Performed
1990-09-17 Well Log Performed
1990-09-18 Perforation Treatment Performed - Jet Perforation
1990-09-18 Perforation Treatment Performed - Remedial Casing
1990-09-19 Well Log Performed
1990-09-20 Perforation Treatment Performed - Jet Perforation
1990-10-05 Well Mode changed to Drilled and Cased
1994-06-10 Well Began Production
1994-06-10 Well Fluid changed to Gas
1994-06-10 Well Mode changed to Flowing
2006-09-22 Well Fluid changed to Gas
2006-09-22 Well Mode changed to Suspended
2013-10-22 Perforation Treatment Performed - Cement Plug
2013-10-22 Perforation Treatment Performed - Cement Squeeze
2013-10-22 Plug Back Performed
2013-10-22 Well Fluid changed to Gas
2013-10-22 Well Mode changed to Abandoned Zone
2013-10-24 Well Log Performed
2014-03-30 Perforation Treatment Performed - Cement Plug
2014-03-30 Plug Back Performed
2014-04-01 Well Log Performed
2014-04-03 Perforation Treatment Performed - Cement Plug
2014-04-03 Perforation Treatment Performed - Jet Perforation
2014-04-03 Plug Back Performed
2014-04-03 Well Log Performed
2014-04-05 Perforation Treatment Performed - Cement Plug
2014-04-05 Perforation Treatment Performed - Remedial Casing
2014-04-05 Plug Back Performed
2014-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-04-09 Plug Back Performed
2014-06-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-08 Perforation 651.00 652.00 13
1990-09-17 Cement Squeeze 829.50 831.50 0
1990-09-18 Perforation 664.00 665.00 7
1990-09-18 Remedial Casing Cementing 664.00 665.00 0
1990-09-20 Perforation 659.00 660.00 7
2013-10-22 Cement Squeeze 856.50 864.00 0
2013-10-22 Cement Plug 630.50 884.00 0
2013-10-22 Cement Squeeze 659.00 660.00 0
2014-03-30 Cement Plug 915.00 1050.00 0
2014-04-03 Cement Plug 628.00 915.00 0
2014-04-03 Perforation 485.00 488.00 17
1990-06-08 Remedial Casing Cementing 651.00 652.00 0
2014-04-03 Perforation 485.00 488.00 20
2014-04-05 Remedial Casing Cementing 485.00 488.00 0
2014-04-05 Cement Plug 478.00 488.00 0
2014-04-09 Packing Device Capped w/Cement 469.50 477.50 0
1990-07-28 Perforation 856.50 858.00 7
1990-07-28 Perforation 863.00 864.00 7
1990-08-02 Cement Squeeze 856.50 864.00 0
1990-08-04 Perforation 856.50 858.50 7
1990-08-04 Perforation 863.00 864.00 7
1990-08-08 Perforation 829.50 831.50 7
1990-08-09 Acid Treatment 829.50 831.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4797 0.0 0.0 0.0
1995 8559 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8720 0.0 0.0 0.0
1998 8686 0.0 0.0 0.0
1999 8646 0.0 0.0 0.0
2000 8300 0.0 0.0 0.0
2001 8152 0.0 0.0 0.0
2002 5196 0.0 0.0 0.0
2003 618 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-06-02 Lost Circulation 967.00 967.00
1990-06-09 Lost Circulation 994.00 994.00
2013-10-24 No Incident Encountered 0.00 0.00
2014-04-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References