X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645022415000

Well Details

Well ID: 0645022415000
Loading map...
Location: 00/15-24-064-02W5/0
Location Alias: 00/15-24-64-02 W5M
Location Alias 2: 00/15-24-064-02 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 02
Section: 24
County/Municipality: Westlock County
Well Name: PEOC JARVIEN 15-24-64-2
Operator Name: Sequoia Resources Corp.
License Number: 0089538
License Date: 1981-03-13
License Status: Suspension
Spud Date: 1981-03-20
Final Drill Date: 1981-04-17
Well Total Depth: 1574.50 m
Surface Hole Latitude: 54.556659
Surface Hole Longitude: -114.163778

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-03-13 Obtained License
1981-03-29 Lost Circulation Occurred
1981-03-30 Drill Stem Test Performed
1981-03-31 Kick Occurred
1981-04-11 Production Casing Operation Performed
1981-04-13 Lost Circulation Occurred
1981-04-17 Finished Drilling
1981-04-17 Lost Circulation Occurred
1981-04-20 Drill Stem Test Performed
1981-04-22 Drill Stem Test Performed
1981-09-16 Perforation Treatment Performed - Jet Perforation
1981-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-19 Perforation Treatment Performed - Cement Squeeze
1981-09-22 Perforation Treatment Performed - Cement Squeeze
1981-09-24 Perforation Treatment Performed - Jet Perforation
1981-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-11-30 Perforation Treatment Performed - Jet Perforation
1981-12-03 Perforation Treatment Performed - Cement Squeeze
1981-12-04 Perforation Treatment Performed - Jet Perforation
1981-12-15 Well Mode changed to Drilled and Cased
1997-03-01 Well Began Production
1997-03-01 Well Fluid changed to Gas
1997-03-01 Well Mode changed to Flowing
2004-03-01 Well Fluid changed to Gas
2004-03-01 Well Mode changed to Suspended
2005-11-29 Well Log Performed
2005-11-30 Perforation Treatment Performed - Jet Perforation
2007-11-18 Perforation Treatment Performed - Jet Perforation
2007-11-28 Well Fluid changed to Gas
2007-11-28 Well Mode changed to Flowing
2007-12-01 Well Fluid changed to Gas
2007-12-01 Well Mode changed to Suspended
2008-07-14 Perforation Treatment Performed - Jet Perforation
2008-11-26 Perforation Treatment Performed - Jet Perforation
2008-11-27 Perforation Treatment Performed - Jet Perforation
2009-12-04 Perforation Treatment Performed - Jet Perforation
2009-12-05 Perforation Treatment Performed - Jet Perforation
2010-08-21 Perforation Treatment Performed - Jet Perforation
2010-08-24 Well Fluid changed to Shale Gas Only
2010-08-24 Well Mode changed to Flowing
2015-09-14 Well Fluid changed to Shale Gas Only
2015-09-14 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-09-16 Perforation 945.00 949.00 13
1981-11-30 Perforation 877.00 877.30 13
1981-12-03 Cement Squeeze 877.00 877.30 0
1981-12-04 Perforation 859.50 863.50 7
1981-12-04 Perforation 853.00 857.50 7
2005-11-30 Perforation 787.00 791.00 20
2007-11-18 Perforation 870.00 871.50 14
2007-11-18 Perforation 867.00 868.50 14
2008-07-14 Perforation 718.00 720.00 14
2008-11-26 Perforation 670.00 671.00 14
2008-11-27 Perforation 660.50 664.00 14
1981-09-18 Acid Treatment 945.00 949.00 0
2008-11-27 Perforation 657.00 658.00 14
2009-12-04 Perforation 689.00 692.00 14
2009-12-04 Perforation 684.00 685.00 14
2009-12-05 Perforation 650.50 651.50 14
2009-12-05 Perforation 619.00 620.50 14
2010-08-21 Perforation 827.00 832.00 14
2010-08-21 Perforation 787.00 791.00 14
2010-08-21 Perforation 752.00 757.00 20
1981-09-19 Cement Squeeze 945.00 949.00 0
1981-09-22 Cement Squeeze 945.00 949.00 0
1981-09-24 Perforation 932.00 935.00 7
1981-09-24 Perforation 928.00 930.00 7
1981-09-26 Acid Treatment 928.00 935.00 0
1981-09-27 Acid Treatment 928.00 935.00 0
1981-09-29 Packing Device Capped w/Cement 917.00 925.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 7215 0.0 0.0 0.0
1998 8680 0.0 0.0 0.0
1999 8499 0.0 0.0 0.0
2000 8249 0.0 0.0 0.0
2001 8469 0.0 0.0 0.0
2002 8555 0.0 0.0 0.0
2003 6821 0.0 0.0 0.0
2007 24 0.0 0.0 0.0
2010 1056 0.0 0.0 0.0
2011 7138 0.0 0.0 0.0
2012 7811 0.0 0.0 0.0
2013 8202 0.0 0.0 0.0
2014 5184 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-03-29 Lost Circulation 1103.00 1203.00
1981-03-31 Kick 1103.00 1203.00
1981-04-13 Lost Circulation 1239.00 1239.00
1981-04-17 Lost Circulation 1574.50 1574.50

For data sources see[6]

References