X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656060912003

Well Details

Well ID: 0656060912003
Loading map...
Location: 00/12-09-065-06W6/3
Location Alias: 00/12-09-65-06 W6M
Location Alias 2: 00/12-09-065-06 W6/03
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST BILBO 12-9-65-6
Operator Name: Harvest Operations Corp.
License Number: 0312755
License Date: 2004-07-30
License Status: Issued
Spud Date: 2004-08-20
Final Drill Date: 2004-09-08
Well Total Depth: 2765.00 m
Surface Hole Latitude: 54.612651
Surface Hole Longitude: -118.851566

For data sources see[1][2]

Well History

Date Event
2004-07-30 Obtained License
2004-08-24 Surface Casing Operation Performed
2004-09-08 Finished Drilling
2004-09-08 Well Log Performed
2004-09-08 Well Mode changed to Drilled and Cased
2004-09-16 Production Casing Operation Performed
2004-09-18 Rig Released
2004-10-11 Perforation Treatment Performed - Jet Perforation
2004-10-11 Well Log Performed
2004-10-14 Perforation Treatment Performed - Fractured
2004-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-16 Plug Back Performed
2004-10-28 Perforation Treatment Performed - Jet Perforation
2004-10-28 Well Log Performed
2004-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-30 Plug Back Performed
2004-10-30 Well Log Performed
2004-10-31 Perforation Treatment Performed - Jet Perforation
2004-11-01 Perforation Treatment Performed - Fractured
2004-11-05 Perforation Treatment Performed - Jet Perforation
2004-11-05 Well Log Performed
2004-11-08 Perforation Treatment Performed - Fractured
2005-07-29 Well Began Production
2005-07-29 Well Fluid changed to Gas
2005-07-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-11 Perforation 2714.00 2721.00 17
2004-11-08 Fracture 2234.00 2241.00 0
2004-10-14 Fracture 2714.00 2721.00 0
2004-10-16 Packing Device Capped w/Cement 2695.00 2703.00 0
2004-10-28 Perforation 2592.00 2595.00 17
2004-10-30 Packing Device Capped w/Cement 2577.00 2585.00 0
2004-10-31 Perforation 2380.00 2383.00 17
2004-11-01 Fracture 2380.00 2383.00 0
2004-11-05 Perforation 2237.50 2241.00 17
2004-11-05 Perforation 2234.00 2237.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2208 0.0 0.0 0.0
2006 7421 0.0 0.0 0.0
2007 8412 0.0 0.0 0.0
2008 7738 0.0 0.0 0.0
2009 8404 0.0 0.0 0.0
2010 8695 0.0 0.0 0.0
2011 7438 0.0 0.0 0.0
2012 7241 0.0 0.0 0.0
2013 5799 0.0 0.0 0.0
2014 2875 0.0 0.0 0.0
2016 7293 0.0 0.0 0.0
2017 8434 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8302 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[5]

References