X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666133007000

Well Details

Well ID: 0666133007000
Loading map...
Location: 00/07-30-066-13W6/0
Location Alias: 00/07-30-66-13 W6M
Location Alias 2: 00/07-30-066-13 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 13
Section: 30
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE WAPITI 7-30-66-13
Operator Name: Cenovus Energy Inc.
License Number: 0297563
License Date: 2003-12-02
License Status: RecCertified
Spud Date: 2004-01-06
Final Drill Date: 2004-01-21
Well Total Depth: 2820.00 m
Surface Hole Latitude: 54.739781
Surface Hole Longitude: -119.951788

For data sources see[1][2]

Well History

Date Event
2003-12-02 Obtained License
2004-01-07 Lost Circulation Occurred
2004-01-09 Surface Casing Operation Performed
2004-01-13 Lost Circulation Occurred
2004-01-16 Direction Drilling Operation Performed - Deviate
2004-01-18 Well Log Performed
2004-01-21 Finished Drilling
2004-01-21 Well Log Performed
2004-01-21 Well Mode changed to Drilled and Cased
2004-01-22 Plug Back Performed
2004-01-23 Plug Back Performed
2004-01-23 Well Log Performed
2004-01-24 Rig Released
2004-02-10 Perforation Treatment Performed - Jet Perforation
2004-02-11 Perforation Treatment Performed - Remedial Casing
2004-02-12 Perforation Treatment Performed - Jet Perforation
2004-02-12 Well Log Performed
2004-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-13 Well Log Performed
2004-02-21 Perforation Treatment Performed - Remedial Casing
2004-02-23 Well Abandoned
2004-02-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-01-16 2208.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-10 Perforation 215.00 216.00 4
2004-02-10 Perforation 20.00 21.00 4
2004-02-11 Remedial Casing Cementing 215.00 216.00 0
2004-02-12 Perforation 187.00 188.00 4
2004-02-13 Packing Device Capped w/Cement 167.00 175.00 0
2004-02-21 Remedial Casing Cementing 20.00 21.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-01-07 Lost Circulation 232.00 359.00
2004-01-13 Lost Circulation 1725.00 2689.00

For data sources see[6]

References