If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0685250116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.880566,"lon":-117.656968,"icon":""}]} |
Location: 00/16-01-068-25W5/0 | |
Location Alias: 00/16-01-68-25 W5M | |
Location Alias 2: 00/16-01-068-25 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 5 | |
Range: 25 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ARC HZ ANTEN 16-1-68-25 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0482938 | |
License Date: 2017-02-22 | |
License Status: Issued | |
Spud Date: 2017-04-07 | |
Final Drill Date: 2017-04-14 | |
Well Total Depth: 3753.00 m | |
Surface Hole Latitude: 54.880566 | |
Surface Hole Longitude: -117.656968 |
Date | Event |
---|---|
2017-02-22 | Obtained License |
2017-04-08 | Surface Casing Operation Performed |
2017-04-11 | Direction Drilling Operation Performed - Deviate |
2017-04-11 | Well Log Performed |
2017-04-12 | Direction Drilling Operation Performed - Horizontal |
2017-04-14 | Finished Drilling |
2017-04-14 | Well Log Performed |
2017-04-14 | Well Mode changed to Drilled and Cased |
2017-04-15 | Production Casing Operation Performed |
2017-04-15 | Rig Released |
2017-07-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-15 | Well Began Production |
2017-11-15 | Well Fluid changed to Crude Oil |
2017-11-15 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-04-07 | Precision Drilling Corporation | 529 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-04-11 | 1472.50 | Deviate (5 - 79 degrees) |
2017-04-12 | 1983.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-07-20 | Multi-Stage Fracture | 3697.80 | 3697.90 | 0 |
2017-07-21 | Multi-Stage Fracture | 2969.70 | 2969.80 | 0 |
2017-07-21 | Multi-Stage Fracture | 2880.90 | 2881.00 | 0 |
2017-07-21 | Multi-Stage Fracture | 2791.90 | 2792.00 | 0 |
2017-07-21 | Multi-Stage Fracture | 2714.90 | 2715.00 | 0 |
2017-07-21 | Multi-Stage Fracture | 2625.80 | 2625.90 | 0 |
2017-07-21 | Multi-Stage Fracture | 2536.80 | 2536.90 | 0 |
2017-07-21 | Multi-Stage Fracture | 2459.80 | 2459.90 | 0 |
2017-07-21 | Multi-Stage Fracture | 2371.00 | 2371.10 | 0 |
2017-07-21 | Multi-Stage Fracture | 2282.20 | 2282.30 | 0 |
2017-07-21 | Multi-Stage Fracture | 2157.00 | 2157.10 | 0 |
2017-07-20 | Multi-Stage Fracture | 3644.80 | 3644.90 | 0 |
2017-07-20 | Multi-Stage Fracture | 3556.10 | 3556.20 | 0 |
2017-07-20 | Multi-Stage Fracture | 3479.10 | 3479.20 | 0 |
2017-07-20 | Multi-Stage Fracture | 3390.00 | 3390.10 | 0 |
2017-07-20 | Multi-Stage Fracture | 3300.90 | 3301.00 | 0 |
2017-07-21 | Multi-Stage Fracture | 3223.90 | 3224.00 | 0 |
2017-07-21 | Multi-Stage Fracture | 3134.90 | 3135.00 | 0 |
2017-07-21 | Multi-Stage Fracture | 3046.30 | 3046.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-20 | 2017-07-21 | 1,872 | 5,199 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 84.1441 | N/A | |||
20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 15.135 | N/A | ||
50/140 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 0.3115 | N/A | ||
15% HCL Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.2087 | N/A | |
Water | 7732-18-5 | 100 | 0.2087 | N/A | ||||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0087 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0087 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0087 | N/A | ||||
SCI-9 (Corrosion Inhibitor) | Step Energy Services | Corrosion Inhibitor | Acetophenone. thiourea. formaldehyde polymer | 68527-49-1 | 100 | 0.0006 | N/A | |
Butyl cellosolve | 111-76-2 | 100 | 0.0006 | N/A | ||||
Cinnamaldehyde | 104-55-2 | 100 | 0.0006 | N/A | ||||
Ethylene Glycol | 107-21-1 | 100 | 0.0006 | N/A | ||||
Formic Acid | 64-18-6 | 100 | 0.0006 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0006 | N/A | ||||
Polyether | Not Available | 100 | 0.0006 | N/A | ||||
SNE-3 (Non-Emulsifier) | Step Energy Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.1636 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.1636 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.1636 | N/A | ||||
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl ammonium dichloride |
68607-28-3 | 100 | 0.1636 | N/A | ||||
SFR-302 (Friction Reducer) | Step Energy Services | Friction Reducer | Proprietary | Not Available | 100 | 0.019 | N/A | |
Sodium Chloride | 7647-14-5 | 100 | 0.019 | N/A | ||||
SML-7 (Metal to Metal Lubricant) | Step Energy Services | Friction Reducer | Non-Hazardous Ingredients | Not Available | 100 | 0.0122 | N/A | |
SAS-4 (Anti-Sludge) | Step Energy Services | Surfactant | 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated | 119345-03-8 | 100 | 0.001 | N/A | |
Alkylbenzene sulfonic acid | 27176-87-0 | 100 | 0.001 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.001 | N/A | ||||
Xylene | 1330-20-7 | 100 | 0.001 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-07-21 | 2017-07-21 | Surface Water - Runoff | 5199 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 880 | 0.0 | 0.0 | 0.0 |
2018 | 6563 | 0.0 | 0.0 | 0.0 |
2019 | 7742 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-04-15 | No Incident Encountered | 0.00 | 0.00 |
2017-07-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]