X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686120410002

Well Details

Well ID: 0686120410002
Loading map...
Location: 00/10-04-068-12W6/2
Location Alias: 00/10-04-68-12 W6M
Location Alias 2: 00/10-04-068-12 W6/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 12
Section: 04
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE WAPITI 10-4-68-12
Operator Name: Cenovus Energy Inc.
License Number: 0074826
License Date: 1979-03-08
License Status: Issued
Spud Date: 1979-03-17
Final Drill Date: 1979-05-24
Well Total Depth: 3171.00 m
Surface Hole Latitude: 54.860695
Surface Hole Longitude: -119.762636

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-08 Obtained License
1979-03-17 Direction Drilling Operation Performed - 98
1979-04-19 Lost Circulation Occurred
1979-05-24 Finished Drilling
1979-05-24 Well Mode changed to Drilled and Cased
1979-05-28 Liner Casing Operation Performed
1979-07-27 Perforation Treatment Performed - Jet Perforation
1979-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-30 Perforation Treatment Performed - Jet Perforation
1979-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-09-21 Perforation Treatment Performed - Jet Perforation
1979-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-02 Perforation Treatment Performed - Jet Perforation
1980-04-03 Perforation Treatment Performed - Jet Perforation
1980-04-06 Perforation Treatment Performed - Cement Squeeze
1980-04-10 Perforation Treatment Performed - Jet Perforation
1980-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-06-10 Perforation Treatment Performed - Jet Perforation
1980-08-06 Perforation Treatment Performed - Cement Squeeze
1980-08-07 Perforation Treatment Performed - Cement Squeeze
1980-08-11 Perforation Treatment Performed - Cement Squeeze
1980-08-15 Perforation Treatment Performed - Cement Squeeze
1980-08-18 Perforation Treatment Performed - Jet Perforation
1980-08-19 Perforation Treatment Performed - Jet Perforation
2002-11-22 Well Log Performed
2002-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-23 Plug Back Performed
2002-11-24 Perforation Treatment Performed - Cement Squeeze
2002-11-28 Perforation Treatment Performed - Jet Perforation
2002-11-28 Well Log Performed
2002-12-01 Perforation Treatment Performed - Fractured
2002-12-18 Well Began Production
2002-12-18 Well Fluid changed to Gas
2002-12-18 Well Mode changed to Flowing
2003-10-01 Well Fluid changed to Gas
2003-10-01 Well Mode changed to Pumping
2013-12-12 Perforation Treatment Performed - Jet Perforation
2014-01-25 Perforation Treatment Performed - Fractured
2014-02-12 Well Fluid changed to Gas
2014-02-12 Well Mode changed to Pumping
2018-06-18 Well Fluid changed to Gas
2018-06-18 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-03-17 2453.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-27 Perforation 3105.00 3114.00 7
1979-09-22 Acid Treatment 2818.00 2830.00 0
1980-04-02 Packing Device Capped w/Cement 2800.00 2800.00 0
1980-04-02 Perforation 859.00 860.00 13
1980-04-03 Perforation 830.00 831.00 13
1980-04-06 Cement Squeeze 2497.00 2503.00 0
1980-04-10 Perforation 2715.00 2724.00 13
1980-06-01 Packing Device Capped w/Cement 2710.00 2710.00 0
1980-06-10 Perforation 2461.00 2484.00 13
1980-06-10 Perforation 2497.00 2503.00 13
1980-08-06 Cement Squeeze 2497.00 2503.00 0
1979-07-27 Perforation 3116.00 3119.00 7
1980-08-07 Cement Squeeze 2461.00 2484.00 0
1980-08-11 Cement Squeeze 2715.00 2724.00 0
1980-08-15 Cement Squeeze 2818.00 2830.00 0
1980-08-18 Perforation 2948.00 2953.00 13
1980-08-19 Perforation 2948.00 2953.00 13
2002-11-23 Packing Device Capped w/Cement 2837.00 2845.00 0
2002-11-24 Cement Squeeze 830.00 831.00 0
2002-11-28 Perforation 2819.00 2825.00 20
2002-12-01 Fracture 2819.00 2825.00 0
2013-12-12 Perforation 2478.00 2483.00 20
1979-07-28 Acid Treatment 3105.00 3119.00 0
2013-12-12 Perforation 2462.00 2468.00 20
2013-12-12 Perforation 2499.00 2503.00 20
2014-01-25 Fracture 2462.00 2483.00 0
2014-01-25 Fracture 2499.00 2503.00 0
1979-08-28 Packing Device Capped w/Cement 3059.50 3064.50 0
1979-08-30 Perforation 2872.00 2891.00 13
1979-08-30 Perforation 2911.00 2920.00 13
1979-09-01 Acid Treatment 2872.00 2920.00 0
1979-09-20 Packing Device Capped w/Cement 2850.00 2867.00 0
1979-09-21 Perforation 2818.00 2830.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 265 0.0 0.0 0.0
2003 8580 0.0 0.0 0.0
2004 8562 0.0 0.0 0.0
2005 8687 0.0 0.0 0.0
2006 8687 0.0 0.0 0.0
2007 7944 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 7872 0.0 0.0 0.0
2014 6921 0.0 0.0 0.0
2015 8376 0.0 0.0 0.0
2016 8591 0.0 0.0 0.0
2017 8320 0.0 0.0 0.0
2018 8612 0.0 0.0 0.0
2019 8549 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-04-19 Lost Circulation 2450.00 2450.00
2014-02-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References