X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686133604000

Well Details

Well ID: 0686133604000
Loading map...
Location: 00/04-36-068-13W6/0
Location Alias: 00/04-36-68-13 W6M
Location Alias 2: 00/04-36-068-13 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 13
Section: 36
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE WAPITI 4-36-68-13
Operator Name: Cenovus Energy Inc.
License Number: 0427446
License Date: 2010-12-10
License Status: Issued
Spud Date: 2011-03-21
Final Drill Date: 2011-04-24
Well Total Depth: 4365.00 m
Surface Hole Latitude: 54.914705
Surface Hole Longitude: -119.834048

For data sources see[1][2]

Well History

Date Event
2010-12-10 Obtained License
2011-03-24 Surface Casing Operation Performed
2011-03-29 Direction Drilling Operation Performed - Horizontal
2011-04-07 Well Log Performed
2011-04-08 Intermediate Casing Operation Performed
2011-04-24 Finished Drilling
2011-04-24 Well Log Performed
2011-04-24 Well Mode changed to Drilled and Cased
2011-04-26 Liner Casing Operation Performed
2011-04-26 Perforation Treatment Performed - Open-Hole Completion
2011-04-27 Rig Released
2011-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-11 Well Fluid changed to Gas
2011-08-11 Well Mode changed to Testing
2011-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-16 Perforation Treatment Performed - Jet Perforation
2011-08-16 Well Fluid changed to Gas
2011-08-16 Well Mode changed to Test Completed
2011-08-19 Perforation Treatment Performed - Fractured
2011-08-24 Well Fluid changed to Gas
2011-08-24 Well Mode changed to Testing
2011-08-31 Well Fluid changed to Gas
2011-08-31 Well Mode changed to Test Completed
2011-09-27 Well Began Production
2011-09-27 Well Fluid changed to Gas
2011-09-27 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-29 2178.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-04-26 Open Hole/Barefoot Completion 4263.50 4365.00 0
2011-08-12 Multi-Stage Fracture 3282.60 3283.10 0
2011-08-13 Multi-Stage Fracture 3135.80 3136.30 0
2011-08-13 Multi-Stage Fracture 2990.60 2991.10 0
2011-08-16 Perforation 2665.00 2667.00 17
2011-08-16 Perforation 2660.00 2662.00 17
2011-08-16 Perforation 2653.00 2654.00 17
2011-08-16 Perforation 2627.00 2628.00 17
2011-08-19 Fracture 2627.00 2667.00 0
2011-08-11 Multi-Stage Fracture 4240.20 4240.70 0
2011-08-11 Multi-Stage Fracture 4237.70 4238.20 0
2011-08-11 Multi-Stage Fracture 4145.50 4146.00 0
2011-08-11 Multi-Stage Fracture 4007.10 4007.60 0
2011-08-12 Multi-Stage Fracture 3858.60 3859.10 0
2011-08-12 Multi-Stage Fracture 3712.80 3713.30 0
2011-08-12 Multi-Stage Fracture 3566.60 3567.10 0
2011-08-12 Multi-Stage Fracture 3419.30 3419.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2270 0.0 0.0 0.0
2012 8642 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8294 0.0 0.0 0.0
2015 8308 0.0 0.0 0.0
2016 8426 0.0 0.0 0.0
2017 8355 0.0 0.0 0.0
2018 8353 0.0 0.0 0.0
2019 8428 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References