X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695192914002

Well Details

Well ID: 0695192914002
Loading map...
Location: 00/14-29-069-19W5/2
Location Alias: 00/14-29-69-19 W5M
Location Alias 2: 00/14-29-069-19 W5/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 19
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONGVIEW SUNSET 14-29-69-19
Operator Name: Enercapita Energy Ltd.
License Number: 0018470
License Date: 1960-01-11
License Status: Suspension
Spud Date: 1960-01-29
Final Drill Date: 1960-03-13
Well Total Depth: 2899.60 m
Surface Hole Latitude: 55.008675
Surface Hole Longitude: -116.864328

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-11 Obtained License
1960-02-05 Drill Stem Test Performed
1960-02-07 Drill Stem Test Performed
1960-02-09 Drill Stem Test Performed
1960-03-13 Finished Drilling
1960-03-13 Well Mode changed to Drilled and Cased
1960-03-14 Drill Stem Test Performed
1960-03-15 Drill Stem Test Performed
1960-03-23 Production Casing Operation Performed
1960-03-28 Perforation Treatment Performed - Bullet Perforation
1960-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1960-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-03-31 Perforation Treatment Performed - Fractured
1997-06-09 Perforation Treatment Performed - Jet Perforation
1997-06-09 Well Log Performed
1997-06-13 Perforation Treatment Performed - Fractured
1997-07-08 Well Log Performed
2018-11-13 Perforation Treatment Performed - Jet Perforation
2018-11-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-28 Bullet Perforation 2727.40 2728.00 7
1960-03-30 Hydra Jet Perforation 1451.80 1452.00 0
1960-03-31 Fracture 1446.60 1446.60 0
1960-03-31 Fracture 1446.60 1452.00 0
1997-06-09 Perforation 1450.50 1461.50 13
1997-06-13 Fracture 1450.50 1461.50 0
2018-11-13 Perforation 1513.30 1518.80 20
1960-03-28 Bullet Perforation 2725.50 2726.10 7
1960-03-28 Bullet Perforation 2721.90 2722.50 7
1960-03-28 Bullet Perforation 2718.50 2718.80 7
1960-03-28 Bullet Perforation 2716.40 2717.60 7
1960-03-28 Bullet Perforation 2713.90 2715.50 7
1960-03-29 Acid Treatment 2713.90 2728.00 0
1960-03-30 Packing Device Capped w/Cement 2706.60 2706.60 0
1960-03-30 Hydra Jet Perforation 1446.60 1446.60 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-14 No Incident Encountered 0.00 0.00

For data sources see[5]

References