X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696111610000

Well Details

Well ID: 0696111610000
Loading map...
Location: 00/10-16-069-11W6/0
Location Alias: 00/10-16-69-11 W6M
Location Alias 2: 00/10-16-069-11 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 11
Section: 16
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-16-69-11
Operator Name: Cenovus Energy Inc.
License Number: 0081438
License Date: 1980-02-29
License Status: Suspension
Spud Date: 1980-03-28
Final Drill Date: 1980-05-05
Well Total Depth: 2268.00 m
Surface Hole Latitude: 54.974903
Surface Hole Longitude: -119.613938

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-29 Obtained License
1980-05-05 Finished Drilling
1980-05-05 Perforation Treatment Performed - Open-Hole Completion
1980-05-05 Well Mode changed to Drilled and Cased
1980-05-15 Production Casing Operation Performed
1980-10-13 Perforation Treatment Performed - Fractured
1980-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-22 Perforation Treatment Performed - Jet Perforation
1980-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-04 Perforation Treatment Performed - Jet Perforation
1980-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-16 Perforation Treatment Performed - Fractured
1980-12-17 Perforation Treatment Performed - Fractured
1981-10-21 Well Began Production
1981-10-21 Well Fluid changed to Gas
1981-10-21 Well Mode changed to Flowing
1997-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-06 Plug Back Performed
1997-07-06 Well Fluid changed to Gas
1997-07-06 Well Log Performed
1997-07-06 Well Mode changed to Abandoned Zone
1997-07-07 Perforation Treatment Performed - Jet Perforation
1997-07-07 Well Log Performed
1997-07-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-05 Open Hole/Barefoot Completion 2215.80 2268.00 0
1997-07-06 Packing Device Capped w/Cement 2079.00 2087.00 0
1997-07-07 Perforation 1982.00 1991.00 13
1997-07-11 Fracture 1982.00 1991.00 0
1980-10-13 Fracture 2215.80 2268.00 0
1980-10-20 Packing Device Capped w/Cement 2195.00 2195.00 0
1980-10-22 Perforation 2109.50 2113.30 7
1980-11-03 Packing Device Capped w/Cement 2104.00 2109.00 0
1980-11-04 Perforation 2089.20 2100.30 6
1980-12-13 Acid Treatment 2089.20 2100.30 0
1980-12-16 Fracture 2089.20 2100.30 0
1980-12-17 Fracture 2089.20 2100.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 997 0.0 0.0 0.0
1982 6272 0.0 0.0 0.0
1983 3664 0.0 0.0 0.0
1984 5084 0.0 0.0 0.0
1985 4379 0.0 0.0 0.0
1986 6177 0.0 0.0 0.0
1987 7440 0.0 0.0 0.0
1988 3817 0.0 0.0 0.0
1989 4471 0.0 0.0 0.0
1990 5111 0.0 0.0 0.0
1991 7220 0.0 0.0 0.0
1992 7266 0.0 0.0 0.0
1993 5750 0.0 0.0 0.0
1994 3474 0.0 0.0 0.0
1995 6172 0.0 0.0 0.0
1996 1432 0.0 0.0 0.0
1997 1668 0.0 0.0 0.0

For data sources see[5]

References