X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696112307000

Well Details

Well ID: 0696112307000
Loading map...
Location: 00/07-23-069-11W6/0
Location Alias: 00/07-23-69-11 W6M
Location Alias 2: 00/07-23-069-11 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 11
Section: 23
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 7-23-69-11
Operator Name: Cenovus Energy Inc.
License Number: 0066810
License Date: 1977-11-18
License Status: Issued
Spud Date: 1978-05-03
Final Drill Date: 1978-06-08
Well Total Depth: 2156.70 m
Surface Hole Latitude: 54.985665
Surface Hole Longitude: -119.562035

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-18 Obtained License
1978-06-08 Finished Drilling
1978-06-14 Production Casing Operation Performed
1978-06-15 Well Mode changed to Drilled and Cased
1980-02-11 Perforation Treatment Performed - Jet Perforation
1980-03-07 Perforation Treatment Performed - Fractured
1980-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-18 Perforation Treatment Performed - Jet Perforation
1980-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-04 Perforation Treatment Performed - Fractured
1980-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-07-05 Perforation Treatment Performed - Jet Perforation
1980-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-10 Perforation Treatment Performed - Fractured
1980-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-07-30 Perforation Treatment Performed - Jet Perforation
1980-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-01 Perforation Treatment Performed - Fractured
1980-08-04 Perforation Treatment Performed - Cement Squeeze
1980-11-10 Perforation Treatment Performed - Jet Perforation
1980-11-19 Perforation Treatment Performed - Jet Perforation
1980-11-20 Perforation Treatment Performed - Jet Perforation
1980-11-21 Perforation Treatment Performed - Jet Perforation
1981-10-01 Well Began Production
1981-10-01 Well Fluid changed to Gas
1981-10-01 Well Mode changed to Flowing
1983-09-20 Perforation Treatment Performed - Cement Plug
1983-09-20 Perforation Treatment Performed - Cement Squeeze
1983-09-24 Perforation Treatment Performed - Fractured
1983-10-01 Perforation Treatment Performed - Fractured
1993-12-01 Well Log Performed
1993-12-02 Perforation Treatment Performed - Jet Perforation
1993-12-02 Well Log Performed
1993-12-03 Perforation Treatment Performed - Fractured
1993-12-08 Perforation Treatment Performed - Jet Perforation
1993-12-08 Well Log Performed
1993-12-10 Perforation Treatment Performed - Fractured
1994-03-21 Well Fluid changed to Gas
1994-03-21 Well Mode changed to Flowing
1996-08-01 Well Fluid changed to Gas
1996-08-01 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2018-06-18 Well Fluid changed to Gas
2018-06-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-11 Perforation 2103.00 2105.00 6
1980-07-05 Perforation 2055.00 2059.00 6
1980-07-06 Acid Treatment 2055.00 2059.00 0
1980-07-10 Fracture 2055.00 2059.00 0
1980-07-29 Packing Device Capped w/Cement 2044.00 2046.00 0
1980-07-30 Perforation 1932.00 1936.00 6
1980-07-31 Acid Treatment 1932.00 1936.00 0
1980-08-01 Acid Treatment 1932.00 1936.00 0
1980-08-01 Fracture 1932.00 1936.00 0
1980-08-04 Cement Squeeze 1932.00 1936.00 0
1980-11-10 Perforation 2055.00 2059.00 6
1980-02-11 Perforation 2107.00 2110.00 6
1980-11-19 Perforation 2067.00 2070.00 13
1980-11-20 Perforation 2072.00 2075.00 13
1980-11-21 Perforation 2103.00 2105.00 6
1980-11-21 Perforation 2107.00 2110.00 6
1983-09-20 Cement Squeeze 2067.00 2075.00 0
1983-09-20 Cement Plug 2065.00 2095.00 0
1983-09-24 Fracture 2055.00 2059.00 0
1983-10-01 Fracture 2055.00 2059.00 0
1993-12-02 Perforation 1564.50 1568.50 13
1993-12-03 Fracture 1564.50 1568.50 0
1980-03-07 Fracture 2103.00 2110.00 0
1993-12-08 Perforation 1466.00 1473.00 13
1993-12-10 Fracture 1466.00 1473.00 0
1980-04-17 Packing Device Capped w/Cement 2095.00 2098.00 0
1980-04-18 Perforation 2067.00 2070.00 13
1980-04-18 Perforation 2072.00 2075.00 13
1980-04-24 Acid Treatment 2067.00 2075.00 0
1980-06-04 Fracture 2067.00 2075.00 0
1980-07-04 Packing Device Capped w/Cement 2063.00 2065.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 86 0.0 0.0 0.0
1981 1448 0.0 0.0 0.0
1982 2466 0.0 0.0 0.0
1983 732 0.0 0.0 0.0
1984 6030 0.0 0.0 0.0
1985 4762 0.0 0.0 0.0
1986 1463 0.0 0.0 0.0
1987 10 0.0 0.0 0.0
1988 589 0.0 0.0 0.0
1989 5169 0.0 0.0 0.0
1990 5771 0.0 0.0 0.0
1991 5532 0.0 0.0 0.0
1992 6257 0.0 0.0 0.0
1993 6972 0.0 0.0 0.0
1994 7081 0.0 0.0 0.0
1995 8689 0.0 0.0 0.0
1996 8292 0.0 0.0 0.0
1997 7311 0.0 0.0 0.0
1998 7515 0.0 0.0 0.0
1999 8373 0.0 0.0 0.0
2000 8280 0.0 0.0 0.0
2001 8342 0.0 0.0 0.0
2002 8447 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8618 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8688 0.0 0.0 0.0
2008 8663 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8757 0.0 0.0 0.0
2014 8501 0.0 0.0 0.0
2015 8498 0.0 0.0 0.0
2016 8617 0.0 0.0 0.0
2017 8566 0.0 0.0 0.0
2018 8342 0.0 0.0 0.0
2019 8060 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References