X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696113007003

Well Details

Well ID: 0696113007003
Loading map...
Location: 00/07-30-069-11W6/3
Location Alias: 00/07-30-69-11 W6M
Location Alias 2: 00/07-30-069-11 W6/03
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 11
Section: 30
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 7-30-69-11
Operator Name: Cenovus Energy Inc.
License Number: 0073071
License Date: 1978-11-20
License Status: Issued
Spud Date: 1978-12-01
Final Drill Date: 1979-01-23
Well Total Depth: 3355.00 m
Surface Hole Latitude: 55.001270
Surface Hole Longitude: -119.660854

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-20 Obtained License
1978-12-31 Drill Stem Test Performed
1979-01-01 Drill Stem Test Performed
1979-01-23 Finished Drilling
1979-01-23 Well Mode changed to Drilled and Cased
1979-01-27 Production Casing Operation Performed
1979-06-03 Perforation Treatment Performed - Jet Perforation
1979-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-11 Perforation Treatment Performed - Cement Squeeze
1979-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-23 Perforation Treatment Performed - Jet Perforation
1979-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-26 Perforation Treatment Performed - Fractured
1979-10-30 Perforation Treatment Performed - Fractured
1979-11-01 Well Log Performed
1979-11-12 Well Log Performed
1979-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-14 Well Log Performed
1980-03-15 Perforation Treatment Performed - Jet Perforation
1980-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-17 Perforation Treatment Performed - Fractured
1980-03-20 Perforation Treatment Performed - Fractured
1980-03-26 Well Log Performed
1980-03-27 Perforation Treatment Performed - Jet Perforation
1980-03-28 Well Log Performed
1980-03-29 Perforation Treatment Performed - Jet Perforation
1980-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-31 Perforation Treatment Performed - Fractured
1980-03-31 Well Log Performed
1980-04-04 Perforation Treatment Performed - Cement Squeeze
1980-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-08 Perforation Treatment Performed - Jet Perforation
1980-04-11 Perforation Treatment Performed - Fractured
1980-04-16 Perforation Treatment Performed - Fractured
1980-04-16 Well Log Performed
1997-09-08 Perforation Treatment Performed - Jet Perforation
1997-09-08 Well Log Performed
1997-09-11 Perforation Treatment Performed - Fractured
1997-09-30 Well Began Production
1997-09-30 Well Fluid changed to Gas
1997-09-30 Well Mode changed to Flowing
2005-04-01 Well Fluid changed to Gas
2005-04-01 Well Mode changed to Suspended
2005-08-23 Well Log Performed
2005-08-24 Perforation Treatment Performed - Cement Squeeze
2005-08-24 Plug Back Performed
2005-08-24 Well Fluid changed to Gas
2005-08-24 Well Mode changed to Abandoned Zone
2005-08-31 Perforation Treatment Performed - Cement Squeeze
2005-08-31 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-03 Perforation 3278.00 3285.00 6
1979-11-14 Packing Device Capped w/Cement 2946.00 2950.00 0
1980-03-15 Perforation 2489.00 2499.00 6
1980-03-16 Acid Treatment 2489.00 2499.00 0
1980-03-17 Fracture 2489.00 2499.00 0
1980-03-20 Fracture 2489.00 2499.00 0
1980-03-27 Perforation 2489.00 2499.00 6
1980-03-29 Perforation 2111.00 2118.00 12
1980-03-30 Acid Treatment 2111.00 2118.00 0
1980-03-31 Fracture 2111.00 2118.00 0
1980-04-04 Cement Squeeze 2111.00 2118.00 0
1979-06-06 Acid Treatment 3278.00 3285.00 0
1980-04-08 Perforation 2099.00 2102.50 12
1980-04-08 Acid Treatment 2099.00 2102.50 0
1980-04-11 Fracture 2099.00 2102.50 0
1980-04-16 Fracture 2099.00 2102.50 0
1997-09-08 Perforation 1971.00 1981.00 17
1997-09-11 Fracture 1971.00 1981.00 0
2005-08-24 Cement Squeeze 1971.00 1981.00 0
2005-08-31 Cement Squeeze 2099.00 2102.50 0
1979-06-11 Cement Squeeze 3278.00 3285.00 0
1979-06-12 Packing Device Capped w/Cement 3245.00 3250.00 0
1979-10-23 Perforation 2972.00 2979.00 13
1979-10-24 Acid Treatment 2972.00 2979.00 0
1979-10-26 Fracture 2972.00 2979.00 0
1979-10-30 Fracture 2972.00 2979.00 0
1979-11-14 Packing Device Capped w/Cement 2960.00 2960.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 457 0.0 0.0 0.0

For data sources see[5]

References