X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696123110002

Well Details

Well ID: 0696123110002
Loading map...
Location: 00/10-31-069-12W6/2
Location Alias: 00/10-31-69-12 W6M
Location Alias 2: 00/10-31-069-12 W6/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 12
Section: 31
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-31-69-12
Operator Name: Cenovus Energy Inc.
License Number: 0093498
License Date: 1981-11-25
License Status: Suspension
Spud Date: 1981-11-27
Final Drill Date: 1982-01-08
Well Total Depth: 2841.00 m
Surface Hole Latitude: 55.018561
Surface Hole Longitude: -119.817053

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-25 Obtained License
1982-01-08 Finished Drilling
1982-01-09 Well Log Performed
1982-01-13 Production Casing Operation Performed
1982-02-25 Perforation Treatment Performed - Jet Perforation
1982-02-26 Perforation Treatment Performed - Fractured
1982-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-03-06 Perforation Treatment Performed - Jet Perforation
1982-03-08 Perforation Treatment Performed - Fractured
1982-03-24 Perforation Treatment Performed - Jet Perforation
1982-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-04-01 Perforation Treatment Performed - Fractured
1982-04-01 Perforation Treatment Performed - Jet Perforation
1982-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-04-06 Perforation Treatment Performed - Jet Perforation
1982-04-11 Perforation Treatment Performed - Jet Perforation
1982-04-13 Perforation Treatment Performed - Fractured
1982-05-01 Well Mode changed to Drilled and Cased
1985-10-31 Well Log Performed
1985-11-05 Well Log Performed
1985-11-08 Perforation Treatment Performed - Jet Perforation
1985-11-08 Well Log Performed
1985-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-14 Perforation Treatment Performed - Fractured
1986-01-05 Perforation Treatment Performed - Fractured
1986-10-26 Well Began Production
1986-10-26 Well Fluid changed to Gas
1986-10-26 Well Mode changed to Flowing
1987-05-01 Well Fluid changed to Gas
1987-05-01 Well Mode changed to Suspended
1990-06-01 Well Fluid changed to Gas
1990-06-01 Well Mode changed to Flowing
1992-01-21 Perforation Treatment Performed - Cement Squeeze
1992-01-21 Plug Back Performed
1992-01-21 Well Fluid changed to Gas
1992-01-21 Well Mode changed to Abandoned Zone
1996-06-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-25 Perforation 2689.00 2692.00 13
1982-04-01 Fracture 2540.00 2543.50 0
1982-04-05 Packing Device Capped w/Cement 2518.00 2518.00 0
1982-04-06 Perforation 2214.00 2224.00 13
1982-04-11 Perforation 2146.00 2152.00 13
1982-04-13 Fracture 2146.00 2152.00 0
1985-11-08 Perforation 2119.00 2123.00 13
1985-11-10 Acid Treatment 2119.00 2123.00 0
1985-11-14 Fracture 2119.00 2123.00 0
1986-01-05 Fracture 2119.00 2123.00 0
1992-01-21 Cement Squeeze 2146.00 2152.00 0
1982-02-25 Perforation 2699.00 2712.00 13
1992-01-21 Cement Squeeze 2119.00 2123.00 0
1996-06-09 Fracture 2214.00 2224.00 0
1982-02-26 Fracture 2689.00 2712.00 0
1982-03-02 Packing Device Capped w/Cement 2670.00 2670.00 0
1982-03-06 Perforation 2601.00 2622.00 13
1982-03-08 Fracture 2601.00 2622.00 0
1982-03-24 Perforation 2574.00 2590.00 13
1982-03-29 Packing Device Capped w/Cement 2569.00 2569.00 0
1982-04-01 Perforation 2540.00 2543.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 79 0.0 0.0 0.0
1987 1997 0.0 0.0 0.0
1990 1453 0.0 0.0 0.0
1991 1314 0.0 0.0 0.0

For data sources see[5]

References