If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696123206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.021994,"lon":-119.8018,"icon":""}]} |
Location: 00/06-32-069-12W6/2 | |
Location Alias: 00/06-32-69-12 W6M | |
Location Alias 2: 00/06-32-069-12 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 12 | |
Section: 32 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CVE ELM 6-32-69-12 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0411843 | |
License Date: 2009-08-14 | |
License Status: Issued | |
Spud Date: 2009-09-26 | |
Final Drill Date: 2009-10-28 | |
Well Total Depth: 3404.00 m | |
Surface Hole Latitude: 55.021994 | |
Surface Hole Longitude: -119.801800 |
Date | Event |
---|---|
2009-08-14 | Obtained License |
2009-09-30 | Surface Casing Operation Performed |
2009-10-10 | Direction Drilling Operation Performed - Horizontal |
2009-10-15 | Well Log Performed |
2009-10-20 | Intermediate Casing Operation Performed |
2009-10-20 | Well Log Performed |
2009-10-28 | Finished Drilling |
2009-10-28 | Well Log Performed |
2009-10-28 | Well Mode changed to Drilled and Cased |
2009-10-29 | Liner Casing Operation Performed |
2009-10-29 | Perforation Treatment Performed - Open-Hole Completion |
2009-10-30 | Rig Released |
2009-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2009-11-26 | Perforation Treatment Performed - Jet Perforation |
2009-11-26 | Well Log Performed |
2009-12-01 | Perforation Treatment Performed - Fractured |
2009-12-01 | Well Fluid changed to Gas |
2009-12-01 | Well Mode changed to Testing |
2009-12-04 | Well Fluid changed to Gas |
2009-12-04 | Well Mode changed to Test Completed |
2010-02-01 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-10-10 | 2278.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-29 | Open Hole/Barefoot Completion | 3323.00 | 3404.00 | 0 |
2009-11-24 | Multi-Stage Fracture | 3306.90 | 3307.40 | 0 |
2009-11-24 | Multi-Stage Fracture | 3168.40 | 3168.90 | 0 |
2009-11-24 | Multi-Stage Fracture | 2983.80 | 2984.30 | 0 |
2009-11-24 | Multi-Stage Fracture | 2810.60 | 2811.10 | 0 |
2009-11-26 | Perforation | 2217.00 | 2221.00 | 20 |
2009-12-01 | Fracture | 2217.00 | 2221.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 39 | 0.0 | 0.0 | 0.0 |
For data sources see[6]