X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696123207002

Well Details

Well ID: 0696123207002
Loading map...
Location: 00/07-32-069-12W6/2
Location Alias: 00/07-32-69-12 W6M
Location Alias 2: 00/07-32-069-12 W6/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 12
Section: 32
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 7-32-69-12
Operator Name: Cenovus Energy Inc.
License Number: 0072223
License Date: 1978-09-29
License Status: Issued
Spud Date: 1978-11-15
Final Drill Date: 1979-02-26
Well Total Depth: 3496.70 m
Surface Hole Latitude: 55.017325
Surface Hole Longitude: -119.787544

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-29 Obtained License
1978-12-04 Drill Stem Test Performed
1978-12-06 Drill Stem Test Performed
1979-01-03 Drill Stem Test Performed
1979-01-04 Drill Stem Test Performed
1979-02-18 Kick Occurred
1979-02-26 Finished Drilling
1979-03-08 Lost Circulation Occurred
1979-03-18 Production Casing Operation Performed
1979-06-23 Perforation Treatment Performed - Jet Perforation
1979-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-06-28 Well Log Performed
1979-06-29 Perforation Treatment Performed - Jet Perforation
1979-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-09-07 Perforation Treatment Performed - Jet Perforation
1979-10-25 Well Log Performed
1980-03-13 Well Log Performed
1980-03-18 Perforation Treatment Performed - Jet Perforation
1980-03-18 Well Mode changed to Drilled and Cased
1980-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-20 Perforation Treatment Performed - Fractured
1980-03-23 Perforation Treatment Performed - Fractured
1981-09-13 Well Began Production
1981-09-13 Well Fluid changed to Gas
1981-09-13 Well Mode changed to Flowing
1985-02-01 Well Fluid changed to Gas
1985-02-01 Well Mode changed to Suspended
1988-12-28 Well Fluid changed to Gas
1988-12-28 Well Mode changed to Flowing
1994-11-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-23 Perforation 3432.00 3438.00 12
1979-07-15 Packing Device Capped w/Cement 3080.00 3080.00 0
1979-09-07 Perforation 2530.50 2537.50 6
1980-03-18 Perforation 2132.00 2139.50 12
1980-03-19 Acid Treatment 2132.00 2139.50 0
1980-03-20 Fracture 2132.00 2139.50 0
1980-03-23 Fracture 2132.00 2139.50 0
1979-06-24 Acid Treatment 3432.00 3438.00 0
1979-06-28 Packing Device Capped w/Cement 3426.00 3426.00 0
1979-06-28 Packing Device Capped w/Cement 3418.00 3418.00 0
1979-06-29 Perforation 3087.00 3093.00 12
1979-06-30 Acid Treatment 3087.00 3093.00 0
1979-07-02 Acid Treatment 3087.00 3093.00 0
1979-07-08 Acid Treatment 3087.00 3093.00 0
1979-07-15 Packing Device Capped w/Cement 3085.00 3085.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1946 0.0 0.0 0.0
1982 6591 0.0 0.0 0.0
1983 6963 0.0 0.0 0.0
1984 3599 0.0 0.0 0.0
1988 91 0.0 0.0 0.0
1989 2103 0.0 0.0 0.0
1990 1963 0.0 0.0 0.0
1991 336 0.0 0.0 0.0
1992 1046 0.0 0.0 0.0
1993 1292 0.0 0.0 0.0
1994 4402 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-02-18 Kick 3398.00 3398.00
1979-03-08 Lost Circulation 1025.00 1025.00

For data sources see[6]

References