X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706081701020

Well Details

Well ID: 0706081701020
Loading map...
Location: 02/01-17-070-08W6/0
Location Alias: 02/01-17-70-08 W6M
Location Alias 2: 02/01-17-070-08 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 08
Section: 17
County/Municipality: County of Grande Prairie No. 1
Well Name: NUVISTA 102 HZ B ELM 1-17-70-8
Operator Name: NuVista Energy Ltd.
License Number: 0492709
License Date: 2018-12-10
License Status: Issued
Spud Date: 2018-12-17
Final Drill Date: 2019-03-16
Well Total Depth: 4690.00 m
Surface Hole Latitude: 55.069716
Surface Hole Longitude: -119.199897

For data sources see[1][2]

Well History

Date Event
2018-12-10 Obtained License
2018-12-19 Surface Casing Operation Performed
2019-03-08 Direction Drilling Operation Performed - Deviate
2019-03-10 Direction Drilling Operation Performed - Horizontal
2019-03-10 Intermediate Casing Operation Performed
2019-03-10 Well Log Performed
2019-03-16 Finished Drilling
2019-03-16 Well Log Performed
2019-03-16 Well Mode changed to Drilled and Cased
2019-03-17 Liner Casing Operation Performed
2019-03-19 Rig Released
2019-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-29 Perforation Treatment Performed - Fractured
2019-07-29 Perforation Treatment Performed - Jet Perforation
2019-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-30 Perforation Treatment Performed - Fractured
2019-07-30 Perforation Treatment Performed - Jet Perforation
2019-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-31 Perforation Treatment Performed - Fractured
2019-07-31 Perforation Treatment Performed - Jet Perforation
2019-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-01 Perforation Treatment Performed - Fractured
2019-08-01 Perforation Treatment Performed - Jet Perforation
2019-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-02 Perforation Treatment Performed - Fractured
2019-08-02 Perforation Treatment Performed - Jet Perforation
2019-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-03 Perforation Treatment Performed - Fractured
2019-08-03 Perforation Treatment Performed - Jet Perforation
2019-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-04 Perforation Treatment Performed - Fractured
2019-08-04 Perforation Treatment Performed - Jet Perforation
2019-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-05 Perforation Treatment Performed - Fractured
2019-08-05 Perforation Treatment Performed - Jet Perforation
2019-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-06 Perforation Treatment Performed - Fractured
2019-08-06 Perforation Treatment Performed - Jet Perforation
2019-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-07 Perforation Treatment Performed - Fractured
2019-08-07 Perforation Treatment Performed - Jet Perforation
2019-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-12 Perforation Treatment Performed - Fractured
2019-08-12 Perforation Treatment Performed - Jet Perforation
2019-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-13 Perforation Treatment Performed - Fractured
2019-08-13 Perforation Treatment Performed - Jet Perforation
2019-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-16 Perforation Treatment Performed - Fractured
2019-08-16 Perforation Treatment Performed - Jet Perforation
2019-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-17 Perforation Treatment Performed - Fractured
2019-08-17 Perforation Treatment Performed - Jet Perforation
2019-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-18 Perforation Treatment Performed - Fractured
2019-08-18 Perforation Treatment Performed - Jet Perforation
2019-09-22 Well Began Production
2019-09-22 Well Fluid changed to Gas
2019-09-22 Well Mode changed to Flowing
2019-10-18 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-03 Nabors Drilling Canada Limited 79 N/A Resumption
2019-03-03 Nabors Drilling Canada Limited 79 N/A Resumption
2018-12-17 Precision Drilling Corporation 182 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-08 2309.70 Deviate (5 - 79 degrees)
2019-03-10 2686.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-29 Multi-Stage Fracture 4638.60 4656.60 0
2019-07-30 Perforation 4509.90 4510.20 4
2019-08-07 Perforation 3549.60 3549.90 4
2019-08-07 Perforation 3534.90 3535.20 4
2019-08-07 Perforation 3519.90 3520.20 4
2019-08-07 Perforation 3504.90 3505.20 4
2019-08-07 Perforation 3489.90 3490.20 4
2019-08-07 Acid Treatment 3489.90 3549.90 0
2019-08-07 Fracture 3489.90 3549.90 0
2019-08-12 Perforation 3474.60 3474.90 4
2019-08-12 Perforation 3459.90 3460.20 4
2019-08-12 Perforation 3444.90 3445.20 4
2019-07-30 Perforation 4494.90 4495.20 4
2019-08-12 Perforation 3429.90 3430.20 4
2019-08-12 Perforation 3414.90 3415.20 4
2019-08-12 Acid Treatment 3414.90 3474.90 0
2019-08-12 Fracture 3414.90 3474.90 0
2019-08-13 Perforation 3399.60 3399.90 4
2019-08-13 Perforation 3384.90 3385.20 4
2019-08-13 Perforation 3369.90 3370.20 4
2019-08-13 Perforation 3354.90 3355.20 4
2019-08-13 Perforation 3339.90 3340.20 4
2019-08-13 Acid Treatment 3339.90 3399.90 0
2019-07-30 Perforation 4479.90 4480.20 4
2019-08-13 Fracture 3339.90 3399.90 0
2019-08-16 Perforation 3324.60 3324.90 4
2019-08-16 Perforation 3309.90 3310.20 4
2019-08-16 Perforation 3294.90 3295.20 4
2019-08-16 Perforation 3279.90 3280.20 4
2019-08-16 Perforation 3264.90 3265.20 4
2019-08-16 Acid Treatment 3264.90 3324.90 0
2019-08-16 Fracture 3264.90 3324.90 0
2019-08-17 Perforation 3249.60 3249.90 4
2019-08-17 Perforation 3234.90 3235.20 4
2019-07-30 Perforation 4464.90 4465.20 4
2019-08-17 Perforation 3219.90 3220.20 4
2019-08-17 Perforation 3204.90 3205.20 4
2019-08-17 Perforation 3189.90 3190.20 4
2019-08-17 Acid Treatment 3189.90 3249.90 0
2019-08-17 Fracture 3189.90 3249.90 0
2019-08-17 Perforation 3174.60 3174.90 4
2019-08-17 Perforation 3159.90 3160.20 4
2019-08-17 Perforation 3144.90 3145.20 4
2019-08-17 Perforation 3129.90 3130.20 4
2019-08-17 Perforation 3114.90 3115.20 4
2019-07-30 Acid Treatment 4464.90 4524.30 0
2019-08-17 Acid Treatment 3114.90 3174.90 0
2019-08-17 Fracture 3114.90 3174.90 0
2019-08-18 Perforation 3098.60 3098.90 4
2019-08-18 Perforation 3084.90 3085.20 4
2019-08-18 Perforation 3069.90 3070.20 4
2019-08-18 Perforation 3054.90 3055.20 4
2019-08-18 Perforation 3039.90 3040.20 4
2019-08-18 Acid Treatment 3039.90 3098.90 0
2019-08-18 Fracture 3039.90 3098.90 0
2019-07-30 Fracture 4464.90 4524.30 0
2019-07-30 Perforation 4449.60 4449.90 4
2019-07-30 Perforation 4434.90 4435.20 4
2019-07-30 Perforation 4419.90 4420.20 4
2019-07-30 Perforation 4404.90 4405.20 4
2019-07-29 Perforation 4599.60 4599.90 4
2019-07-30 Perforation 4389.90 4390.20 4
2019-07-30 Acid Treatment 4389.90 4449.90 0
2019-07-30 Fracture 4389.90 4449.90 0
2019-07-31 Perforation 4374.60 4374.90 4
2019-07-31 Perforation 4359.90 4360.20 4
2019-07-31 Perforation 4344.90 4345.20 4
2019-07-31 Perforation 4329.90 4330.20 4
2019-07-31 Perforation 4314.90 4315.20 4
2019-07-31 Acid Treatment 4314.90 4374.90 0
2019-07-31 Fracture 4314.90 4374.90 0
2019-07-29 Perforation 4584.90 4585.20 4
2019-08-01 Perforation 4299.60 4299.90 4
2019-08-01 Perforation 4284.90 4285.20 4
2019-08-01 Perforation 4269.90 4270.20 4
2019-08-01 Perforation 4254.90 4255.20 4
2019-08-01 Perforation 4239.90 4240.20 4
2019-08-01 Acid Treatment 4239.90 4299.90 0
2019-08-01 Fracture 4239.90 4299.90 0
2019-08-02 Perforation 4224.60 4224.90 4
2019-08-02 Perforation 4209.90 4210.20 4
2019-08-02 Perforation 4194.90 4195.20 4
2019-07-29 Perforation 4569.90 4570.20 4
2019-08-02 Perforation 4179.90 4180.20 4
2019-08-02 Perforation 4164.90 4165.20 4
2019-08-02 Acid Treatment 4164.90 4224.90 0
2019-08-02 Fracture 4164.90 4224.90 0
2019-08-03 Perforation 4146.00 4146.30 4
2019-08-03 Perforation 4134.90 4135.20 4
2019-08-03 Perforation 4119.90 4120.20 4
2019-08-03 Perforation 4104.90 4105.20 4
2019-08-03 Perforation 4089.90 4090.20 4
2019-08-03 Acid Treatment 4089.90 4146.30 0
2019-07-29 Perforation 4554.90 4555.20 4
2019-08-03 Fracture 4089.90 4146.30 0
2019-08-03 Perforation 4074.60 4074.90 4
2019-08-03 Perforation 4060.90 4061.20 4
2019-08-03 Perforation 4044.90 4045.20 4
2019-08-03 Perforation 4029.90 4030.20 4
2019-08-03 Perforation 4014.90 4015.20 4
2019-08-03 Acid Treatment 4014.90 4074.90 0
2019-08-03 Fracture 4014.90 4074.90 0
2019-08-04 Perforation 3999.60 3999.90 4
2019-08-04 Perforation 3984.90 3985.20 4
2019-07-29 Perforation 4539.90 4540.20 4
2019-08-04 Perforation 3969.90 3970.20 4
2019-08-04 Perforation 3954.90 3955.20 4
2019-08-04 Perforation 3939.90 3940.20 4
2019-08-04 Acid Treatment 3939.90 3999.90 0
2019-08-04 Fracture 3939.90 3999.90 0
2019-08-04 Perforation 3924.60 3924.90 4
2019-08-04 Perforation 3909.90 3910.20 4
2019-08-04 Perforation 3894.90 3895.20 4
2019-08-04 Perforation 3879.90 3880.20 4
2019-08-04 Perforation 3864.90 3865.20 4
2019-07-29 Acid Treatment 4539.90 4599.90 0
2019-08-04 Acid Treatment 3864.90 3924.90 0
2019-08-04 Fracture 3864.90 3924.90 0
2019-08-05 Perforation 3849.60 3849.90 4
2019-08-05 Perforation 3834.90 3835.20 4
2019-08-05 Perforation 3819.90 3820.20 4
2019-08-05 Perforation 3804.90 3805.20 4
2019-08-05 Perforation 3789.90 3790.20 4
2019-08-05 Acid Treatment 3789.90 3849.90 0
2019-08-05 Fracture 3789.90 3849.90 0
2019-08-06 Perforation 3774.60 3774.90 4
2019-07-29 Fracture 4539.90 4599.90 0
2019-08-06 Perforation 3759.90 3760.20 4
2019-08-06 Perforation 3744.90 3745.20 4
2019-08-06 Perforation 3729.90 3730.20 4
2019-08-06 Perforation 3714.90 3715.20 4
2019-08-06 Acid Treatment 3714.90 3774.90 0
2019-08-06 Fracture 3714.90 3774.90 0
2019-08-06 Perforation 3699.60 3699.90 4
2019-08-06 Perforation 3684.90 3685.20 4
2019-08-06 Perforation 3669.90 3670.20 4
2019-08-06 Perforation 3654.90 3655.20 4
2019-07-30 Perforation 4524.00 4524.30 4
2019-08-06 Perforation 3639.90 3640.20 4
2019-08-06 Acid Treatment 3639.90 3699.90 0
2019-08-06 Fracture 3639.90 3699.90 0
2019-08-07 Perforation 3624.60 3624.90 4
2019-08-07 Perforation 3609.90 3610.20 4
2019-08-07 Perforation 3594.90 3595.20 4
2019-08-07 Perforation 3579.90 3580.20 4
2019-08-07 Perforation 3564.90 3565.20 4
2019-08-07 Acid Treatment 3594.90 3624.90 0
2019-08-07 Fracture 3564.90 3624.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-29 2019-08-18 2,566 15,167 N/A
2 2019-07-29 2019-08-17 2,566 0 N/A
3 2019-08-13 2019-08-18 2,566 0 N/A
4 2019-07-29 2019-08-12 2,566 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.2203 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 14.9696 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.4199 N/A
HCR-7000 (Synthetic HCL Acid) Fluid Energy Group Ltd. Acid Demulsifiers Not Available 100 0.3281 N/A
Inhibitors Not Available 100 0.3282 N/A
Non Hazardous Ingredients Not Available 100 0.3282 N/A
Water 7732-18-5 100 0.3282 N/A
2 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0006 N/A
Cured Acrylic Resin Not Available 100 0.0006 N/A
Non-Hazardous Ingredients Not Available 100 0.0006 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0078 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0078 N/A
3 SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Anionic Acrylamide 5/8/9003 100 0.1226 N/A
Mineral Oil 8012-95-1 100 0.1226 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.1226 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.1226 N/A
Sodium Acrylate 7446-81-3 100 0.1226 N/A
Water 7732-18-5 100 0.1226 N/A
4 SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0334 N/A
Sodium Chloride 7647-14-5 100 0.0334 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-04 2019-08-17 Surface Water - River 15168

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1872 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-19 No Incident Encountered 0.00 0.00
2019-08-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References