If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0706082212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.067904,"lon":-119.103662,"icon":""}]} |
Location: 00/12-22-070-08W6/0 | |
Location Alias: 00/12-22-70-08 W6M | |
Location Alias 2: 00/12-22-070-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 6 | |
Range: 08 | |
Section: 22 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: PIPESTONE HZ ELM 12-22-70-8 | |
Operator Name: Pipestone Energy Corp. | |
License Number: 0488083 | |
License Date: 2018-02-12 | |
License Status: Issued | |
Spud Date: 2018-02-21 | |
Final Drill Date: 2018-05-10 | |
Well Total Depth: 5283.00 m | |
Surface Hole Latitude: 55.067904 | |
Surface Hole Longitude: -119.103662 |
Date | Event |
---|---|
2018-02-12 | Obtained License |
2018-02-23 | Surface Casing Operation Performed |
2018-04-26 | Direction Drilling Operation Performed - Deviate |
2018-04-30 | Direction Drilling Operation Performed - Horizontal |
2018-05-01 | Well Log Performed |
2018-05-10 | Finished Drilling |
2018-05-10 | Well Log Performed |
2018-05-10 | Well Mode changed to Drilled and Cased |
2018-05-12 | Production Casing Operation Performed |
2018-05-13 | Rig Released |
2018-10-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-11-20 | Well Fluid changed to Gas |
2018-11-20 | Well Mode changed to Testing |
2019-01-31 | Well Fluid changed to Gas |
2019-01-31 | Well Mode changed to Test Completed |
2019-09-14 | Well Began Production |
2019-09-14 | Well Fluid changed to Gas |
2019-09-14 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-22 | Citadel Drilling Ltd. | 3 | N/A | Set Surface |
2018-04-26 | Citadel Drilling Ltd. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-04-26 | 1149.90 | Deviate (5 - 79 degrees) |
2018-04-30 | 2567.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-01 | Multi-Stage Fracture | 5256.30 | 5259.60 | 0 |
2018-10-16 | Multi-Stage Fracture | 4454.30 | 4529.90 | 0 |
2018-10-16 | Multi-Stage Fracture | 4366.10 | 4442.00 | 0 |
2018-10-16 | Multi-Stage Fracture | 4277.80 | 4353.80 | 0 |
2018-10-17 | Multi-Stage Fracture | 4189.60 | 4265.50 | 0 |
2018-10-17 | Multi-Stage Fracture | 4102.00 | 4177.30 | 0 |
2018-10-18 | Multi-Stage Fracture | 4014.30 | 4089.70 | 0 |
2018-10-18 | Multi-Stage Fracture | 3926.20 | 4002.00 | 0 |
2018-10-18 | Multi-Stage Fracture | 3837.90 | 3913.90 | 0 |
2018-10-19 | Multi-Stage Fracture | 3750.20 | 3825.90 | 0 |
2018-10-19 | Multi-Stage Fracture | 3662.00 | 3737.90 | 0 |
2018-10-13 | Multi-Stage Fracture | 5158.50 | 5234.50 | 0 |
2018-10-19 | Multi-Stage Fracture | 3573.70 | 3649.70 | 0 |
2018-10-19 | Multi-Stage Fracture | 3485.50 | 3561.40 | 0 |
2018-10-19 | Multi-Stage Fracture | 3397.40 | 3473.20 | 0 |
2018-10-20 | Multi-Stage Fracture | 3309.60 | 3385.20 | 0 |
2018-10-20 | Multi-Stage Fracture | 3222.30 | 3297.50 | 0 |
2018-10-20 | Multi-Stage Fracture | 3134.50 | 3210.20 | 0 |
2018-10-20 | Multi-Stage Fracture | 3046.50 | 3122.30 | 0 |
2018-10-20 | Multi-Stage Fracture | 2958.40 | 3034.20 | 0 |
2018-10-20 | Multi-Stage Fracture | 2857.50 | 2946.10 | 0 |
2018-10-21 | Multi-Stage Fracture | 2756.60 | 2845.10 | 0 |
2018-10-13 | Multi-Stage Fracture | 5070.30 | 5146.20 | 0 |
2018-10-21 | Multi-Stage Fracture | 2655.70 | 2744.30 | 0 |
2018-10-21 | Multi-Stage Fracture | 2554.80 | 2643.40 | 0 |
2018-10-14 | Multi-Stage Fracture | 4982.00 | 5057.90 | 0 |
2018-10-14 | Multi-Stage Fracture | 4893.70 | 4969.70 | 0 |
2018-10-14 | Multi-Stage Fracture | 4805.60 | 4881.40 | 0 |
2018-10-15 | Multi-Stage Fracture | 4718.20 | 4793.30 | 0 |
2018-10-15 | Multi-Stage Fracture | 4630.00 | 4705.90 | 0 |
2018-10-15 | Multi-Stage Fracture | 4542.20 | 4617.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-01 | 2018-10-21 | 2,467 | 25,241 | N/A |
2 | 2018-10-13 | 2018-10-21 | 2,467 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 77.9551 | N/A | |||
15% HCL Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.7106 | N/A | |
Water | 7732-18-5 | 100 | 0.7106 | N/A | ||||
SAB-1 Acid Blend Additive Package | Step Energy Services | Acid | Acetic Acid | 64-19-7 | 100 | 0.0078 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0078 | N/A | ||||
Methyl Alcohol | 67-56-1 | 100 | 0.0078 | N/A | ||||
Non Hazardous Ingredients | Not Available | 100 | 0.0078 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.0078 | N/A | ||||
SABB-1 (Acid Corrosion Inhibitor) | Step Energy Services | Acid | 2-Propanol | 67-63-0 | 100 | 0.0014 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0014 | N/A | ||||
Methyl Alcohol | 67-56-1 | 100 | 0.0014 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0014 | N/A | ||||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0076 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0076 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0076 | N/A | ||||
SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0047 | N/A | |
Cured Acrylic Resin | Not Available | 100 | 0.0047 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0047 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.061 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.061 | N/A | ||||
SNE-3 (Non-Emulsifier) | Step Energy Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0779 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0779 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0779 | N/A | ||||
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl ammonium dichloride |
68607-28-3 | 100 | 0.0779 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.1831 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1831 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.1831 | N/A | ||||
2 | 30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 21.69 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-10-01 | 2018-12-09 | Surface Water - River | 25241 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 77 | 0.0 | 0.0 | 0.0 |
2019 | 2231 | 0.0 | 0.0 | 0.0 |
2020 | 1746 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-05-13 | No Incident Encountered | 0.00 | 0.00 |
2018-12-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]