X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706082213020

Well Details

Well ID: 0706082213020
Loading map...
Location: 02/13-22-070-08W6/0
Location Alias: 02/13-22-70-08 W6M
Location Alias 2: 02/13-22-070-08 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 08
Section: 22
County/Municipality: County of Grande Prairie No. 1
Well Name: PIPESTONE 102 HZ ELM 13-22-70-8
Operator Name: Pipestone Energy Corp.
License Number: 0488084
License Date: 2018-02-12
License Status: Issued
Spud Date: 2018-02-25
Final Drill Date: 2018-04-05
Well Total Depth: 5100.00 m
Surface Hole Latitude: 55.067904
Surface Hole Longitude: -119.103349

For data sources see[1][2]

Well History

Date Event
2018-02-12 Obtained License
2018-02-27 Surface Casing Operation Performed
2018-03-24 Direction Drilling Operation Performed - Deviate
2018-03-26 Direction Drilling Operation Performed - Horizontal
2018-03-27 Well Log Performed
2018-04-05 Finished Drilling
2018-04-05 Well Mode changed to Drilled and Cased
2018-04-06 Well Log Performed
2018-04-07 Production Casing Operation Performed
2018-04-08 Rig Released
2018-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-18 Well Fluid changed to Gas
2018-11-18 Well Mode changed to Testing
2018-11-22 Well Log Performed
2018-11-23 Well Log Performed
2019-01-31 Well Fluid changed to Gas
2019-01-31 Well Mode changed to Test Completed
2019-09-11 Well Began Production
2019-09-11 Well Fluid changed to Gas
2019-09-11 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-03-21 Citadel Drilling Ltd. 3 N/A Resumption
2018-02-25 Citadel Drilling Ltd. 3 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-24 2172.20 Deviate (5 - 79 degrees)
2018-03-26 2561.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-01 Multi-Stage Fracture 5085.10 5088.50 0
2018-10-06 Multi-Stage Fracture 4283.30 4358.60 0
2018-10-07 Multi-Stage Fracture 4195.10 4271.00 0
2018-10-07 Multi-Stage Fracture 4106.90 4182.80 0
2018-10-07 Multi-Stage Fracture 4018.70 4094.60 0
2018-10-08 Multi-Stage Fracture 3930.80 4006.40 0
2018-10-08 Multi-Stage Fracture 3842.90 3918.50 0
2018-10-08 Multi-Stage Fracture 3754.80 3830.70 0
2018-10-09 Multi-Stage Fracture 3666.50 3742.50 0
2018-10-09 Multi-Stage Fracture 3578.10 3654.20 0
2018-10-09 Multi-Stage Fracture 3490.00 3565.80 0
2018-10-03 Multi-Stage Fracture 4987.50 5063.40 0
2018-10-10 Multi-Stage Fracture 3401.70 3477.60 0
2018-10-10 Multi-Stage Fracture 3313.30 3389.40 0
2018-10-10 Multi-Stage Fracture 3225.00 3301.00 0
2018-10-10 Multi-Stage Fracture 3136.70 3212.70 0
2018-10-11 Multi-Stage Fracture 3048.30 3124.40 0
2018-10-11 Multi-Stage Fracture 2960.00 3036.00 0
2018-10-12 Multi-Stage Fracture 2871.60 2947.60 0
2018-10-12 Multi-Stage Fracture 2783.30 2859.30 0
2018-10-12 Multi-Stage Fracture 2694.90 2770.90 0
2018-10-12 Multi-Stage Fracture 2619.20 2682.60 0
2018-10-03 Multi-Stage Fracture 4899.10 4975.20 0
2018-10-13 Multi-Stage Fracture 2543.50 2606.80 0
2018-10-04 Multi-Stage Fracture 4810.80 4886.80 0
2018-10-04 Multi-Stage Fracture 4722.50 4789.50 0
2018-10-05 Multi-Stage Fracture 4634.40 4710.30 0
2018-10-05 Multi-Stage Fracture 4546.10 4622.10 0
2018-10-06 Multi-Stage Fracture 4457.80 4533.80 0
2018-10-06 Multi-Stage Fracture 4370.90 4445.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-01 2018-10-13 2,450 21,610 N/A
2 2018-10-03 2018-10-13 2,450 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 76.8856 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.6259 N/A
Water 7732-18-5 100 0.6259 N/A
SAB-1 Acid Blend Additive Package Step Energy Services Acid Acetic Acid 64-19-7 100 0.0068 N/A
Ethylene Glycol 107-21-1 100 0.0068 N/A
Methyl Alcohol 67-56-1 100 0.0068 N/A
Non Hazardous Ingredients Not Available 100 0.0068 N/A
Propan-2-ol 67-63-0 100 0.0068 N/A
SABB-1 (Acid Corrosion Inhibitor) Step Energy Services Acid 2-Propanol 67-63-0 100 0.0012 N/A
Ethylene Glycol 107-21-1 100 0.0012 N/A
Methyl Alcohol 67-56-1 100 0.0012 N/A
Non-Hazardous Ingredients Not Available 100 0.0012 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0078 N/A
Methyl Alcohol 67-56-1 100 0.0078 N/A
Non-Hazardous Ingredients Not Available 100 0.0078 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0603 N/A
Non-Hazardous Ingredients Not Available 100 0.0603 N/A
SNE-3 (Non-Emulsifier) Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.078 N/A
Methyl Alcohol 67-56-1 100 0.078 N/A
Non-Hazardous Ingredients Not Available 100 0.078 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.078 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.1906 N/A
Non-Hazardous Ingredients Not Available 100 0.1906 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.1906 N/A
2 30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 22.9018 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0049 N/A
Cured Acrylic Resin Not Available 100 0.0049 N/A
Non-Hazardous Ingredients Not Available 100 0.0049 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-01 2018-11-20 Surface Water - Runoff 21610

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 63 0.0 0.0 0.0
2019 2135 0.0 0.0 0.0
2020 1737 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-08 No Incident Encountered 0.00 0.00
2018-11-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References