X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706090810000

Well Details

Well ID: 0706090810000
Loading map...
Location: 00/10-08-070-09W6/0
Location Alias: 00/10-08-70-09 W6M
Location Alias 2: 00/10-08-070-09 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 09
Section: 08
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-8-70-9
Operator Name: Cenovus Energy Inc.
License Number: 0072496
License Date: 1978-10-18
License Status: Abandoned
Spud Date: 1978-10-23
Final Drill Date: 1979-01-06
Well Total Depth: 2905.00 m
Surface Hole Latitude: 55.049801
Surface Hole Longitude: -119.330927

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-10-18 Obtained License
1978-10-23 Lost Circulation Occurred
1978-11-02 Drill Stem Test Performed
1978-11-03 Water Flow Occurred
1978-11-04 Drill Stem Test Performed
1978-11-05 Drill Stem Test Performed
1978-11-16 Drill Stem Test Performed
1978-11-26 Drill Stem Test Performed
1978-12-05 Drill Stem Test Performed
1979-01-06 Finished Drilling
1979-01-10 Production Casing Operation Performed
1979-09-06 Well Mode changed to Drilled and Cased
1979-10-18 Perforation Treatment Performed - Jet Perforation
1979-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-21 Perforation Treatment Performed - Fractured
1979-10-24 Perforation Treatment Performed - Fractured
1980-03-21 Well Log Performed
1980-03-22 Perforation Treatment Performed - Jet Perforation
1980-03-22 Well Mode changed to Drilled and Cased
1980-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-24 Perforation Treatment Performed - Fractured
1980-03-24 Well Log Performed
1980-03-26 Well Log Performed
1980-03-27 Perforation Treatment Performed - Jet Perforation
1980-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-29 Perforation Treatment Performed - Fractured
1980-03-29 Well Log Performed
1980-04-04 Perforation Treatment Performed - Cement Squeeze
1999-09-19 Well Began Production
1999-09-19 Well Fluid changed to Gas
1999-09-19 Well Mode changed to Flowing
1999-10-12 Well Log Performed
1999-10-13 Perforation Treatment Performed - Jet Perforation
1999-10-13 Well Log Performed
1999-10-15 Perforation Treatment Performed - Remedial Casing
1999-10-15 Well Log Performed
2005-04-01 Well Fluid changed to Gas
2005-04-01 Well Mode changed to Suspended
2011-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-06 Plug Back Performed
2011-06-06 Well Fluid changed to Gas
2011-06-06 Well Log Performed
2011-06-06 Well Mode changed to Abandoned Zone
2011-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-07 Well Log Performed
2011-06-08 Perforation Treatment Performed - Jet Perforation
2011-06-09 Perforation Treatment Performed - Remedial Casing
2011-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-10 Perforation Treatment Performed - Jet Perforation
2011-06-10 Well Log Performed
2011-07-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-18 Perforation 2052.00 2061.00 6
1980-03-29 Fracture 1687.00 1699.00 0
1980-04-04 Cement Squeeze 1687.00 1699.00 0
1999-10-13 Perforation 2803.50 2804.50 13
1999-10-15 Remedial Casing Cementing 2803.50 2804.50 0
2011-06-06 Packing Device Capped w/Cement 2034.00 2042.00 0
2011-06-06 Packing Device Capped w/Cement 1800.00 1808.00 0
2011-06-07 Packing Device Capped w/Cement 1669.00 1677.00 0
2011-06-08 Perforation 606.00 607.00 13
2011-06-09 Remedial Casing Cementing 606.00 607.00 0
2011-06-10 Perforation 460.00 461.00 13
1979-10-19 Acid Treatment 2052.00 2061.00 0
2011-06-10 Packing Device Capped w/Cement 444.00 452.00 0
2011-06-10 Perforation 426.00 427.00 13
2011-06-10 Packing Device Capped w/Cement 408.00 418.00 0
1979-10-21 Fracture 2052.00 2061.00 0
1979-10-24 Fracture 2052.00 2061.00 0
1980-03-22 Perforation 1819.00 1826.00 12
1980-03-23 Acid Treatment 1819.00 1826.00 0
1980-03-24 Fracture 1819.00 1826.00 0
1980-03-27 Perforation 1687.00 1699.00 6
1980-03-28 Acid Treatment 1687.00 1699.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 169 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-10-23 Lost Circulation 34.30 34.30
1978-11-03 Water Flow 1260.00 0.00

For data sources see[6]

References