X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706091011000

Well Details

Well ID: 0706091011000
Loading map...
Location: 00/11-10-070-09W6/0
Location Alias: 00/11-10-70-09 W6M
Location Alias 2: 00/11-10-070-09 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 09
Section: 10
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 11-10-70-9
Operator Name: Cenovus Energy Inc.
License Number: 0067441
License Date: 1977-12-14
License Status: Abandoned
Spud Date: 1977-12-22
Final Drill Date: 1978-02-09
Well Total Depth: 2529.80 m
Surface Hole Latitude: 55.049192
Surface Hole Longitude: -119.288523

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-14 Obtained License
1978-01-23 Drill Stem Test Performed
1978-02-05 Kick Occurred
1978-02-09 Finished Drilling
1978-02-16 Production Casing Operation Performed
1978-02-17 Well Mode changed to Drilled and Cased
1978-08-16 Perforation Treatment Performed - Jet Perforation
1978-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-19 Perforation Treatment Performed - Fractured
1978-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-23 Perforation Treatment Performed - Jet Perforation
1978-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-25 Perforation Treatment Performed - Fractured
1978-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-28 Perforation Treatment Performed - Jet Perforation
1978-08-29 Perforation Treatment Performed - Cement Squeeze
1978-09-01 Perforation Treatment Performed - Cement Squeeze
1978-09-01 Perforation Treatment Performed - Jet Perforation
1978-09-06 Perforation Treatment Performed - Jet Perforation
1978-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-12 Perforation Treatment Performed - Fractured
1978-09-16 Perforation Treatment Performed - Jet Perforation
1978-09-19 Perforation Treatment Performed - Fractured
1978-09-23 Perforation Treatment Performed - Jet Perforation
1978-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-29 Perforation Treatment Performed - Jet Perforation
1978-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-02 Perforation Treatment Performed - Fractured
1983-01-14 Perforation Treatment Performed - Jet Perforation
1983-01-15 Perforation Treatment Performed - Jet Perforation
1983-02-01 Well Began Production
1983-02-01 Well Fluid changed to Gas
1983-02-01 Well Mode changed to Flowing
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Suspended
2014-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-14 Plug Back Performed
2014-11-14 Well Fluid changed to Gas
2014-11-14 Well Mode changed to Abandoned Zone
2014-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-17 Perforation Treatment Performed - Jet Perforation
2014-11-17 Plug Back Performed
2014-11-18 Perforation Treatment Performed - Remedial Casing
2014-11-19 Perforation Treatment Performed - Jet Perforation
2014-11-20 Perforation Treatment Performed - Remedial Casing
2015-07-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-16 Perforation 2243.30 2248.20 3
1978-08-28 Perforation 1778.20 1778.80 6
1978-08-29 Cement Squeeze 1778.20 1778.80 0
1978-09-01 Perforation 1798.30 1798.90 6
1978-09-01 Cement Squeeze 1798.30 1798.90 0
1978-09-06 Perforation 1783.10 1789.20 3
1978-09-07 Acid Treatment 1783.10 1789.20 0
1978-09-12 Fracture 1783.10 1789.20 0
1978-09-16 Perforation 1789.20 1794.00 3
1978-09-19 Fracture 1783.10 1794.00 0
1978-09-23 Perforation 1764.80 1770.60 3
1978-08-17 Acid Treatment 2243.30 2248.20 0
1978-09-24 Acid Treatment 1764.80 1770.60 0
1978-09-29 Perforation 1653.80 1656.90 7
1978-09-30 Acid Treatment 1653.80 1656.90 0
1978-10-02 Fracture 1653.80 1656.90 0
1983-01-14 Perforation 1787.30 1793.30 13
1983-01-15 Perforation 1765.00 1770.00 13
2014-11-14 Packing Device Capped w/Cement 1740.00 1749.00 0
2014-11-17 Packing Device Capped w/Cement 1637.00 1645.00 0
2014-11-17 Perforation 781.00 783.00 17
2014-11-18 Remedial Casing Cementing 781.00 783.00 0
1978-08-19 Fracture 2243.30 2248.20 0
2014-11-19 Perforation 580.00 581.00 17
2014-11-20 Remedial Casing Cementing 580.00 581.00 0
1978-08-23 Packing Device Capped w/Cement 2240.30 2240.30 0
1978-08-23 Perforation 2020.80 2028.10 3
1978-08-24 Acid Treatment 2020.80 2028.10 0
1978-08-25 Fracture 2020.80 2028.10 0
1978-08-27 Packing Device Capped w/Cement 2017.80 2017.80 0
1978-08-27 Packing Device Capped w/Cement 1900.00 1900.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4324 0.0 0.0 0.0
1984 2857 0.0 0.0 0.0
1985 2849 0.0 0.0 0.0
1987 1445 0.0 0.0 0.0
1988 7840 0.0 0.0 0.0
1989 4274 0.0 0.0 0.0
1990 4702 0.0 0.0 0.0
1991 6637 0.0 0.0 0.0
1992 6655 0.0 0.0 0.0
1993 2889 0.0 0.0 0.0
1994 4715 0.0 0.0 0.0
1995 2360 0.0 0.0 0.0
1996 4177 0.0 0.0 0.0
1997 5226 0.0 0.0 0.0
1998 4386 0.0 0.0 0.0
1999 8575 0.0 0.0 0.0
2000 6675 0.0 0.0 0.0
2001 6646 0.0 0.0 0.0
2002 8109 0.0 0.0 0.0
2003 7661 0.0 0.0 0.0
2004 3972 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-02-05 Kick 2495.00 2495.00
2014-11-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References