X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706101810000

Well Details

Well ID: 0706101810000
Loading map...
Location: 00/10-18-070-10W6/0
Location Alias: 00/10-18-70-10 W6M
Location Alias 2: 00/10-18-070-10 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 10
Section: 18
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-18-70-10
Operator Name: Cenovus Energy Inc.
License Number: 0071927
License Date: 1978-09-14
License Status: Issued
Spud Date: 1978-09-26
Final Drill Date: 1978-11-15
Well Total Depth: 3049.00 m
Surface Hole Latitude: 55.062059
Surface Hole Longitude: -119.511876

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-14 Obtained License
1978-10-12 Drill Stem Test Performed
1978-10-17 Drill Stem Test Performed
1978-10-31 Drill Stem Test Performed
1978-11-03 Drill Stem Test Performed
1978-11-15 Finished Drilling
1978-11-20 Production Casing Operation Performed
1979-06-13 Well Mode changed to Drilled and Cased
1979-09-05 Perforation Treatment Performed - Jet Perforation
1979-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-08 Perforation Treatment Performed - Fractured
1979-09-11 Perforation Treatment Performed - Fractured
1979-10-01 Well Fluid changed to Gas
1979-10-01 Well Mode changed to Testing
1979-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-17 Perforation Treatment Performed - Jet Perforation
1979-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-20 Perforation Treatment Performed - Fractured
1979-11-21 Well Log Performed
1979-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-23 Perforation Treatment Performed - Cement Squeeze
1980-04-08 Well Log Performed
1980-04-10 Perforation Treatment Performed - Jet Perforation
1980-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-12 Perforation Treatment Performed - Fractured
1980-04-12 Well Log Performed
1980-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-14 Perforation Treatment Performed - Jet Perforation
1980-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-16 Perforation Treatment Performed - Fractured
1980-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-20 Perforation Treatment Performed - Jet Perforation
1980-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-22 Perforation Treatment Performed - Fractured
1980-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-11 Well Log Performed
2002-10-23 Perforation Treatment Performed - Jet Perforation
2002-10-24 Perforation Treatment Performed - Jet Perforation
2002-10-25 Perforation Treatment Performed - Cement Squeeze
2002-10-29 Perforation Treatment Performed - Jet Perforation
2002-10-29 Well Log Performed
2002-11-01 Perforation Treatment Performed - Fractured
2002-11-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-05 Perforation 2694.00 2704.00 12
1979-11-23 Packing Device Capped w/Cement 2632.00 2635.00 0
1980-04-10 Perforation 1898.00 1903.00 12
1980-04-11 Acid Treatment 1898.00 1903.00 0
1980-04-12 Fracture 1898.00 1903.00 0
1980-04-14 Packing Device Capped w/Cement 1890.00 1890.00 0
1980-04-14 Perforation 1871.00 1876.00 12
1980-04-15 Acid Treatment 1871.00 1876.00 0
1980-04-16 Fracture 1871.00 1876.00 0
1980-04-20 Packing Device Capped w/Cement 1865.00 1865.00 0
1980-04-20 Perforation 1771.00 1778.00 12
1979-09-06 Acid Treatment 2694.00 2704.00 0
1980-04-21 Acid Treatment 1771.00 1778.00 0
1980-04-22 Fracture 1771.00 1778.00 0
1980-04-27 Packing Device Capped w/Cement 1765.00 1765.00 0
2002-10-23 Perforation 1771.00 1778.00 12
2002-10-23 Perforation 1871.00 1876.00 12
2002-10-24 Perforation 1898.00 1903.00 12
2002-10-25 Cement Squeeze 1771.00 1876.00 0
2002-10-29 Perforation 1976.00 1981.00 20
2002-11-01 Fracture 1976.00 1981.00 0
2002-11-08 Fracture 1898.00 1903.00 0
1979-09-08 Fracture 2694.00 2704.00 0
1979-09-11 Fracture 2694.00 2704.00 0
1979-11-17 Packing Device Capped w/Cement 2671.00 2674.00 0
1979-11-17 Perforation 2644.00 2648.00 12
1979-11-18 Acid Treatment 2644.00 2648.00 0
1979-11-20 Fracture 2644.00 2648.00 0
1979-11-23 Cement Squeeze 2644.00 2648.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 333 0.0 0.0 0.0

For data sources see[5]

References