X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706110110000

Well Details

Well ID: 0706110110000
Loading map...
Location: 00/10-01-070-11W6/0
Location Alias: 00/10-01-70-11 W6M
Location Alias 2: 00/10-01-070-11 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 11
Section: 01
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-1-70-11
Operator Name: Cenovus Energy Inc.
License Number: 0074579
License Date: 1979-02-20
License Status: Issued
Spud Date: 1979-03-17
Final Drill Date: 1979-05-14
Well Total Depth: 2880.00 m
Surface Hole Latitude: 55.032990
Surface Hole Longitude: -119.534750

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-20 Obtained License
1979-04-02 Drill Stem Test Performed
1979-04-11 Drill Stem Test Performed
1979-04-17 Drill Stem Test Performed
1979-04-20 Well Log Performed
1979-05-11 Drill Stem Test Performed
1979-05-14 Finished Drilling
1979-05-19 Production Casing Operation Performed
1979-07-28 Perforation Treatment Performed - Jet Perforation
1979-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-08 Perforation Treatment Performed - Fractured
1979-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-01 Perforation Treatment Performed - Jet Perforation
1979-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-03 Perforation Treatment Performed - Fractured
1979-11-06 Perforation Treatment Performed - Fractured
1979-11-09 Perforation Treatment Performed - Jet Perforation
1979-11-12 Perforation Treatment Performed - Jet Perforation
1979-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-14 Perforation Treatment Performed - Fractured
1979-11-17 Perforation Treatment Performed - Fractured
1979-11-21 Perforation Treatment Performed - Jet Perforation
1979-12-05 Perforation Treatment Performed - Cement Squeeze
1979-12-06 Perforation Treatment Performed - Jet Perforation
1979-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-11 Perforation Treatment Performed - Jet Perforation
1979-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-13 Perforation Treatment Performed - Fractured
1979-12-18 Perforation Treatment Performed - Fractured
1980-01-05 Perforation Treatment Performed - Jet Perforation
1980-01-05 Well Mode changed to Drilled and Cased
1980-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-08 Perforation Treatment Performed - Fractured
1980-01-16 Drill Stem Test Performed
1980-01-16 Perforation Treatment Performed - Fractured
1982-12-29 Well Began Production
1982-12-29 Well Fluid changed to Gas
1982-12-29 Well Mode changed to Flowing
1994-08-01 Well Fluid changed to Gas
1994-08-01 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-28 Perforation 2776.00 2780.00 12
1979-11-09 Perforation 2438.00 2454.00 6
1979-11-12 Perforation 2220.00 2231.00 12
1979-11-13 Acid Treatment 2220.00 2231.00 0
1979-11-14 Fracture 2220.00 2231.00 0
1979-11-17 Fracture 2220.00 2231.00 0
1979-11-21 Perforation 2215.00 2220.00 6
1979-12-05 Cement Squeeze 2215.00 2231.00 0
1979-12-06 Perforation 1963.00 1968.00 6
1979-12-07 Acid Treatment 1963.00 1968.00 0
1979-12-10 Packing Device Capped w/Cement 1958.00 1958.00 0
1979-07-29 Acid Treatment 2776.00 2780.00 0
1979-12-11 Perforation 1941.50 1947.00 10
1979-12-12 Acid Treatment 1941.50 1947.00 0
1979-12-13 Fracture 1941.50 1947.00 0
1979-12-18 Fracture 1941.50 1947.00 0
1980-01-05 Perforation 1848.50 1855.00 12
1980-01-06 Acid Treatment 1848.50 1855.00 0
1980-01-08 Fracture 1848.50 1855.00 0
1980-01-16 Fracture 1848.50 1855.00 0
1979-07-31 Acid Treatment 2776.00 2780.00 0
1979-08-08 Fracture 2776.00 2780.00 0
1979-10-31 Packing Device Capped w/Cement 2770.00 2770.00 0
1979-11-01 Perforation 2449.50 2462.00 6
1979-11-02 Acid Treatment 2449.50 2462.00 0
1979-11-03 Fracture 2449.50 2462.00 0
1979-11-06 Fracture 2449.50 2462.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 70 0.0 0.0 0.0
1983 585 0.0 0.0 0.0
1984 1942 0.0 0.0 0.0
1985 1029 0.0 0.0 0.0
1986 1823 0.0 0.0 0.0
1987 3634 0.0 0.0 0.0
1988 505 0.0 0.0 0.0
1989 5036 0.0 0.0 0.0
1990 6718 0.0 0.0 0.0
1991 7185 0.0 0.0 0.0
1992 5493 0.0 0.0 0.0
1993 8483 0.0 0.0 0.0
1994 8081 0.0 0.0 0.0
1995 7977 0.0 0.0 0.0
1996 7360 0.0 0.0 0.0
1997 7520 0.0 0.0 0.0
1998 5859 0.0 0.0 0.0
1999 7517 0.0 0.0 0.0
2000 8410 0.0 0.0 0.0
2001 8135 0.0 0.0 0.0
2002 8471 0.0 0.0 0.0
2003 8254 0.0 0.0 0.0
2004 8353 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 7943 0.0 0.0 0.0
2009 7488 0.0 0.0 0.0
2010 8159 0.0 0.0 0.0
2011 8136 0.0 0.0 0.0
2012 8136 0.0 0.0 0.0
2013 8496 0.0 0.0 0.0
2014 7870 0.0 0.0 0.0
2015 7760 0.0 0.0 0.0
2016 8084 0.0 0.0 0.0
2017 7573 0.0 0.0 0.0
2018 7607 0.0 0.0 0.0
2019 8111 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References