X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706110411000

Well Details

Well ID: 0706110411000
Loading map...
Location: 00/11-04-070-11W6/0
Location Alias: 00/11-04-70-11 W6M
Location Alias 2: 00/11-04-070-11 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 11
Section: 04
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 11-4-70-11
Operator Name: Cenovus Energy Inc.
License Number: 0103990
License Date: 1983-11-04
License Status: Issued
Spud Date: 1984-01-06
Final Drill Date: 1984-02-03
Well Total Depth: 2106.00 m
Surface Hole Latitude: 55.035579
Surface Hole Longitude: -119.615870

For data sources see[1][2]

Well History

Date Event
1983-11-04 Obtained License
1984-01-20 Drill Stem Test Performed
1984-01-24 Drill Stem Test Performed
1984-01-26 Drill Stem Test Performed
1984-01-29 Drill Stem Test Performed
1984-01-30 Drill Stem Test Performed
1984-01-31 Drill Stem Test Performed
1984-02-01 Drill Stem Test Performed
1984-02-03 Finished Drilling
1984-02-03 Well Log Performed
1984-02-06 Production Casing Operation Performed
1984-02-06 Well Mode changed to Drilled and Cased
1984-08-15 Well Log Performed
1984-08-16 Well Log Performed
1984-08-17 Perforation Treatment Performed - Jet Perforation
1984-08-17 Well Log Performed
1984-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-14 Perforation Treatment Performed - Jet Perforation
1984-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-02 Well Log Performed
1984-11-03 Perforation Treatment Performed - Jet Perforation
1984-11-06 Perforation Treatment Performed - Fractured
1984-11-09 Perforation Treatment Performed - Fractured
1984-11-09 Well Log Performed
1984-11-10 Well Log Performed
1984-11-11 Perforation Treatment Performed - Jet Perforation
1985-07-25 Well Began Production
1985-07-25 Well Fluid changed to Gas
1985-07-25 Well Mode changed to Flowing
2003-09-01 Well Fluid changed to Gas
2003-09-01 Well Mode changed to Pumping
2018-06-18 Well Fluid changed to Gas
2018-06-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-08-17 Perforation 1986.20 1989.20 12
1984-11-09 Fracture 1966.50 1980.50 0
1984-11-11 Perforation 1966.50 1974.00 13
1984-08-20 Acid Treatment 1986.20 1989.20 0
1984-08-23 Acid Treatment 1986.20 1989.20 0
1984-10-14 Perforation 1978.00 1980.50 6
1984-10-16 Acid Treatment 1978.00 1980.50 0
1984-10-17 Acid Treatment 1978.00 1980.50 0
1984-10-19 Acid Treatment 1978.00 1980.50 0
1984-11-03 Perforation 1966.50 1974.00 6
1984-11-06 Fracture 1966.50 1980.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 71 0.0 0.0 0.0
1985 570 0.0 0.0 0.0
1986 2051 0.0 0.0 0.0
1987 3986 0.0 0.0 0.0
1988 5775 0.0 0.0 0.0
1989 5918 0.0 0.0 0.0
1990 6755 0.0 0.0 0.0
1991 7282 0.0 0.0 0.0
1992 7883 0.0 0.0 0.0
1993 8410 0.0 0.0 0.0
1994 8198 0.0 0.0 0.0
1995 8480 0.0 0.0 0.0
1996 7784 0.0 0.0 0.0
1997 6742 0.0 0.0 0.0
1998 7280 0.0 0.0 0.0
1999 8449 0.0 0.0 0.0
2000 8383 0.0 0.0 0.0
2001 8355 0.0 0.0 0.0
2002 8210 0.0 0.0 0.0
2003 8429 0.0 0.0 0.0
2004 8444 0.0 0.0 0.0
2005 8477 0.0 0.0 0.0
2006 8495 0.0 0.0 0.0
2007 8352 0.0 0.0 0.0
2008 8688 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8639 0.0 0.0 0.0
2013 8678 0.0 0.0 0.0
2014 8485 0.0 0.0 0.0
2015 8500 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8453 0.0 0.0 0.0
2019 8499 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References