X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706112811003

Well Details

Well ID: 0706112811003
Loading map...
Location: 00/11-28-070-11W6/3
Location Alias: 00/11-28-70-11 W6M
Location Alias 2: 00/11-28-070-11 W6/03
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 11
Section: 28
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 11-28-70-11
Operator Name: Cenovus Energy Inc.
License Number: 0074563
License Date: 1979-02-19
License Status: Issued
Spud Date: 1979-03-27
Final Drill Date: 1979-06-10
Well Total Depth: 2800.00 m
Surface Hole Latitude: 55.093339
Surface Hole Longitude: -119.619870

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-19 Obtained License
1979-03-27 Lost Circulation Occurred
1979-05-08 Well Log Performed
1979-05-19 Drill Stem Test Performed
1979-05-27 Drill Stem Test Performed
1979-06-10 Finished Drilling
1979-06-10 Well Mode changed to Drilled and Cased
1979-06-12 Liner Casing Operation Performed
1979-09-26 Perforation Treatment Performed - Jet Perforation
1979-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-06 Perforation Treatment Performed - Cement Squeeze
1979-10-07 Perforation Treatment Performed - Jet Perforation
1979-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-14 Perforation Treatment Performed - Jet Perforation
1979-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-31 Perforation Treatment Performed - Jet Perforation
1979-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-02 Perforation Treatment Performed - Fractured
1979-11-05 Perforation Treatment Performed - Fractured
1979-11-08 Perforation Treatment Performed - Jet Perforation
1979-11-11 Perforation Treatment Performed - Fractured
1980-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-22 Perforation Treatment Performed - Jet Perforation
1980-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-24 Perforation Treatment Performed - Fractured
1980-04-27 Perforation Treatment Performed - Fractured
1980-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-02 Perforation Treatment Performed - Jet Perforation
1980-05-03 Perforation Treatment Performed - Fractured
1980-05-06 Perforation Treatment Performed - Fractured
1980-11-01 Well Began Production
1980-11-01 Well Fluid changed to Gas
1980-11-01 Well Mode changed to Flowing
1990-06-01 Well Fluid changed to Gas
1990-06-01 Well Mode changed to Suspended
1996-03-07 Well Fluid changed to Gas
1996-03-07 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-26 Perforation 2742.00 2757.00 6
1979-10-18 Packing Device Capped w/Cement 2634.50 2639.50 0
1979-10-18 Packing Device Capped w/Cement 2628.00 2633.00 0
1979-10-31 Perforation 2435.00 2442.00 12
1979-11-01 Acid Treatment 2435.00 2442.00 0
1979-11-02 Fracture 2435.00 2442.00 0
1979-11-05 Fracture 2435.00 2442.00 0
1979-11-08 Perforation 2428.00 2435.00 6
1979-11-11 Fracture 2428.00 2442.00 0
1980-04-22 Packing Device Capped w/Cement 2398.00 2398.00 0
1980-04-22 Perforation 2192.00 2197.50 13
1979-09-27 Acid Treatment 2742.00 2757.00 0
1980-04-23 Acid Treatment 2192.00 2197.50 0
1980-04-24 Fracture 2192.00 2197.50 0
1980-04-27 Fracture 2192.00 2197.50 0
1980-05-02 Perforation 1898.00 1911.00 13
1980-05-02 Acid Treatment 1898.00 1911.00 0
1980-05-03 Fracture 1898.00 1911.00 0
1980-05-06 Fracture 1898.00 1911.00 0
1979-10-06 Cement Squeeze 2742.00 2757.00 0
1979-10-07 Perforation 2732.00 2735.00 6
1979-10-10 Acid Treatment 2732.00 2735.00 0
1979-10-13 Packing Device Capped w/Cement 2726.00 2726.00 0
1979-10-14 Perforation 2646.00 2650.00 13
1979-10-14 Acid Treatment 2646.00 2650.00 0
1979-10-16 Acid Treatment 2646.00 2650.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 341 0.0 0.0 0.0
1981 4618 0.0 0.0 0.0
1982 4993 0.0 0.0 0.0
1983 4073 0.0 0.0 0.0
1984 1162 0.0 0.0 0.0
1985 5238 0.0 0.0 0.0
1986 2580 0.0 0.0 0.0
1987 2419 0.0 0.0 0.0
1988 3744 0.0 0.0 0.0
1996 5237 0.0 0.0 0.0
1997 5548 0.0 0.0 0.0
1998 6122 0.0 0.0 0.0
1999 3657 0.0 0.0 0.0
2000 4864 0.0 0.0 0.0
2001 7157 0.0 0.0 0.0
2002 8447 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8305 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8015 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8472 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8592 0.0 0.0 0.0
2013 5352 0.0 0.0 0.0
2014 8659 0.0 0.0 0.0
2015 8375 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8660 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-03-27 Lost Circulation 28.70 28.70
2013-07-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References