X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706113010000

Well Details

Well ID: 0706113010000
Loading map...
Location: 00/10-30-070-11W6/0
Location Alias: 00/10-30-70-11 W6M
Location Alias 2: 00/10-30-070-11 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 11
Section: 30
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-30-70-11
Operator Name: Cenovus Energy Inc.
License Number: 0066309
License Date: 1977-10-24
License Status: Abandoned
Spud Date: 1977-11-02
Final Drill Date: 1977-12-08
Well Total Depth: 2060.40 m
Surface Hole Latitude: 55.092892
Surface Hole Longitude: -119.660472

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-24 Obtained License
1977-11-11 Drill Stem Test Performed
1977-11-22 Drill Stem Test Performed
1977-12-01 Drill Stem Test Performed
1977-12-02 Drill Stem Test Performed
1977-12-08 Finished Drilling
1977-12-13 Drill Stem Test Performed
1977-12-15 Production Casing Operation Performed
1978-03-24 Perforation Treatment Performed - Jet Perforation
1978-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-04-18 Perforation Treatment Performed - Jet Perforation
1978-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-24 Perforation Treatment Performed - Cement Squeeze
1978-04-25 Perforation Treatment Performed - Jet Perforation
1978-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-01 Perforation Treatment Performed - Fractured
1978-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-05-04 Perforation Treatment Performed - Jet Perforation
1978-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-08 Perforation Treatment Performed - Fractured
1978-05-11 Perforation Treatment Performed - Jet Perforation
1978-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-16 Perforation Treatment Performed - Fractured
1978-05-19 Perforation Treatment Performed - Alcohol Squeeze
1978-07-06 Well Mode changed to Drilled and Cased
1978-07-07 Well Fluid changed to Gas
1978-07-07 Well Mode changed to Testing
1978-07-24 Perforation Treatment Performed - Nitrogen Treatment
2007-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-10 Plug Back Performed
2007-03-10 Well Fluid changed to Gas
2007-03-10 Well Mode changed to Abandoned Zone
2012-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-04 Perforation Treatment Performed - Jet Perforation
2012-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-05 Perforation Treatment Performed - Jet Perforation
2012-07-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-24 Perforation 1922.70 1932.40 3
1978-04-26 Acid Treatment 1759.90 1764.80 0
1978-04-28 Acid Treatment 1759.90 1764.80 0
1978-05-01 Fracture 1759.90 1764.80 0
1978-05-04 Packing Device Capped w/Cement 1752.60 1752.60 0
1978-05-04 Perforation 1319.80 1326.50 7
1978-05-05 Acid Treatment 1319.80 1326.50 0
1978-05-06 Acid Treatment 1319.80 1326.50 0
1978-05-08 Fracture 1319.80 1326.50 0
1978-05-11 Perforation 1263.10 1268.60 10
1978-05-12 Acid Treatment 1263.10 1268.60 0
1978-03-25 Acid Treatment 1922.70 1932.40 0
1978-05-13 Acid Treatment 1263.10 1268.60 0
1978-05-16 Fracture 1263.10 1268.60 0
1978-05-19 Alchohol Squeeze 1263.10 1268.60 0
1978-07-24 Nitrogen Treatment 1263.10 1268.60 0
2007-03-10 Packing Device Capped w/Cement 1302.00 1310.00 0
2007-03-10 Packing Device Capped w/Cement 1251.00 1259.00 0
2012-07-04 Perforation 534.00 535.00 13
2012-07-04 Packing Device Capped w/Cement 517.00 525.00 0
2012-07-04 Perforation 468.00 469.00 13
2012-07-05 Packing Device Capped w/Cement 452.00 460.00 0
1978-03-28 Acid Treatment 1922.70 1932.40 0
2012-07-05 Perforation 432.00 433.00 17
2012-07-05 Packing Device Capped w/Cement 415.00 423.00 0
2012-07-05 Perforation 344.00 345.00 17
2012-07-05 Packing Device Capped w/Cement 325.00 333.00 0
1978-04-17 Packing Device Capped w/Cement 1905.00 1905.00 0
1978-04-18 Perforation 1786.10 1793.70 7
1978-04-19 Acid Treatment 1786.10 1793.70 0
1978-04-21 Acid Treatment 1786.10 1793.70 0
1978-04-24 Cement Squeeze 1786.10 1793.70 0
1978-04-25 Perforation 1759.90 1764.80 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 153 0.0 0.0 0.0
1984 120 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References