X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706122106000

Well Details

Well ID: 0706122106000
Loading map...
Location: 00/06-21-070-12W6/0
Location Alias: 00/06-21-70-12 W6M
Location Alias 2: 00/06-21-070-12 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 12
Section: 21
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 6-21-70-12
Operator Name: Cenovus Energy Inc.
License Number: 0075134
License Date: 1979-04-03
License Status: RecCertified
Spud Date: 1979-04-09
Final Drill Date: 1979-05-17
Well Total Depth: 2135.00 m
Surface Hole Latitude: 55.072891
Surface Hole Longitude: -119.768432

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-03 Obtained License
1979-04-09 Lost Circulation Occurred
1979-04-13 Lost Circulation Occurred
1979-05-17 Finished Drilling
1979-05-19 Well Log Performed
1979-05-20 Drill Stem Test Performed
1979-06-02 Production Casing Operation Performed
1979-08-05 Well Mode changed to Drilled and Cased
1979-08-06 Perforation Treatment Performed - Jet Perforation
1979-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-11 Perforation Treatment Performed - Fractured
1981-06-10 Well Began Production
1981-06-10 Well Fluid changed to Gas
1981-06-10 Well Mode changed to Flowing
1988-08-01 Well Fluid changed to Gas
1988-08-01 Well Mode changed to Suspended
1988-12-01 Well Fluid changed to Gas
1988-12-01 Well Mode changed to Flowing
2005-04-01 Well Fluid changed to Gas
2005-04-01 Well Mode changed to Suspended
2011-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-19 Plug Back Performed
2011-03-19 Well Fluid changed to Gas
2011-03-19 Well Log Performed
2011-03-19 Well Mode changed to Abandoned Zone
2011-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-20 Perforation Treatment Performed - Jet Perforation
2011-03-20 Perforation Treatment Performed - Remedial Casing
2011-03-20 Well Log Performed
2011-04-01 Well Abandoned
2011-04-01 Well Fluid changed to Gas
2011-04-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-06 Perforation 1977.00 1981.50 12
1979-08-07 Acid Treatment 1977.00 1981.50 0
1979-08-08 Acid Treatment 1977.00 1981.50 0
1979-08-11 Fracture 1977.00 1981.50 0
2011-03-19 Packing Device Capped w/Cement 1959.00 1967.00 0
2011-03-20 Perforation 397.00 398.00 20
2011-03-20 Perforation 231.00 232.00 20
2011-03-20 Packing Device Capped w/Cement 382.00 390.00 0
2011-03-20 Remedial Casing Cementing 231.00 232.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 2836 0.0 0.0 0.0
1982 4559 0.0 0.0 0.0
1983 5044 0.0 0.0 0.0
1984 3049 0.0 0.0 0.0
1985 3600 0.0 0.0 0.0
1986 1436 0.0 0.0 0.0
1987 1638 0.0 0.0 0.0
1988 277 0.0 0.0 0.0
1989 3959 0.0 0.0 0.0
1990 4976 0.0 0.0 0.0
1991 4798 0.0 0.0 0.0
1992 3713 0.0 0.0 0.0
1993 3781 0.0 0.0 0.0
1994 2629 0.0 0.0 0.0
1995 1641 0.0 0.0 0.0
1996 938 0.0 0.0 0.0
1997 440 0.0 0.0 0.0
1998 1134 0.0 0.0 0.0
1999 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-04-09 Lost Circulation 161.00 161.00
1979-04-13 Lost Circulation 223.00 223.00

For data sources see[6]

References