If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0706130610022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.036013,"lon":-119.96501,"icon":""}]} |
Location: 02/10-06-070-13W6/2 | |
Location Alias: 02/10-06-70-13 W6M | |
Location Alias 2: 02/10-06-070-13 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 6 | |
Range: 13 | |
Section: 06 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CVE ELM 10-6-70-13 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0086132 | |
License Date: 1980-10-07 | |
License Status: Issued | |
Spud Date: 1980-10-10 | |
Final Drill Date: 1980-12-02 | |
Well Total Depth: 2721.00 m | |
Surface Hole Latitude: 55.036013 | |
Surface Hole Longitude: -119.965010 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-08-24 | Well Log Performed |
1980-10-07 | Obtained License |
1980-10-17 | Drill Stem Test Performed |
1980-10-22 | Lost Circulation Occurred |
1980-11-13 | Lost Circulation Occurred |
1980-11-19 | Lost Circulation Occurred |
1980-12-02 | Finished Drilling |
1980-12-02 | Well Mode changed to Drilled and Cased |
1980-12-03 | Well Log Performed |
1980-12-04 | Lost Circulation Occurred |
1980-12-07 | Production Casing Operation Performed |
1981-05-18 | Perforation Treatment Performed - Jet Perforation |
1981-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-05-20 | Perforation Treatment Performed - Fractured |
1981-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-05-27 | Perforation Treatment Performed - Jet Perforation |
1981-05-28 | Perforation Treatment Performed - Fractured |
1981-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-05-31 | Perforation Treatment Performed - Jet Perforation |
1981-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-06-03 | Perforation Treatment Performed - Fractured |
1981-06-08 | Perforation Treatment Performed - Fractured |
1981-06-12 | Perforation Treatment Performed - Jet Perforation |
1981-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-06-15 | Perforation Treatment Performed - Fractured |
1981-06-17 | Perforation Treatment Performed - Fractured |
1997-08-20 | Plug Back Performed |
1997-08-25 | Perforation Treatment Performed - Jet Perforation |
1997-08-27 | Perforation Treatment Performed - Fractured |
1997-09-18 | Well Began Production |
1997-09-18 | Well Fluid changed to Gas |
1997-09-18 | Well Mode changed to Flowing |
2004-03-12 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-05-18 | Perforation | 2642.00 | 2646.00 | 12 |
1981-06-01 | Acid Treatment | 2251.00 | 2259.00 | 0 |
1981-06-03 | Fracture | 2251.00 | 2259.00 | 0 |
1981-06-08 | Fracture | 2251.00 | 2259.00 | 0 |
1981-06-12 | Perforation | 2226.00 | 2234.00 | 6 |
1981-06-12 | Perforation | 2240.00 | 2246.00 | 6 |
1981-06-14 | Acid Treatment | 2240.00 | 2246.00 | 0 |
1981-06-15 | Fracture | 2240.00 | 2246.00 | 0 |
1981-06-17 | Fracture | 2240.00 | 2246.00 | 0 |
1997-08-25 | Perforation | 2114.50 | 2120.00 | 20 |
1997-08-27 | Fracture | 2114.50 | 2120.00 | 0 |
1981-05-19 | Acid Treatment | 2642.00 | 2646.00 | 0 |
1981-05-20 | Fracture | 2642.00 | 2646.00 | 0 |
1981-05-26 | Packing Device Capped w/Cement | 2635.00 | 2635.00 | 0 |
1981-05-27 | Perforation | 2605.00 | 2608.00 | 12 |
1981-05-27 | Acid Treatment | 2605.00 | 2608.00 | 0 |
1981-05-28 | Fracture | 2605.00 | 2608.00 | 0 |
1981-05-30 | Packing Device Capped w/Cement | 2600.00 | 2600.00 | 0 |
1981-05-31 | Perforation | 2251.00 | 2259.00 | 12 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 1526 | 0.0 | 0.0 | 0.0 |
1998 | 6093 | 0.0 | 0.0 | 0.0 |
1999 | 7535 | 0.0 | 0.0 | 0.0 |
2000 | 124 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-10-22 | Lost Circulation | 1480.00 | 1826.00 |
1980-11-13 | Lost Circulation | 2239.00 | 2243.00 |
1980-11-19 | Lost Circulation | 2326.00 | 2326.00 |
1980-12-04 | Lost Circulation | 2721.00 | 2721.00 |
For data sources see[6]