X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706142510003

Well Details

Well ID: 0706142510003
Loading map...
Location: 00/10-25-070-14W6/3
Location Alias: 00/10-25-70-14 W6M
Location Alias 2: 00/10-25-070-14 W6/03
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 14
Section: 25
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 10-25-70-14
Operator Name: Cenovus Energy Inc.
License Number: 0073367
License Date: 1978-12-07
License Status: Issued
Spud Date: 1979-03-05
Final Drill Date: 1979-06-08
Well Total Depth: 3663.00 m
Surface Hole Latitude: 55.091481
Surface Hole Longitude: -119.994346

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-07 Obtained License
1979-03-26 Lost Circulation Occurred
1979-05-01 Drill Stem Test Performed
1979-05-11 Drill Stem Test Performed
1979-06-02 Lost Circulation Occurred
1979-06-04 Well Log Performed
1979-06-07 Drill Stem Test Performed
1979-06-08 Finished Drilling
1979-06-09 Liner Casing Operation Performed
1979-11-29 Perforation Treatment Performed - Jet Perforation
1979-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-04 Perforation Treatment Performed - Fractured
1979-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-11 Perforation Treatment Performed - Jet Perforation
1979-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-15 Perforation Treatment Performed - Fractured
1979-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-01-05 Perforation Treatment Performed - Jet Perforation
1980-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-12 Perforation Treatment Performed - Fractured
1980-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-27 Perforation Treatment Performed - Jet Perforation
1980-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-29 Perforation Treatment Performed - Fractured
1980-03-31 Perforation Treatment Performed - Fractured
1980-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-09 Perforation Treatment Performed - Jet Perforation
1980-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-11 Perforation Treatment Performed - Fractured
1980-04-17 Perforation Treatment Performed - Jet Perforation
1980-04-17 Well Mode changed to Drilled and Cased
1980-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-19 Perforation Treatment Performed - Fractured
1980-04-21 Perforation Treatment Performed - Fractured
1980-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-20 Perforation Treatment Performed - Jet Perforation
1980-09-27 Perforation Treatment Performed - Fractured
1991-01-16 Well Began Production
1991-01-16 Well Fluid changed to Gas
1991-01-16 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-29 Perforation 3210.00 3223.00 5
1979-12-20 Packing Device Capped w/Cement 3099.00 3107.00 0
1980-01-05 Perforation 2940.00 2943.00 12
1980-01-07 Acid Treatment 2940.00 2943.00 0
1980-01-12 Fracture 2940.00 2943.00 0
1980-01-16 Packing Device Capped w/Cement 2907.00 2915.00 0
1980-03-27 Perforation 2571.00 2577.00 12
1980-03-28 Acid Treatment 2571.00 2577.00 0
1980-03-29 Fracture 2571.00 2577.00 0
1980-03-31 Fracture 2571.00 2577.00 0
1980-04-08 Packing Device Capped w/Cement 2560.00 2565.00 0
1979-11-30 Acid Treatment 3210.00 3223.00 0
1980-04-09 Perforation 2527.00 2533.00 12
1980-04-09 Perforation 2515.00 2520.00 12
1980-04-10 Acid Treatment 2515.00 2533.00 0
1980-04-11 Fracture 2515.00 2533.00 0
1980-04-17 Perforation 2169.00 2176.00 12
1980-04-18 Acid Treatment 2169.00 2176.00 0
1980-04-19 Fracture 2169.00 2176.00 0
1980-04-21 Fracture 2169.00 2176.00 0
1980-09-20 Perforation 2143.50 2151.00 12
1980-09-20 Acid Treatment 2143.50 2151.00 0
1979-12-04 Fracture 3210.00 3223.00 0
1980-09-27 Fracture 2143.50 2151.00 0
1979-12-10 Packing Device Capped w/Cement 3199.00 3204.00 0
1979-12-11 Perforation 3139.00 3142.00 12
1979-12-11 Perforation 3122.00 3125.00 12
1979-12-11 Perforation 3112.00 3115.00 12
1979-12-12 Acid Treatment 3112.00 3142.00 0
1979-12-15 Fracture 3112.00 3142.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1940 0.0 0.0 0.0
1992 1742 0.0 0.0 0.0
1993 8079 0.0 0.0 0.0
1994 8224 0.0 0.0 0.0
1995 6923 0.0 0.0 0.0
1996 6259 0.0 0.0 0.0
1997 6320 0.0 0.0 0.0
1998 5072 0.0 0.0 0.0
1999 5289 0.0 0.0 0.0
2000 5868 0.0 0.0 0.0
2001 2670 0.0 0.0 0.0
2002 8257 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8374 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 8591 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8247 0.0 0.0 0.0
2016 8543 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 7914 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-03-26 Lost Circulation 1584.00 1639.00
1979-06-02 Lost Circulation 1682.00 1682.00

For data sources see[6]

References