X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716070708000

Well Details

Well ID: 0716070708000
Loading map...
Location: 00/08-07-071-07W6/0
Location Alias: 00/08-07-71-07 W6M
Location Alias 2: 00/08-07-071-07 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 07
Section: 07
County/Municipality: County of Grande Prairie No. 1
Well Name: PIPESTONE ELM 8-7-71-7
Operator Name: Pipestone Energy Corp.
License Number: 0480887
License Date: 2016-10-21
License Status: Amended
Spud Date: 2017-01-26
Final Drill Date: 2017-02-19
Well Total Depth: 4865.00 m
Surface Hole Latitude: 55.145907
Surface Hole Longitude: -119.091011

For data sources see[1][2]

Well History

Date Event
2016-10-21 Obtained License
2017-01-28 Surface Casing Operation Performed
2017-02-02 Direction Drilling Operation Performed - Deviate
2017-02-08 Intermediate Casing Operation Performed
2017-02-09 Direction Drilling Operation Performed - Horizontal
2017-02-19 Finished Drilling
2017-02-19 Well Mode changed to Drilled and Cased
2017-02-23 Liner Casing Operation Performed
2017-02-25 Rig Released
2017-03-23 Perforation Treatment Performed - Jet Perforation
2017-04-29 Well Log Performed
2017-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-08 Well Fluid changed to Gas
2017-05-08 Well Mode changed to Testing
2017-06-01 Well Log Performed
2017-06-02 Well Log Performed
2018-02-28 Well Fluid changed to Gas
2018-02-28 Well Mode changed to Test Completed
2018-03-14 Well Fluid changed to Gas
2018-03-14 Well Mode changed to Testing
2018-03-15 Well Log Performed
2018-05-31 Well Fluid changed to Gas
2018-05-31 Well Mode changed to Test Completed
2019-12-07 Well Fluid changed to Gas
2019-12-07 Well Mode changed to Testing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-26 Beaver Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-02 2080.00 Deviate (5 - 79 degrees)
2017-02-09 2480.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-23 Perforation 4788.70 4798.70 20
2017-05-02 Multi-Stage Fracture 4469.40 4469.50 0
2017-05-02 Multi-Stage Fracture 4427.80 4427.90 0
2017-05-02 Multi-Stage Fracture 4386.00 4386.10 0
2017-05-02 Multi-Stage Fracture 4343.90 4344.00 0
2017-05-02 Multi-Stage Fracture 4302.60 4302.70 0
2017-05-02 Multi-Stage Fracture 4260.40 4260.50 0
2017-05-02 Multi-Stage Fracture 4218.30 4218.40 0
2017-05-02 Multi-Stage Fracture 4176.20 4176.30 0
2017-05-02 Multi-Stage Fracture 4134.00 4134.10 0
2017-05-02 Multi-Stage Fracture 4092.70 4092.80 0
2017-05-01 Multi-Stage Fracture 4787.00 4788.00 0
2017-05-02 Multi-Stage Fracture 4050.60 4050.70 0
2017-05-02 Multi-Stage Fracture 4008.60 4008.70 0
2017-05-03 Multi-Stage Fracture 3966.50 3966.60 0
2017-05-03 Multi-Stage Fracture 3924.40 3924.50 0
2017-05-03 Multi-Stage Fracture 3882.30 3882.40 0
2017-05-03 Multi-Stage Fracture 3840.40 3840.50 0
2017-05-03 Multi-Stage Fracture 3798.40 3798.50 0
2017-05-03 Multi-Stage Fracture 3756.40 3756.50 0
2017-05-03 Multi-Stage Fracture 3714.40 3714.50 0
2017-05-03 Multi-Stage Fracture 3672.40 3672.50 0
2017-05-01 Multi-Stage Fracture 4763.90 4764.00 0
2017-05-03 Multi-Stage Fracture 3630.20 3630.30 0
2017-05-03 Multi-Stage Fracture 3588.10 3588.20 0
2017-05-03 Multi-Stage Fracture 3545.30 3545.40 0
2017-05-04 Multi-Stage Fracture 3503.50 3503.60 0
2017-05-04 Multi-Stage Fracture 3462.20 3462.30 0
2017-05-04 Multi-Stage Fracture 3420.40 3420.50 0
2017-05-04 Multi-Stage Fracture 3378.40 3378.50 0
2017-05-04 Multi-Stage Fracture 3336.30 3336.40 0
2017-05-04 Multi-Stage Fracture 3294.20 3294.30 0
2017-05-05 Multi-Stage Fracture 3252.30 3252.40 0
2017-05-01 Multi-Stage Fracture 4722.00 4722.10 0
2017-05-05 Multi-Stage Fracture 3210.30 3210.40 0
2017-05-05 Multi-Stage Fracture 3168.20 3168.30 0
2017-05-05 Multi-Stage Fracture 3126.20 3126.30 0
2017-05-05 Multi-Stage Fracture 3084.30 3084.40 0
2017-05-05 Multi-Stage Fracture 3042.30 3042.40 0
2017-05-05 Multi-Stage Fracture 3000.40 3000.50 0
2017-05-05 Multi-Stage Fracture 2958.40 2958.50 0
2017-05-05 Multi-Stage Fracture 2916.50 2916.60 0
2017-05-05 Multi-Stage Fracture 2874.40 2874.50 0
2017-05-05 Multi-Stage Fracture 2832.40 2832.50 0
2017-05-01 Multi-Stage Fracture 4680.00 4680.10 0
2017-05-05 Multi-Stage Fracture 2790.60 2790.70 0
2017-05-06 Multi-Stage Fracture 2748.60 2748.70 0
2017-05-06 Multi-Stage Fracture 2706.50 2706.60 0
2017-05-06 Multi-Stage Fracture 2664.40 2664.50 0
2017-05-06 Multi-Stage Fracture 2635.40 2635.50 0
2017-05-06 Multi-Stage Fracture 2605.90 2606.00 0
2017-05-06 Multi-Stage Fracture 2577.60 2577.70 0
2017-05-06 Multi-Stage Fracture 2548.10 2548.20 0
2017-05-06 Multi-Stage Fracture 2518.70 2518.80 0
2017-05-06 Multi-Stage Fracture 2489.20 2489.30 0
2017-05-01 Multi-Stage Fracture 4637.90 4638.00 0
2017-05-02 Multi-Stage Fracture 4595.70 4595.80 0
2017-05-02 Multi-Stage Fracture 4553.60 4553.70 0
2017-05-02 Multi-Stage Fracture 4511.50 4511.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-01 2017-05-06 2,356 19,397 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.586 N/A
30/50 PR-6000 Calfrac Quartz 14808-60-7 100 2.485 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.1315 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.4726 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 1.0571 N/A
Water 7732-18-5 100 1.0571 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0343 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0343 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0292 N/A
Water 7732-18-5 100 0.0292 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0033 N/A
Cinnamaldehyde 104-55-2 100 0.0033 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0033 N/A
Ethylene Glycol 107-21-1 100 0.0033 N/A
Formic acid 64-18-6 100 0.0033 N/A
Isopropyl alcohol 67-63-0 100 0.0033 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0033 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0033 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.1103 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1103 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.3411 N/A
DAP-902 Calfrac Scale Inhibitor Non-Hazardous Ingredients Trade Secret 100 0.0264 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-05 2017-05-06 Surface Water - Runoff 19397

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 437 0.0 0.0 0.0
2018 34 0.0 0.0 0.0
2019 541 0.0 0.0 0.0
2020 739 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-25 No Incident Encountered 0.00 0.00
2017-06-08 No Incident Encountered 0.00 0.00
2018-06-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References