X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716080310003

Well Details

Well ID: 0716080310003
Loading map...
Location: 00/10-03-071-08W6/3
Location Alias: 00/10-03-71-08 W6M
Location Alias 2: 00/10-03-071-08 W6/03
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 08
Section: 03
County/Municipality: County of Grande Prairie No. 1
Well Name: BLIZZARD ELM 10-3-71-8
Operator Name: TAQA North Ltd.
License Number: 0075224
License Date: 1979-04-12
License Status: Suspension
Spud Date: 1979-04-19
Final Drill Date: 1979-06-06
Well Total Depth: 2370.00 m
Surface Hole Latitude: 55.122517
Surface Hole Longitude: -119.137024

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-12 Obtained License
1979-06-06 Finished Drilling
1979-06-06 Well Mode changed to Drilled and Cased
1979-06-07 Drill Stem Test Performed
1979-06-07 Well Log Performed
1979-06-08 Drill Stem Test Performed
1979-06-09 Drill Stem Test Performed
1979-06-11 Drill Stem Test Performed
1979-06-14 Production Casing Operation Performed
1979-10-02 Perforation Treatment Performed - Jet Perforation
1979-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-17 Perforation Treatment Performed - Jet Perforation
1979-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-31 Perforation Treatment Performed - Jet Perforation
1979-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-20 Plug Back Performed
1979-11-22 Perforation Treatment Performed - Jet Perforation
1987-07-24 Well Log Performed
1987-07-25 Perforation Treatment Performed - Fractured
1987-07-25 Perforation Treatment Performed - Jet Perforation
1987-07-28 Perforation Treatment Performed - Fractured
2004-10-12 Perforation Treatment Performed - Jet Perforation
2004-10-12 Well Log Performed
2004-10-14 Well Log Performed
2004-10-16 Perforation Treatment Performed - Jet Perforation
2004-10-16 Well Log Performed
2004-10-17 Perforation Treatment Performed - Fractured
2004-11-17 Perforation Treatment Performed - Jet Perforation
2004-11-17 Well Log Performed
2004-11-18 Well Log Performed
2004-11-20 Perforation Treatment Performed - Fractured
2004-11-25 Perforation Treatment Performed - Jet Perforation
2004-11-25 Well Log Performed
2004-11-26 Perforation Treatment Performed - Fractured
2005-02-05 Well Structure changed to Commingled
2011-12-04 Perforation Treatment Performed - Jet Perforation
2011-12-05 Perforation Treatment Performed - Jet Perforation
2011-12-07 Perforation Treatment Performed - Cement Squeeze
2011-12-22 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-02 Perforation 2228.00 2229.00 7
1979-11-20 Packing Device Capped w/Cement 2172.00 2175.00 0
1979-11-22 Perforation 2083.00 2089.00 6
1987-07-25 Perforation 2083.00 2089.00 13
1987-07-25 Fracture 2083.00 2089.00 0
1987-07-28 Fracture 2083.00 2089.00 0
2004-10-12 Perforation 2078.00 2079.00 17
2004-10-16 Perforation 2038.00 2039.00 17
2004-10-16 Perforation 2042.00 2044.00 17
2004-10-17 Fracture 2038.00 2044.00 0
2004-11-17 Perforation 1877.00 1878.50 17
1979-10-04 Acid Treatment 2228.00 2229.00 0
2004-11-17 Perforation 1880.00 1881.00 17
2004-11-17 Perforation 1882.00 1883.00 17
2004-11-20 Fracture 1877.00 1883.00 0
2004-11-25 Perforation 1083.50 1085.50 17
2004-11-26 Fracture 1083.50 1085.50 0
2011-12-04 Perforation 610.00 610.30 99
2011-12-05 Perforation 475.00 475.30 99
2011-12-07 Cement Squeeze 610.00 610.30 0
2011-12-22 Cement Squeeze 1083.50 1085.50 0
2011-12-22 Cement Squeeze 475.00 475.30 0
1979-10-15 Packing Device Capped w/Cement 2220.00 2220.00 0
1979-10-17 Perforation 2204.00 2206.00 7
1979-10-17 Perforation 2208.00 2209.80 7
1979-10-28 Packing Device Capped w/Cement 2200.00 2203.00 0
1979-10-31 Perforation 2194.00 2197.50 7
1979-10-31 Perforation 2183.50 2185.00 7
1979-11-05 Acid Treatment 2183.50 2197.50 0

For data sources see[4]



References