X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716083008000

Well Details

Well ID: 0716083008000
Loading map...
Location: 00/08-30-071-08W6/0
Location Alias: 00/08-30-71-08 W6M
Location Alias 2: 00/08-30-071-08 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 08
Section: 30
County/Municipality: County of Grande Prairie No. 1
Well Name: NUVISTA WEMBLEY 8-30-71-8
Operator Name: NuVista Energy Ltd.
License Number: 0101079
License Date: 1983-03-24
License Status: RecCertified
Spud Date: 1983-04-02
Final Drill Date: 1983-04-26
Well Total Depth: 2475.00 m
Surface Hole Latitude: 55.177085
Surface Hole Longitude: -119.208036

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-24 Obtained License
1983-04-10 Drill Stem Test Performed
1983-04-21 Kick Occurred
1983-04-26 Finished Drilling
1983-04-26 Well Mode changed to Drilled and Cased
1983-04-27 Well Log Performed
1983-04-28 Drill Stem Test Performed
1983-04-30 Drill Stem Test Performed
1983-05-01 Production Casing Operation Performed
1983-05-30 Perforation Treatment Performed - Jet Perforation
1983-05-31 Perforation Treatment Performed - Remedial Casing
1983-06-02 Perforation Treatment Performed - Jet Perforation
1983-06-03 Perforation Treatment Performed - Cement Squeeze
1983-06-08 Perforation Treatment Performed - Cement Squeeze
1983-06-09 Perforation Treatment Performed - Jet Perforation
1983-06-11 Perforation Treatment Performed - Fractured
1983-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-06-16 Perforation Treatment Performed - Jet Perforation
1983-06-21 Perforation Treatment Performed - Cement Squeeze
1983-06-24 Perforation Treatment Performed - Jet Perforation
1983-06-30 Perforation Treatment Performed - Cement Squeeze
1983-06-30 Perforation Treatment Performed - Jet Perforation
1983-07-10 Perforation Treatment Performed - Jet Perforation
1983-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-14 Perforation Treatment Performed - Jet Perforation
1983-07-15 Perforation Treatment Performed - Cement Squeeze
1983-07-19 Perforation Treatment Performed - Cement Squeeze
1983-07-21 Perforation Treatment Performed - Jet Perforation
1983-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-17 Perforation Treatment Performed - Fractured
1983-11-11 Well Began Production
1983-11-11 Well Fluid changed to Crude Oil
1983-11-11 Well Mode changed to Pumping
1986-08-28 Well Fluid changed to Crude Oil
1986-08-28 Well Mode changed to Suspended
1987-07-15 Perforation Treatment Performed - Cement Squeeze
1987-07-15 Plug Back Performed
1987-07-15 Well Fluid changed to Crude Oil
1987-07-15 Well Mode changed to Abandoned Zone
1987-07-22 Perforation Treatment Performed - Cement Squeeze
1987-08-02 Perforation Treatment Performed - Cement Squeeze
1987-08-03 Perforation Treatment Performed - Cement Squeeze
1987-08-06 Perforation Treatment Performed - Jet Perforation
1987-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-05 Perforation Treatment Performed - Jet Perforation
1991-10-05 Plug Back Performed
1991-10-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-05-30 Perforation 2372.50 2373.50 7
1983-06-09 Perforation 1675.80 1679.00 7
1983-06-11 Fracture 1673.30 1679.00 0
1983-06-15 Packing Device Capped w/Cement 1641.50 1649.00 0
1983-06-16 Perforation 1127.00 1129.50 7
1983-06-21 Cement Squeeze 1127.00 1129.50 0
1983-06-24 Perforation 1127.00 1129.50 13
1983-06-30 Perforation 1140.00 1141.00 7
1983-06-30 Cement Squeeze 1127.00 1129.50 0
1983-06-30 Cement Squeeze 1140.00 1141.00 0
1983-07-10 Perforation 1124.50 1128.00 13
1983-05-30 Perforation 2335.00 2336.00 7
1983-07-12 Acid Treatment 1124.50 1128.00 0
1983-07-14 Perforation 1140.00 1141.00 13
1983-07-15 Cement Squeeze 1140.00 1141.00 0
1983-07-19 Cement Squeeze 1124.50 1128.00 0
1983-07-21 Perforation 1125.50 1127.50 7
1983-07-22 Acid Treatment 1125.50 1127.50 0
1983-10-17 Fracture 1125.50 1127.50 0
1987-07-15 Cement Squeeze 1125.50 1127.50 0
1987-07-22 Cement Squeeze 1656.00 1679.00 0
1987-08-02 Cement Squeeze 1656.00 1690.00 0
1983-05-31 Remedial Casing Cementing 2335.00 2336.00 0
1987-08-03 Cement Squeeze 1124.50 1141.00 0
1987-08-06 Perforation 2345.00 2347.00 7
1987-08-06 Perforation 2348.00 2349.50 7
1987-08-06 Perforation 2351.00 2354.00 7
1987-08-06 Perforation 2356.00 2359.00 7
1987-08-07 Acid Treatment 2345.00 2359.00 0
1991-10-05 Packing Device Capped w/Cement 2322.00 2330.00 0
1991-10-05 Packing Device Capped w/Cement 1112.00 1120.00 0
1991-10-05 Perforation 498.00 500.00 73
1991-10-05 Packing Device Capped w/Cement 482.00 490.00 0
1983-05-31 Remedial Casing Cementing 2372.50 2373.50 0
1983-06-02 Perforation 1689.00 1690.00 7
1983-06-02 Perforation 1656.00 1657.00 7
1983-06-03 Cement Squeeze 1656.00 1690.00 0
1983-06-08 Cement Squeeze 1689.00 1690.00 0
1983-06-09 Perforation 1673.30 1675.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1271 0.0 0.0 0.0
1984 8023 0.0 0.0 0.0
1985 8673 0.0 0.0 0.0
1986 5711 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-04-21 Kick 2350.00 2350.00

For data sources see[6]

References