X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716100305000

Well Details

Well ID: 0716100305000
Loading map...
Location: 00/05-03-071-10W6/0
Location Alias: 00/05-03-71-10 W6M
Location Alias 2: 00/05-03-071-10 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 10
Section: 03
County/Municipality: County of Grande Prairie No. 1
Well Name: CARDINAL ELM 5-3-71-10
Operator Name: Cardinal Energy Ltd.
License Number: 0345226
License Date: 2005-12-13
License Status: Issued
Spud Date: 2006-01-14
Final Drill Date: 2006-01-22
Well Total Depth: 2035.00 m
Surface Hole Latitude: 55.118358
Surface Hole Longitude: -119.460337

For data sources see[1][2]

Well History

Date Event
2005-12-13 Obtained License
2006-01-16 Surface Casing Operation Performed
2006-01-22 Finished Drilling
2006-01-22 Well Mode changed to Drilled and Cased
2006-01-23 Well Log Performed
2006-01-24 Production Casing Operation Performed
2006-01-24 Rig Released
2006-05-14 Perforation Treatment Performed - Jet Perforation
2006-05-20 Perforation Treatment Performed - Fractured
2006-05-24 Perforation Treatment Performed - Jet Perforation
2006-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-05-26 Perforation Treatment Performed - Fractured
2006-05-31 Perforation Treatment Performed - Cement Squeeze
2006-05-31 Plug Back Performed
2006-06-06 Perforation Treatment Performed - Jet Perforation
2006-06-07 Perforation Treatment Performed - Fractured
2006-06-20 Well Began Production
2006-06-20 Well Fluid changed to Gas
2006-06-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-05-14 Perforation 1882.00 1888.00 17
2006-05-20 Fracture 1882.00 1888.00 0
2006-05-24 Perforation 1827.00 1830.00 17
2006-05-24 Perforation 1818.00 1823.00 17
2006-05-26 Fracture 1818.00 1830.00 0
2006-05-26 Acid Treatment 1818.00 1830.00 0
2006-05-31 Cement Squeeze 1818.00 1830.00 0
2006-06-06 Perforation 1698.50 1702.00 17
2006-06-07 Fracture 1698.50 1702.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4175 0.0 0.0 0.0
2007 7739 0.0 0.0 0.0
2008 8234 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8448 0.0 0.0 0.0
2013 7175 0.0 0.0 0.0
2014 7176 0.0 0.0 0.0
2015 2591 0.0 0.0 0.0
2016 6960 0.0 0.0 0.0
2017 8567 0.0 0.0 0.0
2018 8159 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 1919 0.0 0.0 0.0

For data sources see[5]

References