Well ID: 0716101610002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.149329,"lon":-119.473576,"icon":""}]} |
Location: 00/10-16-071-10W6/2 | |
Location Alias: 00/10-16-71-10 W6M | |
Location Alias 2: 00/10-16-071-10 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 10 | |
Section: 16 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CHIRRIPO ELM 10-16-71-10 | |
Operator Name: Second Wave Petroleum Inc. | |
License Number: 0141871 | |
License Date: 1989-11-27 | |
License Status: Abandoned | |
Spud Date: 1989-12-02 | |
Final Drill Date: 1989-12-15 | |
Well Total Depth: 1914.00 m | |
Surface Hole Latitude: 55.149329 | |
Surface Hole Longitude: -119.473576 |
Date | Event |
---|---|
1989-11-27 | Obtained License |
1989-12-04 | Surface Casing Operation Performed |
1989-12-15 | Finished Drilling |
1989-12-15 | Well Log Performed |
1989-12-15 | Well Mode changed to Drilled and Cased |
1989-12-16 | Drill Stem Test Performed |
1989-12-17 | Drill Stem Test Performed |
1989-12-19 | Production Casing Operation Performed |
1989-12-19 | Rig Released |
1990-01-23 | Perforation Treatment Performed - Jet Perforation |
1990-01-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-01-25 | Perforation Treatment Performed - Fractured |
2007-09-10 | Perforation Treatment Performed - Jet Perforation |
2007-09-12 | Perforation Treatment Performed - Fractured |
2009-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-01-16 | Plug Back Performed |
2009-01-17 | Perforation Treatment Performed - Jet Perforation |
2009-02-22 | Perforation Treatment Performed - Fractured |
2009-05-01 | Well Began Production |
2009-05-01 | Well Fluid changed to Gas |
2009-05-01 | Well Mode changed to Flowing |
2018-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-09 | Perforation Treatment Performed - Jet Perforation |
2018-11-09 | Plug Back Performed |
2018-11-09 | Well Log Performed |
2018-11-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-10 | Perforation Treatment Performed - Cement Squeeze |
2018-11-10 | Plug Back Performed |
2018-11-10 | Well Fluid changed to Gas |
2018-11-10 | Well Mode changed to Abandoned Zone |
2019-03-01 | Well Abandoned |
2019-03-01 | Well Fluid changed to Gas |
2019-03-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-01-23 | Perforation | 1798.00 | 1801.00 | 13 |
2009-02-22 | Fracture | 1188.00 | 1191.00 | 0 |
2018-11-09 | Packing Device Capped w/Cement | 1167.00 | 1175.00 | 0 |
2018-11-09 | Perforation | 592.00 | 593.00 | 13 |
2018-11-10 | Cement Squeeze | 592.00 | 593.00 | 0 |
2018-11-10 | Packing Device Capped w/Cement | 577.00 | 585.00 | 0 |
1990-01-24 | Acid Treatment | 1798.00 | 1801.00 | 0 |
1990-01-25 | Fracture | 1798.00 | 1801.00 | 0 |
2007-09-10 | Perforation | 1879.00 | 1881.00 | 14 |
2007-09-10 | Perforation | 1861.00 | 1866.00 | 14 |
2007-09-10 | Perforation | 1842.00 | 1843.00 | 14 |
2007-09-12 | Fracture | 1842.00 | 1881.00 | 0 |
2009-01-16 | Packing Device Capped w/Cement | 1779.00 | 1787.00 | 0 |
2009-01-17 | Perforation | 1188.00 | 1191.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4944 | 0.0 | 0.0 | 0.0 |
2010 | 8663 | 0.0 | 0.0 | 0.0 |
2011 | 8735 | 0.0 | 0.0 | 0.0 |
2012 | 8712 | 0.0 | 0.0 | 0.0 |
2013 | 6092 | 0.0 | 0.0 | 0.0 |
2014 | 2959 | 0.0 | 0.0 | 0.0 |
2015 | 1921 | 0.0 | 0.0 | 0.0 |
2016 | 2049 | 0.0 | 0.0 | 0.0 |
2017 | 5657 | 0.0 | 0.0 | 0.0 |
2018 | 282 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]