X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716101909000

Well Details

Well ID: 0716101909000
Loading map...
Location: 00/09-19-071-10W6/0
Location Alias: 00/09-19-71-10 W6M
Location Alias 2: 00/09-19-071-10 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 10
Section: 19
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER ELM 9-19-71-10
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0437741
License Date: 2011-10-18
License Status: Suspension
Spud Date: 2011-10-25
Final Drill Date: 2011-11-13
Well Total Depth: 3241.00 m
Surface Hole Latitude: 55.166749
Surface Hole Longitude: -119.539547

For data sources see[1][2]

Well History

Date Event
2011-10-18 Obtained License
2011-10-28 Surface Casing Operation Performed
2011-10-31 Direction Drilling Operation Performed - Horizontal
2011-11-05 Intermediate Casing Operation Performed
2011-11-13 Finished Drilling
2011-11-13 Well Mode changed to Drilled and Cased
2011-11-18 Well Log Performed
2011-11-19 Liner Casing Operation Performed
2011-11-19 Perforation Treatment Performed - Open-Hole Completion
2011-11-19 Rig Released
2011-11-22 Well Log Performed
2011-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-02 Well Began Production
2012-01-02 Well Fluid changed to Gas
2012-01-02 Well Mode changed to Flowing
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Suspended
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-31 1517.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-19 Open Hole/Barefoot Completion 3236.00 3241.00 0
2011-11-25 Multi-Stage Fracture 2534.70 2534.80 0
2011-11-26 Multi-Stage Fracture 2440.80 2440.90 0
2011-11-26 Multi-Stage Fracture 2358.10 2358.20 0
2011-11-26 Multi-Stage Fracture 2263.40 2263.50 0
2011-11-26 Multi-Stage Fracture 2168.40 2168.50 0
2011-11-26 Multi-Stage Fracture 2112.70 2112.80 0
2011-11-25 Multi-Stage Fracture 3226.70 3226.80 0
2011-11-25 Multi-Stage Fracture 3150.10 3150.20 0
2011-11-25 Multi-Stage Fracture 3080.30 3080.40 0
2011-11-25 Multi-Stage Fracture 2996.20 2996.30 0
2011-11-25 Multi-Stage Fracture 2901.70 2901.80 0
2011-11-25 Multi-Stage Fracture 2806.00 2806.10 0
2011-11-25 Multi-Stage Fracture 2711.50 2711.60 0
2011-11-25 Multi-Stage Fracture 2629.30 2629.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8630 0.0 0.0 0.0
2013 8640 0.0 0.0 0.0
2014 8021 0.0 0.0 0.0
2015 6599 0.0 0.0 0.0
2016 4920 0.0 0.0 0.0
2017 4175 0.0 0.0 0.0
2019 432 0.0 0.0 0.0
2020 696 0.0 0.0 0.0

For data sources see[6]

References