If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716101913020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.155491,"lon":-119.533189,"icon":""}]} |
Location: 02/13-19-071-10W6/0 | |
Location Alias: 02/13-19-71-10 W6M | |
Location Alias 2: 02/13-19-071-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 10 | |
Section: 19 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CARDINAL ELM 13-19-71-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0453715 | |
License Date: 2013-01-16 | |
License Status: Issued | |
Spud Date: 2013-06-24 | |
Final Drill Date: 2013-07-06 | |
Well Total Depth: 2754.00 m | |
Surface Hole Latitude: 55.155491 | |
Surface Hole Longitude: -119.533189 |
Date | Event |
---|---|
2013-01-16 | Obtained License |
2013-06-25 | Surface Casing Operation Performed |
2013-06-26 | Direction Drilling Operation Performed - Deviate |
2013-06-29 | Direction Drilling Operation Performed - Horizontal |
2013-06-30 | Intermediate Casing Operation Performed |
2013-07-06 | Finished Drilling |
2013-07-06 | Well Log Performed |
2013-07-06 | Well Mode changed to Drilled and Cased |
2013-07-08 | Liner Casing Operation Performed |
2013-07-08 | Perforation Treatment Performed - Open-Hole Completion |
2013-07-09 | Rig Released |
2013-07-11 | Well Log Performed |
2013-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-06 | Well Began Production |
2013-08-06 | Well Fluid changed to Crude Oil |
2013-08-06 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-06-24 | Savanna Drilling Corp. | 437 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-06-26 | 1080.00 | Deviate (5 - 79 degrees) |
2013-06-29 | 1429.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-07-08 | Open Hole/Barefoot Completion | 2717.00 | 2754.00 | 0 |
2013-07-24 | Multi-Stage Fracture | 1948.80 | 1949.40 | 0 |
2013-07-24 | Multi-Stage Fracture | 1850.80 | 1851.40 | 0 |
2013-07-24 | Multi-Stage Fracture | 1752.40 | 1753.00 | 0 |
2013-07-24 | Multi-Stage Fracture | 1547.70 | 1548.30 | 0 |
2013-07-24 | Multi-Stage Fracture | 2693.50 | 2694.10 | 0 |
2013-07-24 | Multi-Stage Fracture | 2599.30 | 2599.90 | 0 |
2013-07-24 | Multi-Stage Fracture | 2506.80 | 2507.40 | 0 |
2013-07-24 | Multi-Stage Fracture | 2439.00 | 2439.60 | 0 |
2013-07-24 | Multi-Stage Fracture | 2346.30 | 2346.90 | 0 |
2013-07-24 | Multi-Stage Fracture | 2240.40 | 2241.00 | 0 |
2013-07-24 | Multi-Stage Fracture | 2146.50 | 2147.10 | 0 |
2013-07-24 | Multi-Stage Fracture | 2052.60 | 2053.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-24 | 2013-07-24 | 1,346 | 376 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 48.9469 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 24.0205 | N/A | ||
DWP-317 | Calfrac | Activator | Alkyl Amine | 8458 | 100 | 0.3195 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.3208 | N/A | ||||
DWP-981 | Calfrac | Breaker | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0821 | N/A | |
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 25.8986 | N/A | |
DWP-315 | Calfrac | Foamer | 1.2.3-Propanetriol | 56-81-5 | 100 | 0.2013 | N/A | |
1.2-Ethanediol | 107-21-1 | 100 | 0.1852 | N/A | ||||
2.4-Pentanediol. 2-methyl- | 107-41-5 | 100 | 0.1919 | N/A | ||||
Amides. coco. N.N-bis(hydroxyethyl) | 68603-42-9 | 100 | 0.1852 | N/A | ||||
Ammonium Alkyl Ether Sulfate | 68891-29-2 | 100 | 0.185 | N/A | ||||
Ethanol. 2.2'-iminobis- | 111-42-2 | 100 | 0.2013 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1852 | N/A | ||||
DWP-321 | Calfrac | Gelling Agent | Amides. coco. N.N-bis(hydroxyethyl) | 68603-42-9 | 100 | 0.5975 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.5513 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-07-13 | 2013-07-15 | Municipal Water | 540 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 3491 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8423 | 0.0 | 0.0 | 0.0 |
2016 | 8575 | 0.0 | 0.0 | 0.0 |
2017 | 8146 | 0.0 | 0.0 | 0.0 |
2018 | 8720 | 0.0 | 0.0 | 0.0 |
2019 | 8751 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-07-09 | No Incident Encountered | 0.00 | 0.00 |
2013-07-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]