X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716113606003

Well Details

Well ID: 0716113606003
Loading map...
Location: 00/06-36-071-11W6/3
Location Alias: 00/06-36-71-11 W6M
Location Alias 2: 00/06-36-071-11 W6/03
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 11
Section: 36
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER SINCLAIR 6-36-71-11
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0178675
License Date: 1995-06-19
License Status: Issued
Spud Date: 1995-06-25
Final Drill Date: 1995-08-23
Well Total Depth: 2931.00 m
Surface Hole Latitude: 55.191867
Surface Hole Longitude: -119.553337

For data sources see[1][2]

Well History

Date Event
1995-06-19 Obtained License
1995-06-30 Surface Casing Operation Performed
1995-07-30 Direction Drilling Operation Performed - Deviate
1995-08-23 Finished Drilling
1995-08-23 Well Mode changed to Drilled and Cased
1995-08-24 Well Log Performed
1995-08-25 Drill Stem Test Performed
1995-08-28 Production Casing Operation Performed
1995-08-28 Rig Released
1995-09-10 Perforation Treatment Performed - Jet Perforation
1995-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-12 Plug Back Performed
1995-09-13 Perforation Treatment Performed - Jet Perforation
1995-09-16 Perforation Treatment Performed - Fractured
1996-02-02 Well Log Performed
2000-01-09 Perforation Treatment Performed - Jet Perforation
2000-01-09 Well Mode changed to Drilled and Cased
2000-01-14 Perforation Treatment Performed - Fractured
2000-02-17 Perforation Treatment Performed - Fractured
2010-02-06 Perforation Treatment Performed - Jet Perforation
2010-03-30 Perforation Treatment Performed - Fractured
2010-04-05 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-30 2072.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-10 Perforation 2515.50 2520.00 18
2010-02-06 Perforation 1798.00 1799.00 4
2010-02-06 Perforation 1813.00 1815.00 2
2010-02-06 Perforation 1850.00 1851.50 2
2010-03-30 Fracture 1792.00 1851.50 0
1995-09-11 Acid Treatment 2515.50 2520.00 0
1995-09-12 Packing Device Capped w/Cement 2506.50 2514.50 0
1995-09-13 Perforation 2258.00 2271.50 18
1995-09-16 Fracture 2258.00 2271.50 0
2000-01-09 Perforation 2046.50 2048.00 18
2000-01-14 Fracture 2046.50 2048.00 0
2000-02-17 Fracture 2046.50 2048.00 0
2010-02-06 Perforation 1792.00 1795.00 2

For data sources see[5]



References