X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716120316000

Well Details

Well ID: 0716120316000
Loading map...
Location: 00/16-03-071-12W6/0
Location Alias: 00/16-03-71-12 W6M
Location Alias 2: 00/16-03-071-12 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 12
Section: 03
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 16-3-71-12
Operator Name: Cenovus Energy Inc.
License Number: 0092076
License Date: 1981-09-02
License Status: Suspension
Spud Date: 1981-09-07
Final Drill Date: 1981-09-30
Well Total Depth: 2600.00 m
Surface Hole Latitude: 55.123675
Surface Hole Longitude: -119.749346

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-02 Obtained License
1981-09-19 Drill Stem Test Performed
1981-09-20 Drill Stem Test Performed
1981-09-26 Drill Stem Test Performed
1981-09-29 Drill Stem Test Performed
1981-09-30 Finished Drilling
1981-10-02 Production Casing Operation Performed
1981-10-03 Well Mode changed to Drilled and Cased
1982-03-19 Perforation Treatment Performed - Jet Perforation
1982-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-21 Perforation Treatment Performed - Fractured
1982-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-02 Perforation Treatment Performed - Jet Perforation
1982-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-04 Perforation Treatment Performed - Fractured
1982-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-09 Perforation Treatment Performed - Jet Perforation
1982-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-11 Perforation Treatment Performed - Fractured
1982-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-16 Perforation Treatment Performed - Jet Perforation
1982-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-18 Perforation Treatment Performed - Fractured
1982-06-20 Perforation Treatment Performed - Fractured
1982-06-23 Perforation Treatment Performed - Jet Perforation
1982-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-25 Perforation Treatment Performed - Fractured
1982-06-27 Perforation Treatment Performed - Fractured
1982-07-02 Perforation Treatment Performed - Jet Perforation
1983-05-09 Well Began Production
1983-05-09 Well Fluid changed to Gas
1983-05-09 Well Mode changed to Flowing
1996-08-01 Well Fluid changed to Gas
1996-08-01 Well Mode changed to Flowing
2000-09-28 Perforation Treatment Performed - Jet Perforation
2000-09-28 Well Log Performed
2000-09-29 Perforation Treatment Performed - Remedial Casing
2009-03-03 Well Fluid changed to Gas
2009-03-03 Well Mode changed to Pumping
2018-03-01 Well Fluid changed to Gas
2018-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-19 Perforation 2488.00 2490.00 6
1982-06-09 Perforation 2271.00 2274.50 12
1982-06-10 Acid Treatment 2271.00 2274.50 0
1982-06-11 Fracture 2271.00 2274.50 0
1982-06-16 Packing Device Capped w/Cement 2265.00 2265.00 0
1982-06-16 Perforation 1972.00 1983.50 6
1982-06-17 Acid Treatment 1972.00 1983.50 0
1982-06-18 Fracture 1972.00 1983.50 0
1982-06-20 Fracture 1972.00 1983.50 0
1982-06-23 Perforation 1948.50 1956.00 12
1982-06-24 Acid Treatment 1948.50 1956.00 0
1982-03-19 Perforation 2476.00 2486.00 6
1982-06-25 Fracture 1948.50 1956.00 0
1982-06-27 Fracture 1948.50 1956.00 0
1982-07-02 Perforation 1972.00 1983.50 6
2000-09-28 Perforation 615.00 615.00 13
2000-09-29 Remedial Casing Cementing 0.10 615.00 0
1982-03-20 Acid Treatment 2476.00 2490.00 0
1982-03-21 Fracture 2476.00 2490.00 0
1982-06-02 Packing Device Capped w/Cement 2468.00 2468.00 0
1982-06-02 Perforation 2370.00 2376.00 12
1982-06-03 Acid Treatment 2370.00 2376.00 0
1982-06-04 Fracture 2370.00 2376.00 0
1982-06-09 Packing Device Capped w/Cement 2360.00 2360.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 67 0.0 0.0 0.0
1983 3267 0.0 0.0 0.0
1984 2657 0.0 0.0 0.0
1985 2860 0.0 0.0 0.0
1986 1718 0.0 0.0 0.0
1987 661 0.0 0.0 0.0
1988 3034 0.0 0.0 0.0
1989 4841 0.0 0.0 0.0
1990 4121 0.0 0.0 0.0
1991 5089 0.0 0.0 0.0
1992 5399 0.0 0.0 0.0
1993 7858 0.0 0.0 0.0
1994 8504 0.0 0.0 0.0
1995 4558 0.0 0.0 0.0
1996 6556 0.0 0.0 0.0
1997 6928 0.0 0.0 0.0
1998 6688 0.0 0.0 0.0
1999 8133 0.0 0.0 0.0
2000 8225 0.0 0.0 0.0
2001 8590 0.0 0.0 0.0
2002 8641 0.0 0.0 0.0
2003 8614 0.0 0.0 0.0
2004 8607 0.0 0.0 0.0
2005 8641 0.0 0.0 0.0
2006 8053 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 6191 0.0 0.0 0.0
2009 8448 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 8450 0.0 0.0 0.0
2015 8324 0.0 0.0 0.0
2016 8652 0.0 0.0 0.0
2017 5711 0.0 0.0 0.0

For data sources see[5]

References