X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716120405003

Well Details

Well ID: 0716120405003
Loading map...
Location: 00/05-04-071-12W6/3
Location Alias: 00/05-04-71-12 W6M
Location Alias 2: 00/05-04-071-12 W6/03
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 12
Section: 04
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 5-4-71-12
Operator Name: Cenovus Energy Inc.
License Number: 0410016
License Date: 2009-04-02
License Status: Issued
Spud Date: 2009-11-25
Final Drill Date: 2009-12-14
Well Total Depth: 2675.00 m
Surface Hole Latitude: 55.116311
Surface Hole Longitude: -119.797832

For data sources see[1][2]

Well History

Date Event
2009-04-02 Obtained License
2009-11-29 Surface Casing Operation Performed
2009-11-30 Direction Drilling Operation Performed - Deviate
2009-12-14 Finished Drilling
2009-12-14 Well Log Performed
2009-12-14 Well Mode changed to Drilled and Cased
2009-12-15 Production Casing Operation Performed
2009-12-16 Rig Released
2010-06-27 Perforation Treatment Performed - Jet Perforation
2010-06-30 Perforation Treatment Performed - Fractured
2010-07-01 Perforation Treatment Performed - Jet Perforation
2010-07-03 Perforation Treatment Performed - Fractured
2010-07-04 Perforation Treatment Performed - Jet Perforation
2010-07-05 Perforation Treatment Performed - Fractured
2010-08-05 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-30 644.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-27 Perforation 2571.00 2574.00 20
2010-07-01 Perforation 2547.00 2550.00 20
2010-07-03 Fracture 2497.00 2504.30 0
2010-07-03 Fracture 2547.00 2550.00 0
2010-07-04 Perforation 2008.00 2011.00 20
2010-07-05 Fracture 2008.00 2011.00 0
2010-06-27 Perforation 2566.50 2568.00 20
2010-06-27 Perforation 2557.50 2559.00 20
2010-06-27 Perforation 2588.00 2591.00 20
2010-06-27 Perforation 2582.00 2583.50 20
2010-06-27 Perforation 2576.50 2578.00 20
2010-06-30 Fracture 2557.50 2591.00 0
2010-07-01 Perforation 2502.80 2504.30 20
2010-07-01 Perforation 2497.00 2498.50 20

For data sources see[5]



References