X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716123311000

Well Details

Well ID: 0716123311000
Loading map...
Location: 00/11-33-071-12W6/0
Location Alias: 00/11-33-71-12 W6M
Location Alias 2: 00/11-33-071-12 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 12
Section: 33
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE SINCLAIR 11-33-71-12
Operator Name: Cenovus Energy Inc.
License Number: 0071481
License Date: 1978-08-21
License Status: RecCertified
Spud Date: 1978-09-03
Final Drill Date: 1978-09-23
Well Total Depth: 1527.00 m
Surface Hole Latitude: 55.195473
Surface Hole Longitude: -119.782483

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-21 Obtained License
1978-09-04 Lost Circulation Occurred
1978-09-18 Drill Stem Test Performed
1978-09-23 Finished Drilling
1978-09-26 Production Casing Operation Performed
1978-10-06 Perforation Treatment Performed - Jet Perforation
1978-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-10 Perforation Treatment Performed - Fractured
1978-10-14 Perforation Treatment Performed - Jet Perforation
1978-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-19 Perforation Treatment Performed - Fractured
1978-10-21 Perforation Treatment Performed - Jet Perforation
1978-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-10-25 Perforation Treatment Performed - Cement Squeeze
1978-10-26 Perforation Treatment Performed - Jet Perforation
1978-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-28 Perforation Treatment Performed - Fractured
1978-10-30 Perforation Treatment Performed - Fractured
1978-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-11-02 Perforation Treatment Performed - Jet Perforation
1978-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-04 Perforation Treatment Performed - Fractured
1978-11-07 Perforation Treatment Performed - Fractured
1978-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-11-10 Perforation Treatment Performed - Jet Perforation
1978-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-11 Perforation Treatment Performed - Jet Perforation
1978-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-12-15 Well Log Performed
1979-05-07 Well Mode changed to Drilled and Cased
1979-11-23 Well Abandoned
1979-11-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-06 Perforation 1414.00 1423.00 3
1978-10-21 Perforation 1345.00 1346.80 3
1978-10-21 Perforation 1346.80 1351.50 3
1978-10-24 Packing Device Capped w/Cement 1393.00 1400.00 0
1978-10-25 Cement Squeeze 1293.50 1303.00 0
1978-10-26 Perforation 1224.00 1238.00 3
1978-10-27 Acid Treatment 1224.00 1238.00 0
1978-10-28 Fracture 1224.00 1238.00 0
1978-10-30 Fracture 1224.00 1238.00 0
1978-11-02 Packing Device Capped w/Cement 1195.00 1200.00 0
1978-11-02 Perforation 704.00 706.00 3
1978-10-07 Acid Treatment 1414.00 1423.00 0
1978-11-02 Perforation 712.00 717.00 3
1978-11-03 Acid Treatment 704.00 717.00 0
1978-11-04 Fracture 704.00 717.00 0
1978-11-07 Fracture 704.00 717.00 0
1978-11-10 Packing Device Capped w/Cement 690.00 693.00 0
1978-11-10 Perforation 643.00 649.00 12
1978-11-11 Perforation 643.00 649.00 12
1978-11-11 Acid Treatment 643.00 649.00 0
1978-11-13 Packing Device Capped w/Cement 617.00 620.00 0
1978-10-08 Acid Treatment 1414.00 1423.00 0
1978-10-10 Fracture 1414.00 1423.00 0
1978-10-14 Perforation 1299.00 1303.00 3
1978-10-14 Perforation 1293.50 1299.00 3
1978-10-15 Acid Treatment 1293.50 1303.00 0
1978-10-16 Acid Treatment 1293.50 1303.00 0
1978-10-19 Fracture 1293.50 1303.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-09-04 Lost Circulation 40.00 40.00

For data sources see[5]

References