If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716130411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.122574,"lon":-119.940778,"icon":""}]} |
Location: 00/11-04-071-13W6/0 | |
Location Alias: 00/11-04-71-13 W6M | |
Location Alias 2: 00/11-04-071-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 13 | |
Section: 04 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CVE ELM 11-4-71-13 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0073225 | |
License Date: 1978-11-29 | |
License Status: Issued | |
Spud Date: 1979-02-27 | |
Final Drill Date: 1979-06-02 | |
Well Total Depth: 3520.00 m | |
Surface Hole Latitude: 55.122574 | |
Surface Hole Longitude: -119.940778 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-11-29 | Obtained License |
1979-03-17 | Lost Circulation Occurred |
1979-03-20 | Lost Circulation Occurred |
1979-03-22 | Lost Circulation Occurred |
1979-03-24 | Lost Circulation Occurred |
1979-03-25 | Lost Circulation Occurred |
1979-03-30 | Lost Circulation Occurred |
1979-04-16 | Lost Circulation Occurred |
1979-04-24 | Drill Stem Test Performed |
1979-05-12 | Drill Stem Test Performed |
1979-05-17 | Drill Stem Test Performed |
1979-06-02 | Finished Drilling |
1979-06-02 | Well Mode changed to Drilled and Cased |
1979-06-06 | Drill Stem Test Performed |
1979-06-08 | Liner Casing Operation Performed |
1979-08-09 | Perforation Treatment Performed - Jet Perforation |
1979-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-16 | Perforation Treatment Performed - Fractured |
1979-09-07 | Perforation Treatment Performed - Fractured |
1979-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-09-29 | Perforation Treatment Performed - Jet Perforation |
1979-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-10-01 | Perforation Treatment Performed - Fractured |
1979-10-05 | Perforation Treatment Performed - Fractured |
1979-10-09 | Well Log Performed |
1979-10-10 | Perforation Treatment Performed - Jet Perforation |
1980-04-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-04-29 | Perforation Treatment Performed - Jet Perforation |
1980-04-30 | Perforation Treatment Performed - Fractured |
1980-05-01 | Well Fluid changed to Gas |
1980-05-01 | Well Mode changed to Testing |
1980-05-02 | Perforation Treatment Performed - Fractured |
1980-05-04 | Perforation Treatment Performed - Jet Perforation |
2008-11-01 | Well Fluid changed to Gas |
2008-11-01 | Well Mode changed to Test Completed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-08-09 | Perforation | 3101.00 | 3105.00 | 12 |
1979-10-05 | Fracture | 2487.00 | 2497.00 | 0 |
1979-10-10 | Perforation | 2487.00 | 2497.00 | 0 |
1980-04-29 | Perforation | 2075.00 | 2087.00 | 6 |
1980-04-29 | Acid Treatment | 2075.00 | 2087.00 | 0 |
1980-04-30 | Fracture | 2075.00 | 2087.00 | 0 |
1980-05-02 | Fracture | 2075.00 | 2087.00 | 0 |
1980-05-04 | Perforation | 2075.00 | 2087.00 | 6 |
1979-08-09 | Perforation | 3077.00 | 3085.00 | 12 |
1979-08-10 | Acid Treatment | 3077.00 | 3105.00 | 0 |
1979-08-16 | Fracture | 3077.00 | 3105.00 | 0 |
1979-09-07 | Fracture | 3077.00 | 3105.00 | 0 |
1979-09-28 | Packing Device Capped w/Cement | 3060.00 | 3060.00 | 0 |
1979-09-29 | Perforation | 2487.00 | 2497.00 | 6 |
1979-09-30 | Acid Treatment | 2487.00 | 2497.00 | 0 |
1979-10-01 | Fracture | 2487.00 | 2497.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 59 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-03-17 | Lost Circulation | 1430.00 | 1430.00 |
1979-03-20 | Lost Circulation | 1556.00 | 1556.00 |
1979-03-22 | Lost Circulation | 1650.00 | 1650.00 |
1979-03-24 | Lost Circulation | 1820.00 | 1820.00 |
1979-03-25 | Lost Circulation | 1864.00 | 1864.00 |
1979-03-30 | Lost Circulation | 2067.00 | 2067.00 |
1979-04-16 | Lost Circulation | 2210.00 | 2210.00 |
For data sources see[6]