X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716131911000

Well Details

Well ID: 0716131911000
Loading map...
Location: 00/11-19-071-13W6/0
Location Alias: 00/11-19-71-13 W6M
Location Alias 2: 00/11-19-071-13 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 13
Section: 19
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE ELM 11-19-71-13
Operator Name: Cenovus Energy Inc.
License Number: 0089350
License Date: 1981-03-04
License Status: Issued
Spud Date: 1981-03-17
Final Drill Date: 1981-04-27
Well Total Depth: 2540.00 m
Surface Hole Latitude: 55.165967
Surface Hole Longitude: -119.992815

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-03-04 Obtained License
1981-03-30 Lost Circulation Occurred
1981-04-03 Drill Stem Test Performed
1981-04-18 Kick Occurred
1981-04-19 Drill Stem Test Performed
1981-04-25 Drill Stem Test Performed
1981-04-27 Finished Drilling
1981-04-30 Production Casing Operation Performed
1981-06-29 Perforation Treatment Performed - Jet Perforation
1981-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-01 Perforation Treatment Performed - Fractured
1981-07-07 Perforation Treatment Performed - Fractured
1981-07-13 Perforation Treatment Performed - Jet Perforation
1981-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-15 Perforation Treatment Performed - Fractured
1981-07-18 Perforation Treatment Performed - Fractured
1981-07-22 Well Mode changed to Drilled and Cased
1993-11-23 Well Began Production
1993-11-23 Well Fluid changed to Gas
1993-11-23 Well Mode changed to Flowing
2002-04-10 Well Fluid changed to Gas
2002-04-10 Well Mode changed to Flowing
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-06-29 Perforation 2481.00 2488.00 12
1981-06-30 Acid Treatment 2481.00 2488.00 0
1981-07-01 Fracture 2481.00 2488.00 0
1981-07-07 Fracture 2481.00 2488.00 0
1981-07-13 Perforation 2366.00 2373.50 6
1981-07-13 Perforation 2358.00 2360.00 6
1981-07-14 Acid Treatment 2358.00 2373.50 0
1981-07-15 Fracture 2358.00 2373.50 0
1981-07-18 Fracture 2358.00 2373.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 96 0.0 0.0 0.0
1993 894 0.0 0.0 0.0
1994 8491 0.0 0.0 0.0
1995 5299 0.0 0.0 0.0
1996 6261 0.0 0.0 0.0
1997 5561 0.0 0.0 0.0
1998 5591 0.0 0.0 0.0
1999 5 0.0 0.0 0.0
2002 4123 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8780 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8399 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8712 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8663 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8591 0.0 0.0 0.0
2016 8434 0.0 0.0 0.0
2017 8537 0.0 0.0 0.0
2018 7667 0.0 0.0 0.0
2019 8614 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-03-30 Lost Circulation 1687.00 1720.00
1981-04-18 Kick 2362.00 2362.00

For data sources see[6]

References