X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726032206000

Well Details

Well ID: 0726032206000
Loading map...
Location: 00/06-22-072-03W6/0
Location Alias: 00/06-22-72-03 W6M
Location Alias 2: 00/06-22-072-03 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 03
Section: 22
County/Municipality: County of Grande Prairie No. 1
Well Name: CNRL MANIR 6-22-72-3
Operator Name: Canadian Natural Resources Limited
License Number: 0128650
License Date: 1987-09-18
License Status: Issued
Spud Date: 1987-09-27
Final Drill Date: 1987-10-06
Well Total Depth: 1750.00 m
Surface Hole Latitude: 55.247314
Surface Hole Longitude: -118.372925

For data sources see[1][2]

Well History

Date Event
1987-09-18 Obtained License
1987-09-28 Surface Casing Operation Performed
1987-10-01 Lost Circulation Occurred
1987-10-06 Finished Drilling
1987-10-06 Well Mode changed to Drilled and Cased
1987-10-07 Drill Stem Test Performed
1987-10-07 Well Log Performed
1987-10-08 Drill Stem Test Performed
1987-10-10 Production Casing Operation Performed
1987-10-10 Rig Released
1987-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-27 Perforation Treatment Performed - Jet Perforation
1987-10-27 Well Log Performed
1987-11-10 Well Began Production
1987-11-10 Well Fluid changed to Crude Oil
1987-11-10 Well Mode changed to Flowing
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Suspended
2006-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-28 Plug Back Performed
2006-10-28 Well Fluid changed to Crude Oil
2006-10-28 Well Mode changed to Abandoned Zone
2011-03-31 Perforation Treatment Performed - Jet Perforation
2011-04-01 Perforation Treatment Performed - Jet Perforation
2011-04-01 Well Log Performed
2011-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Flowing
2018-05-01 Well Fluid changed to Crude Oil
2018-05-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-27 Perforation 1670.50 1672.50 13
2011-04-03 Acid Treatment 1667.00 1679.00 0
1987-10-27 Perforation 1673.50 1679.00 13
1987-10-27 Acid Treatment 1670.50 1679.00 0
2006-10-28 Packing Device Capped w/Cement 1657.00 1665.00 0
2011-03-31 Perforation 1670.50 1672.50 13
2011-03-31 Perforation 1673.50 1679.00 13
2011-04-01 Perforation 1667.00 1670.00 14
2011-04-01 Perforation 1670.50 1672.50 14
2011-04-01 Perforation 1673.50 1679.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 949 0.0 0.0 0.0
1988 1511 0.0 0.0 0.0
1989 1440 0.0 0.0 0.0
1990 745 0.0 0.0 0.0
2012 6094 0.0 0.0 0.0
2013 8467 0.0 0.0 0.0
2014 8728 0.0 0.0 0.0
2015 8740 0.0 0.0 0.0
2016 8485 0.0 0.0 0.0
2017 6319 0.0 0.0 0.0
2018 8382 0.0 0.0 0.0
2019 8049 0.0 0.0 0.0
2020 1532 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-10-01 Lost Circulation 1260.00 1260.00

For data sources see[6]

References