X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726032310000

Well Details

Well ID: 0726032310000
Loading map...
Location: 00/10-23-072-03W6/0
Location Alias: 00/10-23-72-03 W6M
Location Alias 2: 00/10-23-072-03 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 03
Section: 23
County/Municipality: County of Grande Prairie No. 1
Well Name: CNRL MANIR 10-23-72-3
Operator Name: Canadian Natural Resources Limited
License Number: 0112887
License Date: 1985-01-28
License Status: Amended
Spud Date: 1985-02-04
Final Drill Date: 1985-03-14
Well Total Depth: 3033.00 m
Surface Hole Latitude: 55.253373
Surface Hole Longitude: -118.341583

For data sources see[1][2]

Well History

Date Event
1985-01-28 Obtained License
1985-02-07 Surface Casing Operation Performed
1985-03-14 Finished Drilling
1985-03-16 Well Log Performed
1985-03-17 Drill Stem Test Performed
1985-03-21 Drill Stem Test Performed
1985-03-22 Drill Stem Test Performed
1985-03-23 Drill Stem Test Performed
1985-03-26 Production Casing Operation Performed
1985-03-26 Rig Released
1985-03-26 Well Mode changed to Drilled and Cased
1985-06-07 Well Log Performed
1985-06-08 Well Log Performed
1985-06-09 Perforation Treatment Performed - Jet Perforation
1985-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-12 Perforation Treatment Performed - Jet Perforation
1985-06-15 Perforation Treatment Performed - Cement Squeeze
1985-06-20 Perforation Treatment Performed - Jet Perforation
1985-06-22 Perforation Treatment Performed - Jet Perforation
1985-06-26 Perforation Treatment Performed - Jet Perforation
1985-06-27 Perforation Treatment Performed - Cement Squeeze
1985-06-28 Perforation Treatment Performed - Jet Perforation
1985-06-29 Perforation Treatment Performed - Jet Perforation
1985-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-01 Well Began Production
1985-07-01 Well Fluid changed to Crude Oil
1985-07-01 Well Mode changed to Flowing
1986-01-16 Perforation Treatment Performed - Jet Perforation
1986-01-17 Well Log Performed
1986-01-18 Perforation Treatment Performed - Jet Perforation
1986-01-19 Well Log Performed
1986-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-20 Plug Back Performed
1986-01-20 Well Fluid changed to Crude Oil
1986-01-20 Well Log Performed
1986-01-20 Well Mode changed to Abandoned Zone
1986-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-21 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Remedial Casing
1986-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-23 Perforation Treatment Performed - Jet Perforation
1986-01-24 Perforation Treatment Performed - Remedial Casing
1992-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-02 Perforation Treatment Performed - Jet Perforation
1992-01-03 Perforation Treatment Performed - Remedial Casing
1992-01-06 Perforation Treatment Performed - Jet Perforation
1992-01-06 Well Log Performed
1992-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-27 Well Log Performed
1996-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-05 Well Log Performed
2012-09-15 Well Log Performed
2012-09-16 Perforation Treatment Performed - Jet Perforation
2012-09-16 Well Log Performed
2012-09-17 Perforation Treatment Performed - Remedial Casing
2012-12-20 Well Log Performed
2012-12-29 Well Log Performed
2012-12-31 Well Log Performed
2013-01-01 Well Log Performed
2016-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-09 Perforation 2877.00 2885.00 3
1985-06-29 Perforation 2753.00 2756.00 3
1985-07-01 Acid Treatment 2753.00 2756.00 0
1986-01-16 Perforation 2776.80 2777.30 13
1986-01-18 Perforation 2764.80 2765.30 13
1986-01-20 Packing Device Capped w/Cement 2745.20 2749.00 0
1986-01-21 Perforation 1648.00 1649.80 13
1986-01-21 Acid Treatment 1648.00 1649.80 0
1986-01-22 Remedial Casing Cementing 1648.00 1649.80 0
1986-01-23 Perforation 1615.00 1616.80 13
1986-01-23 Acid Treatment 1615.00 1616.80 0
1985-06-11 Packing Device Capped w/Cement 2867.00 2870.00 0
1986-01-24 Remedial Casing Cementing 1615.00 1616.80 0
1992-01-02 Perforation 1595.80 1596.10 13
1992-01-02 Acid Treatment 1595.80 1596.10 0
1992-01-03 Remedial Casing Cementing 1595.80 1596.10 0
1992-01-06 Perforation 1628.00 1631.00 13
1992-01-07 Acid Treatment 1628.00 1631.00 0
1996-02-29 Packing Device Capped w/Cement 1637.00 1645.00 0
2012-09-16 Perforation 1084.50 1085.50 13
2012-09-16 Perforation 1082.00 1083.00 13
2012-09-16 Perforation 788.00 789.00 13
1985-06-12 Perforation 2766.50 2772.00 3
2012-09-17 Remedial Casing Cementing 788.00 1085.50 0
2016-03-10 Acid Treatment 1628.00 1631.00 0
1985-06-15 Cement Squeeze 2766.50 2772.00 0
1985-06-20 Perforation 2760.00 2762.00 3
1985-06-22 Perforation 2762.00 2764.50 3
1985-06-26 Perforation 2769.00 2769.30 3
1985-06-27 Cement Squeeze 2760.00 2769.30 0
1985-06-28 Perforation 2753.00 2756.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 120 0.0 0.0 0.0
1986 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-03 No Incident Encountered 0.00 0.00
2016-03-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References