X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726040604000

Well Details

Well ID: 0726040604000
Loading map...
Location: 00/04-06-072-04W6/0
Location Alias: 00/04-06-72-04 W6M
Location Alias 2: 00/04-06-072-04 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 04
Section: 06
County/Municipality: County of Grande Prairie No. 1
Well Name: CNRL GRANDPR 4-6-72-4
Operator Name: Canadian Natural Resources Limited
License Number: 0226828
License Date: 1999-09-28
License Status: Suspension
Spud Date: 1999-10-04
Final Drill Date: 1999-10-10
Well Total Depth: 1867.00 m
Surface Hole Latitude: 55.203296
Surface Hole Longitude: -118.609839

For data sources see[1][2]

Well History

Date Event
1999-09-28 Obtained License
1999-10-06 Surface Casing Operation Performed
1999-10-10 Finished Drilling
1999-10-11 Well Log Performed
1999-10-12 Drill Stem Test Performed
1999-10-13 Production Casing Operation Performed
1999-10-13 Rig Released
1999-10-13 Well Mode changed to Drilled and Cased
1999-10-17 Well Log Performed
1999-10-18 Perforation Treatment Performed - Jet Perforation
1999-10-18 Well Log Performed
1999-11-01 Well Log Performed
1999-12-08 Well Began Production
1999-12-08 Well Fluid changed to Gas
1999-12-08 Well Mode changed to Flowing
2000-03-25 Perforation Treatment Performed - Jet Perforation
2000-03-26 Well Fluid changed to Gas
2000-03-26 Well Mode changed to Flowing
2001-05-18 Perforation Treatment Performed - Jet Perforation
2001-05-18 Well Log Performed
2005-09-24 Perforation Treatment Performed - Jet Perforation
2005-09-24 Well Log Performed
2005-09-25 Perforation Treatment Performed - Remedial Casing
2005-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-11-01 Well Fluid changed to Gas
2008-11-01 Well Mode changed to Suspended
2010-02-05 Well Log Performed
2010-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-06 Plug Back Performed
2010-02-06 Well Fluid changed to Gas
2010-02-06 Well Mode changed to Abandoned Zone
2010-02-07 Perforation Treatment Performed - Jet Perforation
2010-02-07 Well Log Performed
2010-02-08 Perforation Treatment Performed - Remedial Casing
2010-02-09 Perforation Treatment Performed - Jet Perforation
2010-02-09 Well Log Performed
2010-02-11 Perforation Treatment Performed - Jet Perforation
2010-02-14 Perforation Treatment Performed - Remedial Casing
2010-02-16 Perforation Treatment Performed - Jet Perforation
2010-02-16 Well Log Performed
2010-02-17 Perforation Treatment Performed - Remedial Casing
2010-02-18 Perforation Treatment Performed - Jet Perforation
2010-02-18 Well Log Performed
2010-02-19 Perforation Treatment Performed - Remedial Casing
2010-02-20 Perforation Treatment Performed - Jet Perforation
2010-02-20 Well Log Performed
2010-02-24 Perforation Treatment Performed - Remedial Casing
2010-02-25 Perforation Treatment Performed - Jet Perforation
2010-02-25 Well Log Performed
2010-02-27 Perforation Treatment Performed - Jet Perforation
2010-02-27 Well Log Performed
2010-02-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-10-18 Perforation 1845.00 1846.00 17
2010-02-08 Remedial Casing Cementing 899.40 900.00 0
2010-02-08 Remedial Casing Cementing 839.40 840.00 0
2010-02-09 Perforation 539.40 540.00 99
2010-02-09 Perforation 402.40 403.00 99
2010-02-11 Perforation 468.00 468.60 99
2010-02-14 Remedial Casing Cementing 539.40 540.00 0
2010-02-14 Remedial Casing Cementing 402.40 403.00 0
2010-02-14 Remedial Casing Cementing 468.00 468.60 0
2010-02-16 Perforation 486.00 486.70 99
2010-02-17 Remedial Casing Cementing 486.00 486.70 0
2000-03-25 Perforation 1833.60 1834.60 17
2010-02-18 Perforation 449.00 449.70 99
2010-02-19 Remedial Casing Cementing 449.00 449.70 0
2010-02-20 Perforation 423.00 423.30 99
2010-02-24 Remedial Casing Cementing 423.00 423.30 0
2010-02-25 Perforation 401.70 402.00 99
2010-02-25 Perforation 372.00 372.30 99
2010-02-27 Perforation 392.00 392.30 99
2010-02-28 Remedial Casing Cementing 401.40 402.00 0
2010-02-28 Remedial Casing Cementing 372.00 372.30 0
2010-02-28 Remedial Casing Cementing 392.00 392.30 0
2001-05-18 Perforation 1824.50 1826.00 17
2005-09-24 Perforation 374.00 375.00 20
2005-09-25 Remedial Casing Cementing 374.00 375.00 0
2005-10-19 Acid Treatment 1824.50 1834.60 0
2010-02-06 Packing Device Capped w/Cement 1810.00 1818.00 0
2010-02-07 Perforation 899.40 900.00 99
2010-02-07 Perforation 839.40 840.00 99

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 492 0.0 0.0 0.0
2000 4380 0.0 0.0 0.0
2001 7819 0.0 0.0 0.0
2002 8329 0.0 0.0 0.0
2003 8606 0.0 0.0 0.0
2004 8652 0.0 0.0 0.0
2005 5897 0.0 0.0 0.0

For data sources see[5]

References