X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726040706000

Well Details

Well ID: 0726040706000
Loading map...
Location: 00/06-07-072-04W6/0
Location Alias: 00/06-07-72-04 W6M
Location Alias 2: 00/06-07-072-04 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 04
Section: 07
County/Municipality: County of Grande Prairie No. 1
Well Name: CARDINAL GRANDPR 6-7-72-4
Operator Name: Cardinal Energy Ltd.
License Number: 0111194
License Date: 1984-11-30
License Status: Issued
Spud Date: 1984-12-17
Final Drill Date: 1984-12-30
Well Total Depth: 1925.00 m
Surface Hole Latitude: 55.220932
Surface Hole Longitude: -118.603640

For data sources see[1][2]

Well History

Date Event
1984-11-30 Obtained License
1984-12-19 Surface Casing Operation Performed
1984-12-26 Drill Stem Test Performed
1984-12-29 Drill Stem Test Performed
1984-12-30 Finished Drilling
1984-12-30 Well Mode changed to Drilled and Cased
1984-12-31 Well Log Performed
1985-01-01 Production Casing Operation Performed
1985-01-01 Rig Released
1985-01-17 Perforation Treatment Performed - Jet Perforation
1985-01-17 Well Log Performed
1985-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-22 Perforation Treatment Performed - Jet Perforation
1985-01-22 Well Log Performed
1985-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-02 Well Began Production
1985-02-02 Well Fluid changed to Crude Oil
1985-02-02 Well Mode changed to Pumping
1987-05-22 Well Fluid changed to Crude Oil
1987-05-22 Well Mode changed to Suspended
1988-05-17 Well Fluid changed to Crude Oil
1988-05-17 Well Mode changed to Flowing
1990-10-17 Well Fluid changed to Crude Oil
1990-10-17 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-17 Perforation 1849.50 1850.00 13
1985-01-17 Perforation 1852.50 1854.50 13
1985-01-18 Acid Treatment 1849.50 1854.50 0
1985-01-20 Acid Treatment 1849.50 1854.50 0
1985-01-22 Perforation 1833.50 1836.00 13
1985-01-23 Acid Treatment 1833.50 1836.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3248 0.0 0.0 0.0
1986 768 0.0 0.0 0.0
1988 456 0.0 0.0 0.0
1989 2475 0.0 0.0 0.0
1990 8738 0.0 0.0 0.0
1991 8639 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8597 0.0 0.0 0.0
1994 8153 0.0 0.0 0.0
1995 8387 0.0 0.0 0.0
1996 8617 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8711 0.0 0.0 0.0
1999 8710 0.0 0.0 0.0
2000 8753 0.0 0.0 0.0
2001 8210 0.0 0.0 0.0
2002 8588 0.0 0.0 0.0
2003 8623 0.0 0.0 0.0
2004 8645 0.0 0.0 0.0
2005 8038 0.0 0.0 0.0
2006 2247 0.0 0.0 0.0
2007 7462 0.0 0.0 0.0
2008 8472 0.0 0.0 0.0
2009 8088 0.0 0.0 0.0
2010 8468 0.0 0.0 0.0
2011 5143 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 7656 0.0 0.0 0.0
2014 8496 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8015 0.0 0.0 0.0
2018 7751 0.0 0.0 0.0
2019 8625 0.0 0.0 0.0
2020 1896 0.0 0.0 0.0

For data sources see[5]

References