X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726041902002

Well Details

Well ID: 0726041902002
Loading map...
Location: 00/02-19-072-04W6/2
Location Alias: 00/02-19-72-04 W6M
Location Alias 2: 00/02-19-072-04 W6/02
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 04
Section: 19
County/Municipality: County of Grande Prairie No. 1
Well Name: CNRL GRANDPR 2-19-72-4
Operator Name: Canadian Natural Resources Limited
License Number: 0162785
License Date: 1993-12-02
License Status: Suspension
Spud Date: 1993-12-03
Final Drill Date: 1994-01-29
Well Total Depth: 3325.00 m
Surface Hole Latitude: 55.246446
Surface Hole Longitude: -118.603264

For data sources see[1][2]

Well History

Date Event
1993-12-02 Obtained License
1993-12-06 Surface Casing Operation Performed
1993-12-08 Well Log Performed
1993-12-15 Direction Drilling Operation Performed - Deviate
1993-12-18 Well Log Performed
1993-12-19 Well Log Performed
1993-12-20 Drill Stem Test Performed
1993-12-22 Intermediate Casing Operation Performed
1994-01-20 Well Log Performed
1994-01-29 Finished Drilling
1994-01-30 Well Log Performed
1994-01-31 Drill Stem Test Performed
1994-02-02 Well Log Performed
1994-02-03 Liner Casing Operation Performed
1994-02-04 Rig Released
1994-02-24 Well Log Performed
1994-02-28 Perforation Treatment Performed - Jet Perforation
1994-02-28 Well Log Performed
1994-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-12 Well Log Performed
1994-03-13 Perforation Treatment Performed - Cement Squeeze
1994-03-13 Plug Back Performed
1994-03-15 Perforation Treatment Performed - Jet Perforation
1994-03-15 Well Log Performed
1994-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-26 Plug Back Performed
1994-03-26 Well Log Performed
1994-03-27 Perforation Treatment Performed - Jet Perforation
1994-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-31 Plug Back Performed
1994-04-04 Perforation Treatment Performed - Jet Perforation
1994-04-04 Well Log Performed
1994-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-23 Plug Back Performed
1994-04-23 Well Log Performed
1994-04-24 Perforation Treatment Performed - Jet Perforation
1994-04-25 Perforation Treatment Performed - Cement Squeeze
1994-04-25 Plug Back Performed
1994-04-29 Perforation Treatment Performed - Jet Perforation
1994-05-01 Perforation Treatment Performed - Fractured
1994-05-05 Perforation Treatment Performed - Fractured
1994-05-09 Well Log Performed
1994-05-10 Well Log Performed
1994-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-11 Perforation Treatment Performed - Jet Perforation
1994-05-11 Well Log Performed
1994-05-14 Perforation Treatment Performed - Fractured
1995-02-22 Well Log Performed
1995-02-26 Perforation Treatment Performed - Jet Perforation
1995-02-26 Well Log Performed
1995-02-28 Perforation Treatment Performed - Fractured
1995-03-01 Well Mode changed to Drilled and Cased
1995-03-06 Well Log Performed
1998-05-27 Well Began Production
1998-05-27 Well Fluid changed to Gas
1998-05-27 Well Mode changed to Flowing
1998-07-10 Well Fluid changed to Gas
1998-07-10 Well Mode changed to Suspended
1999-06-01 Well Structure changed to Commingled
2006-03-30 Perforation Treatment Performed - Jet Perforation
2006-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-12-15 1848.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-28 Perforation 3262.00 3266.40 14
1994-03-17 Acid Treatment 3262.00 3264.40 0
1994-03-26 Packing Device Capped w/Cement 3252.00 3260.00 0
1994-03-27 Perforation 3155.00 3159.00 13
1994-03-29 Acid Treatment 3155.00 3159.00 0
1994-03-31 Packing Device Capped w/Cement 3145.00 3153.00 0
1994-04-04 Perforation 2594.50 2598.50 13
1994-04-06 Acid Treatment 2594.50 2598.50 0
1994-04-23 Packing Device Capped w/Cement 2582.00 2590.00 0
1994-04-24 Perforation 2158.00 2159.00 7
1994-04-24 Perforation 2170.50 2171.50 7
1994-02-28 Perforation 3269.50 3271.00 14
1994-04-25 Cement Squeeze 2158.00 2171.50 0
1994-04-29 Perforation 2177.00 2179.00 13
1994-04-29 Perforation 2180.00 2185.00 13
1994-05-01 Fracture 2177.00 2185.00 0
1994-05-05 Fracture 2177.00 2185.00 0
1994-05-11 Packing Device Capped w/Cement 2195.50 2198.00 0
1994-05-11 Perforation 2177.00 2178.50 13
1994-05-11 Perforation 2180.00 2185.00 13
1994-05-14 Fracture 2177.00 2185.00 0
1995-02-26 Perforation 1983.00 2001.00 13
1994-02-28 Perforation 3271.80 3272.50 14
1995-02-26 Perforation 2003.00 2006.00 13
1995-02-28 Fracture 1983.00 2006.00 0
2006-03-30 Perforation 1823.50 1828.00 16
2006-04-01 Acid Treatment 1823.50 1828.00 0
1994-02-28 Perforation 3273.50 3276.00 14
1994-02-28 Perforation 3277.20 3278.20 14
1994-03-07 Acid Treatment 3269.50 3278.20 0
1994-03-10 Acid Treatment 3262.00 3266.40 0
1994-03-13 Cement Squeeze 3262.00 3278.20 0
1994-03-15 Perforation 3262.00 3264.40 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 90 0.0 0.0 0.0
1998 877 0.0 0.0 0.0

For data sources see[6]

References