X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726042014020

Well Details

Well ID: 0726042014020
Loading map...
Location: 02/14-20-072-04W6/0
Location Alias: 02/14-20-72-04 W6M
Location Alias 2: 02/14-20-072-04 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 04
Section: 20
County/Municipality: County of Grande Prairie No. 1
Well Name: AOSC 102 HZ MANIR 14-20-72-4
Operator Name: Athabasca Oil Corporation
License Number: 0442021
License Date: 2011-12-23
License Status: Suspension
Spud Date: 2012-01-16
Final Drill Date: 2012-01-31
Well Total Depth: 3427.00 m
Surface Hole Latitude: 55.242725
Surface Hole Longitude: -118.588929

For data sources see[1][2]

Well History

Date Event
2011-12-23 Obtained License
2012-01-17 Surface Casing Operation Performed
2012-01-22 Well Log Performed
2012-01-23 Direction Drilling Operation Performed - Deviate
2012-01-25 Direction Drilling Operation Performed - Horizontal
2012-01-31 Finished Drilling
2012-01-31 Well Mode changed to Drilled and Cased
2012-02-03 Perforation Treatment Performed - Open-Hole Completion
2012-02-03 Production Casing Operation Performed
2012-02-04 Rig Released
2012-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-18 Plug Back Performed
2015-09-18 Well Mode changed to Abandoned Zone

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-16 Precision Drilling Corporation 407 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-23 1573.30 Deviate (5 - 79 degrees)
2012-01-25 1904.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-03 Open Hole/Barefoot Completion 3424.00 3427.00 0
2012-02-24 Multi-Stage Fracture 2626.40 2626.50 0
2012-02-24 Multi-Stage Fracture 2523.60 2523.70 0
2012-02-24 Multi-Stage Fracture 2425.00 2425.10 0
2012-02-24 Multi-Stage Fracture 2347.10 2347.20 0
2012-02-25 Multi-Stage Fracture 2245.20 2245.30 0
2012-02-25 Multi-Stage Fracture 2156.20 2156.30 0
2012-02-25 Multi-Stage Fracture 2062.50 2062.60 0
2015-09-18 Packing Device Capped w/Cement 1881.80 1882.10 0
2012-02-23 Multi-Stage Fracture 3354.00 3354.10 0
2012-02-23 Multi-Stage Fracture 3270.70 3270.80 0
2012-02-23 Multi-Stage Fracture 3180.70 3180.80 0
2012-02-23 Multi-Stage Fracture 3090.40 3090.50 0
2012-02-23 Multi-Stage Fracture 2999.90 3000.00 0
2012-02-23 Multi-Stage Fracture 2896.90 2897.00 0
2012-02-24 Multi-Stage Fracture 2806.20 2806.30 0
2012-02-24 Multi-Stage Fracture 2716.00 2716.10 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-05 No Incident Encountered 0.00 0.00
2015-09-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References