If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0726092508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.251893,"lon":-119.234205,"icon":""}]} |
Location: 00/08-25-072-09W6/0 | |
Location Alias: 00/08-25-72-09 W6M | |
Location Alias 2: 00/08-25-072-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 072 | |
Meridian: 6 | |
Range: 09 | |
Section: 25 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: TRILOGY HZ ALBRT 8-25-72-9 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0449580 | |
License Date: 2012-10-30 | |
License Status: Issued | |
Spud Date: 2012-12-16 | |
Final Drill Date: 2013-01-17 | |
Well Total Depth: 3622.00 m | |
Surface Hole Latitude: 55.251893 | |
Surface Hole Longitude: -119.234205 |
Date | Event |
---|---|
2012-10-30 | Obtained License |
2012-12-18 | Surface Casing Operation Performed |
2013-01-04 | Direction Drilling Operation Performed - Deviate |
2013-01-12 | Direction Drilling Operation Performed - Horizontal |
2013-01-17 | Finished Drilling |
2013-01-17 | Well Mode changed to Drilled and Cased |
2013-01-22 | Intermediate Casing Operation Performed |
2013-01-24 | Liner Casing Operation Performed |
2013-01-24 | Rig Released |
2013-01-28 | Well Log Performed |
2013-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-04 | Perforation Treatment Performed - Open-Hole Completion |
2013-02-07 | Well Began Production |
2013-02-07 | Well Fluid changed to Crude Oil |
2013-02-07 | Well Mode changed to Flowing |
2013-10-06 | Well Fluid changed to Crude Oil |
2013-10-06 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-16 | Precision Drilling Corporation | 212 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-01-04 | 814.40 | Deviate (5 - 79 degrees) |
2013-01-12 | 2183.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-04 | Open Hole/Barefoot Completion | 3617.00 | 3622.00 | 0 |
2013-02-04 | Multi-Stage Fracture | 3022.60 | 3022.70 | 0 |
2013-02-04 | Multi-Stage Fracture | 2946.40 | 2946.50 | 0 |
2013-02-04 | Multi-Stage Fracture | 2874.40 | 2874.50 | 0 |
2013-02-04 | Multi-Stage Fracture | 2798.10 | 2798.20 | 0 |
2013-02-04 | Multi-Stage Fracture | 2737.20 | 2737.30 | 0 |
2013-02-04 | Multi-Stage Fracture | 2661.10 | 2661.20 | 0 |
2013-02-04 | Multi-Stage Fracture | 2585.40 | 2585.50 | 0 |
2013-02-04 | Multi-Stage Fracture | 2509.50 | 2509.60 | 0 |
2013-02-04 | Multi-Stage Fracture | 2447.50 | 2447.60 | 0 |
2013-02-04 | Multi-Stage Fracture | 2371.80 | 2371.90 | 0 |
2013-02-04 | Multi-Stage Fracture | 3591.20 | 3591.30 | 0 |
2013-02-04 | Multi-Stage Fracture | 2295.60 | 2295.70 | 0 |
2013-02-04 | Multi-Stage Fracture | 2233.60 | 2233.70 | 0 |
2013-02-04 | Multi-Stage Fracture | 3527.40 | 3527.50 | 0 |
2013-02-04 | Multi-Stage Fracture | 3464.80 | 3464.90 | 0 |
2013-02-04 | Multi-Stage Fracture | 3388.10 | 3388.20 | 0 |
2013-02-04 | Multi-Stage Fracture | 3312.50 | 3312.60 | 0 |
2013-02-04 | Multi-Stage Fracture | 3236.50 | 3236.60 | 0 |
2013-02-04 | Multi-Stage Fracture | 3160.40 | 3160.50 | 0 |
2013-02-04 | Multi-Stage Fracture | 3098.70 | 3098.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-04 | 2013-02-04 | 2,054 | 1,093 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 45.6285 | N/A | |||
30/50 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 16.2325 | N/A | ||
DWP-317 | Calfrac | Activator | Alkyl Amine | 8458 | 100 | 0.2804 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.2812 | N/A | ||||
DWP-981 | Calfrac | Breaker | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0444 | N/A | |
Liquid CO2 | Calfrac | Energizing Fluid | Carbon Dioxide | 124-38-9 | 100 | 24.3596 | N/A | |
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 35.9424 | N/A | |
DWP-315 | Calfrac | Foamer | 1.2.3-Propanetriol | 56-81-5 | 100 | 0.1582 | N/A | |
1.2-Ethanediol | 107-21-1 | 100 | 0.1512 | N/A | ||||
2.4-Pentanediol. 2-methyl- | 107-41-5 | 100 | 0.1549 | N/A | ||||
Amides. coco. N.N-bis(hydroxyethyl) | 68603-42-9 | 100 | 0.1512 | N/A | ||||
Ammonium Alkyl Ether Sulfate | 68891-29-2 | 100 | 0.1509 | N/A | ||||
Ethanol. 2.2'-iminobis- | 111-42-2 | 100 | 0.1582 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1512 | N/A | ||||
DWP-321 | Calfrac | Gelling Agent | Amides. coco. N.N-bis(hydroxyethyl) | 68603-42-9 | 100 | 0.532 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.5053 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-01-28 | 2013-02-03 | Municipal Water | 1267 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 4692 | 0.0 | 0.0 | 0.0 |
2014 | 7089 | 0.0 | 0.0 | 0.0 |
2015 | 6830 | 0.0 | 0.0 | 0.0 |
2016 | 4564 | 0.0 | 0.0 | 0.0 |
2017 | 6823 | 0.0 | 0.0 | 0.0 |
2018 | 8355 | 0.0 | 0.0 | 0.0 |
2019 | 1970 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-24 | No Incident Encountered | 0.00 | 0.00 |
2013-02-06 | No Incident Encountered | 0.00 | 0.00 |
2013-10-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]