If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0726093007002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.264073,"lon":-119.366844,"icon":""}]} |
Location: 00/07-30-072-09W6/2 | |
Location Alias: 00/07-30-72-09 W6M | |
Location Alias 2: 00/07-30-072-09 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 072 | |
Meridian: 6 | |
Range: 09 | |
Section: 30 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CARDINAL WEMBLEY 7-30-72-9 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0360186 | |
License Date: 2006-07-14 | |
License Status: Amended | |
Spud Date: 2006-10-05 | |
Final Drill Date: 2006-10-17 | |
Well Total Depth: 2440.00 m | |
Surface Hole Latitude: 55.264073 | |
Surface Hole Longitude: -119.366844 |
Date | Event |
---|---|
2006-07-14 | Obtained License |
2006-10-07 | Surface Casing Operation Performed |
2006-10-11 | Direction Drilling Operation Performed - Deviate |
2006-10-17 | Finished Drilling |
2006-10-17 | Well Log Performed |
2006-10-17 | Well Mode changed to Drilled and Cased |
2006-10-18 | Production Casing Operation Performed |
2006-10-19 | Rig Released |
2006-11-24 | Perforation Treatment Performed - Jet Perforation |
2006-11-24 | Well Log Performed |
2006-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-11-30 | Perforation Treatment Performed - Jet Perforation |
2006-11-30 | Plug Back Performed |
2006-12-04 | Perforation Treatment Performed - Fractured |
2006-12-08 | Perforation Treatment Performed - Jet Perforation |
2006-12-12 | Perforation Treatment Performed - Fractured |
2007-03-19 | Well Began Production |
2007-03-19 | Well Fluid changed to Gas |
2007-03-19 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-10-11 | 1924.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-11-24 | Perforation | 1690.50 | 1694.00 | 17 |
2006-11-27 | Acid Treatment | 1690.50 | 1694.00 | 0 |
2006-11-30 | Packing Device Capped w/Cement | 1676.80 | 1685.00 | 0 |
2006-11-30 | Perforation | 1632.00 | 1637.00 | 17 |
2006-12-04 | Fracture | 1632.00 | 1637.00 | 0 |
2006-12-08 | Perforation | 1567.00 | 1569.00 | 17 |
2006-12-12 | Fracture | 1567.00 | 1569.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 3935 | 0.0 | 0.0 | 0.0 |
2008 | 988 | 0.0 | 0.0 | 0.0 |
2009 | 686 | 0.0 | 0.0 | 0.0 |
2010 | 1107 | 0.0 | 0.0 | 0.0 |
2011 | 1009 | 0.0 | 0.0 | 0.0 |
2012 | 63 | 0.0 | 0.0 | 0.0 |
2016 | 257 | 0.0 | 0.0 | 0.0 |
2017 | 8620 | 0.0 | 0.0 | 0.0 |
2018 | 8715 | 0.0 | 0.0 | 0.0 |
2019 | 8584 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]